NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR part 63, subpart II) (Renewal)

1712t12

OMB: 2060-0330

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1a
Table 1b
Table 1c
Table 2
Capital O&M
Responses
Respondents


Sheet 1: Summary

ICR Summary Information
Hours per Response 256
Number of Respondents 56
Total Estimated Burden Hours 28,700
Total Estimated Costs $3,390,000
Annualized Capital O&M $0
Form Number Not Applicable

Sheet 2: Table 1a

Table 1a: Annual Respondent Burden and Cost – NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR Part 63, Subpart II) (Renewal) (Private Sector)






















Burden Item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year
(C=AxB)
(D)
Respondents per year a
(E)
Technical person- hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Management $163.17
3. Reporting Requirements








Technical $130.28
a. Familiarization with Regulatory Requirements 1 1 1 50 50 2.5 5 $7,250.48
Clerical $65.71
b. Required Activities See 3e









c. Create Information See 3e









d. Gather Existing Information See 3e









e. Write Report










Notification of Construction/Reconstructionc 2 1 2 0 0 0 0 $0


Notification of Demonstration of CMSc N/A









Report of Performance Testc N/A









Initial Notification and Implementationc 14 1 14 0 0 0 0 $0


Semiannual Notification of Compliance Status 8 2 16 50 800 40 80 $116,007.60


Subtotal for Reporting Requirements



978 $123,258.08


4. Recordkeeping Requirements










a. Familiarization with Regulatory Requirements See 3e









b. Plan Activities N/A









c. Implement Activities 8 50 400 50 20000 1000 2000 $2,900,190.00


d. Develop Record Systemc 8 1 8 0 0 0 0 $0


e. Train Personnel 28 1 28 50 1400 70 140 $203,013.30


g. Audits N/A









Subtotal for Recordkeeping Requirements
24,610 $3,103,203


Total Labor Burden and Costs (rounded) d
25,600 $3,230,000


Total Capital and O&M Cost (rounded) d
$0


GRAND TOTAL (rounded) d
$3,230,000














Assumptions:










a Number of affected facilities per year is 56. We assume 90 percent of sources are in the private sector, or approximately 50 respondents. We have assumed that there will be no new growth over the three-year period of this ICR. We assume that each respondent will have to familiarize with the regulatory requirements each year.


b This ICR uses the following labor rates: Managerial $163.17 ($77.70 + 110%); Technical $130.28 ($62.04 + 110%); and Clerical $65.71 ($31.29 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


c We have assumed this is a one-time-only cost.


d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 3: Table 1b

Table 1b: Annual Respondent Burden and Cost – NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR Part 63, Subpart II) (Renewal) (Public Sector)






















Burden Item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year
(C=AxB)
(D)
Respondents per year a
(E)
Technical person- hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Management $73.46
3. Reporting Requirements








Technical $54.51
a. Familiarization with Regulatory Requirements 1 1 1 6 6 0.3 0.6 $366.80
Clerical $29.50
b. Required Activities See 3e









c. Create Information See 3e









d. Gather Existing Information See 3e









e. Write Report










Notification of Construction/Reconstructionc 2 1 2 0 0 0 0 $0


Notification of Demonstration of CMSc N/A









Report of Performance Testc N/A









Initial Notification and Implementationc 14 1 14 0 0 0 0 $0


Semiannual Notification of Compliance Status 8 2 16 6 96 4.8 10 $5,868.77


Subtotal for Reporting Requirements



117 $6,235.57


4. Recordkeeping Requirements










a. Familiarization with Regulatory Requirements See 3e









b. Plan Activities N/A









c. Implement Activities 8 50 400 6 2400 120 240 $146,719.20


d. Develop Record Systemc 8 1 8 0 0 0 0 $0


e. Train Personnel 28 1 28 6 168 8.4 16.8 $10,270.34


g. Audits N/A









Subtotal for Recordkeeping Requirements
2,953 $156,990


Total Labor Burden and Costs (rounded) d
3,070 $163,000


Total Capital and O&M Cost (rounded) d
$0


GRAND TOTAL (rounded) d
$163,000














Assumptions:










a Number of affected facilities per year is 56. We assume 10 percent of sources are in the public sector, or approximately 6 respondents. We have assumed that there will be no new growth over the three-year period of this ICR. We assume that each respondent will have to familiarize with the regulatory requirements each year.


b This cost is based on the average hourly labor rate as follows: Managerial $73.46 (GS-13, Step 5, $45.91 + 60%); Technical $54.51 (GS-12, Step 1, $34.07 + 60%); and Clerical $29.50 (GS-6, Step 3, $18.44 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c We have assumed this is a one-time-only cost.


d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 4: Table 1c

Table 1c: Annual Respondent Burden and Cost Breakdown by Affected Sector – NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR Part 63, Subpart II) (Renewal)








Affected Sector Number of Responses Labor Hours Labor Cost Capital and O&M Cost


Reporting Recordkeeping Total


Private 50 978 24,610 25,600 $3,230,000 $0


Public (Federal) 6 117 2,953 3,070 $163,000 $0


Total a 56 1,090 27,600 28,700 $3,390,000 $0
256 hr/response
a Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.









Sheet 5: Table 2

Table 2: Average Annual EPA Burden and Cost – NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR Part 63, Subpart II) (Renewal)






















Burden item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year (C=AxB)
(D)
Respondents per year a
(E)
Technical person- hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



Initial Performance Testsc N/A







Labor Rates
Repeat Performance Test N/A







Management $73.46
Report Review








Technical $54.51
Notification of Constructionc 2 1 2 0 0 0 0 $0.00
Clerical $29.50
Review of Initial Notification and Implementation Planc 2 1 2 0 0 0 0 $0.00


Review of Semiannual Notification of Compliance Status 2 2 4 56 224 11.2 22.4 $13,693.79


TOTAL (rounded) d
258 $13,700






Assumptions:


a Number of affected facilities per year is 56.


b This cost is based on the average hourly labor rate as follows: Managerial $73.46 (GS-13, Step 5, $45.91 + 60%); Technical $54.51 (GS-12, Step 1, $34.07 + 60%); and Clerical $29.50 (GS-6, Step 3, $18.44 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c We have assumed this is a one-time-only cost.


d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 6: Capital O&M

The only type of industry costs associated with the information collection activity in the regulations are labor costs. There are no capital/startup or operation and maintenance costs.

Sheet 7: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents a Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Semiannual Report/Notification 56 2 0 112



Total 112






Sheet 8: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)
1 0 56 0 0 56
2 0 56 0 0 56
3 0 56 0 0 56
Average 0 56 0 0 56
a New respondents include sources with constructed and reconstructed affected facilities.