BSEE uses the information collected to ascertain the condition of drilling sites for the purpose of preventing hazards inherent in sulfur drilling and production operations and to evaluate the adequacy of equipment and/or procedures to be used during the conduct of drilling, well-completion, well-workover, and production operations.
The latest form for 30 CFR 250, Subpart P, Sulfur Operators expires 2023-02-28 and can be found here.
Document Name |
---|
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supporting Statement A |
Approved without change |
Extension without change of a currently approved collection | 2022-09-16 | |
Approved without change |
Extension without change of a currently approved collection | 2019-12-20 | |
Approved without change |
Revision of a currently approved collection | 2016-11-16 | |
Approved without change |
Extension without change of a currently approved collection | 2013-10-29 | |
Approved without change |
Extension without change of a currently approved collection | 2011-10-13 |
Federal Enterprise Architecture: Energy - Energy Production