Federal Register / Vol. 89, No. 111 / Friday, June 7, 2024 / Notices
l. With this notice, we are designating
the City as the Commission’s nonFederal representative for carrying out
informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. The City filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (http://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll free, (886) 208–3676 or TTY (202)
502–8659.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 1991–019.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by May 31, 2027.
p. Register online at http://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Dated: June 3, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–12548 Filed 6–6–24; 8:45 am]
BILLING CODE 6717–01–P

VerDate Sep<11>2014

19:36 Jun 06, 2024

Jkt 262001

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC24–20–000]

Commission Information Collection
Activities FERC–917 and FERC–918;
Consolidated Comment Request;
Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information
collections and request for comments.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collections,
FERC–917 (Electric Transmission
Facilities) and FERC–918 (Standards for
Business Practices and Communication
Protocols for Public Utilities), both
under OMB Control No. 1902–0233.
DATES: Comments on the collections of
information are due August 6, 2024.
ADDRESSES: You may submit copies of
your comments (identified by Docket
No. IC24–20–000 and the specific FERC
collection number (FERC–917 and/or
FERC–918) by one of the following
methods:
Electronic filing through http://
www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery:
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (including courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov. For user assistance,
contact FERC Online Support by email
at ferconlinesupport@ferc.gov, or by
phone at (866) 208–3676 (toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov.
FOR FURTHER INFORMATION CONTACT: Jean
Sonneman may be reached by email at
SUMMARY:

PO 00000

Frm 00060

Fmt 4703

Sfmt 4703

48609

DataClearance@FERC.gov, telephone at
(202) 502–6362.
SUPPLEMENTARY INFORMATION:
Title: FERC–917, Electric
Transmission Facilities and FERC–918,
Standards for Business Practices and
Communication Protocols for Public
Utilities.
OMB Control No.: 1902–0233.
Type of Request: Three-year extension
of the FERC–917 and FERC–918
information collection requirements
with no changes to the reporting
requirements.
Type of Respondents: Public utilities
transmission providers.
Abstract: The information collection
requirements in the FERC 917 and 918
include posting requirements in
compliance with Federal Power Act
sections 206. Furthermore, the
requirements for posting are described
in the Commission’s pro forma Open
Access Transmission Tariff (OATT) that
is prescribed by 18 CFR 35.28 to ensure
non-discriminatory practices in electric
energy systems and markets.
Additionally, the specifications to
posting information and standards that
must be followed are outlined in 18 CFR
part 37 (Open Access Same Time
Information System (OASIS)) and part
38 (Standards for Public Utility
Business Operations and
Communications) of the Commission’s
regulations.
The FERC 917 and 918 information
collections specifically contain the
burden related to gathering and posting
information (on OASIS) as specified in
the OATT 1 and the burden related to
complying with standards that are
described by the North American
Energy Standards Board (NAESB).2
This notice and information
collection request pertains to the
extension of the existing requirements
with no change to the reporting
requirements.3
Estimate of Annual Burden: 4 The
Commission estimates the annual public
reporting burden for the information
collection to remain consistent with the
1 The requirements for OASIS were established in
FERC order 888 and 889. Later, in FERC Order
1000–A, the FERC Information Collection under
OMB control no. 1902–0233 was created.
2 18 CFR part 38
3 There is a separate docket no. (RM21–17) that
is revising the OATT at this time. To reduce
confusion between the revision and the extension,
the Commission is issuing this notice for the
extension to requirements that are not being revised
in the separate rulemaking effort.
4 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, refer to 5 CFR part 1320.

E:\FR\FM\07JNN1.SGM

07JNN1

48610

Federal Register / Vol. 89, No. 111 / Friday, June 7, 2024 / Notices

previous estimate. However, the
Commission has updated the number of

respondents with a more current
estimate.

FERC–917 (ELECTRIC TRANSMISSION FACILITIES) AND FERC–918 (STANDARDS FOR BUSINESS PRACTICES AND
COMMUNICATION PROTOCOLS FOR PUBLIC UTILITIES)
Number of
respondents

I

Annual
number of
responses per
respondent

Annual
number of
responses

Average
annual
burden hours &
cost 5 per response
($)

Total average annual
burden hours &
total annual cost
($)

Average
annual cost
per
respondent
($)

(2)

I (1) * (2) = (3) I

(4)

(3) * (4) = (5)

(5) ÷ (1) = (6)

I

(1)

FERC–917 & FERC–918
Non-Discriminatory Open Access
Transmission Tariff (reporting).
Open Access Transmission Tariff
(record keeping).
Information to be posted on the
OASIS and Auditing Transmission
service (reporting).
Information to be posted on the
OASIS and Auditing Transmission
service (record keeping).
Total ..............................................

162

1

162

566 hrs.; $56,600 .............

91,692 hrs.; $9,169,200 ...

$56,600

162

1

162

10 hrs.; $1000 ..................

1,620 hrs.; $162,000 ........

1,000

162

1

162

376 hrs.; $37,600 .............

60,912 hrs.; $6,091,200 ...

37,600

162

1

162

45 hrs.; $4,500 .................

7,290 hrs.; $6,091,200 .....

4,500

........................

........................

........................

...........................................

161,514 hrs.; $16,151,400

........................

Comments: Comments are invited on:
(1) whether the collections of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collections
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information
collections; and (4) ways to minimize
the burden of the collections of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.

Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed May 24, 2024 10 a.m. EST
Through June 3, 2024 10 a.m. EST
Pursuant to 40 CFR 1506.9.

Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxapps.epa.gov/cdx-enepa-II/public/
action/eis/search.
EIS No. 20240093, Draft, FHWA, GA, I–
285 Top End Express Lanes, Comment
Period Ends: 07/29/2024, Contact:
Sabrina David 404–562–3630.
EIS No. 20240094, Final, FTA, WA,
Operations and Maintenance Facility
South Final Environmental Impact
Statement, Review Period Ends: 07/
08/2024, Contact: JUSTIN ZWEIFEL
206–257–2141.
EIS No. 20240095, Draft, USA, HI, Army
Training Land Retention of State
Lands at Kahuku Training Area,
Kawailoa-Poamoho Training Area,
and Makua Military Reservation
Island of O1ahu, Comment Period
Ends: 08/07/2024, Contact: Matthew
Foster 808–656–6821.
EIS No. 20240096, Final, USFS, CA,
Social and Ecological Resilience
Across the Landscape 2.0 (SERAL
2.0), Review Period Ends: 07/08/2024,
Contact: Benjamin Cossel 209–288–
6261.
EIS No. 20240097, Final, NPS, MT,
Yellowstone National Park Bison
Management Plan, Review Period
Ends: 07/08/2024, Contact: Morgan
Warthin 406–404–5096.
EIS No. 20240098, Draft, USACE, MS,
Pearl River Basin, Mississippi Federal
Flood Risk Management Project,

5 The Commission staff estimates that the average
respondent for this collection is similarly situated

to the Commission, in terms of salary plus benefits.
Based on FERC’s 2024 annual average of $207,786

Dated: June 3, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–12545 Filed 6–6–24; 8:45 am]
BILLING CODE 6717–01–P

ENVIRONMENTAL PROTECTION
AGENCY
[FRL OP–OFA–129]

Environmental Impact Statements;
Notice of Availability

ddrumheller on DSK120RN23PROD with NOTICES1

Notice

VerDate Sep<11>2014

17:23 Jun 06, 2024

Jkt 262001

PO 00000

Frm 00061

Fmt 4703

Sfmt 4703

Comment Period Ends: 07/22/2024,
Contact: Eric Williams 504–862–2862.
EIS No. 20240099, Draft, BLM, OR,
Lakeview Draft Resource Management
Plan and Draft Environmental Impact
Statement, Comment Period Ends: 09/
05/2024, Contact: Michael Collins
541–947–6012.
EIS No. 20240100, Final, BLM, ID, Lava
Ridge Wind Project Final
Environmental Impact Statement,
Review Period Ends: 07/08/2024,
Contact: Kasey Prestwich 208–732–
7204.
Dated: June 3, 2024.
Nancy Abrams,
Associate Director, Office of Federal
Activities.
[FR Doc. 2024–12535 Filed 6–6–24; 8:45 am]
BILLING CODE 6560–50–P

ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2024–0211; FRL–11998–01–
OCSPP]

Alpha-Pinene, Anisyl Alcohol, Butyl
Salicylate, Cineole (Eucalyptol), and
Phenylacetaldehyde; Receipt of
Application for Emergency Exemption,
Solicitation of Public Comment
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:

EPA has received a specific
exemption request from the Colorado
Department of Agriculture to use the
pesticides, alpha-pinene, anisyl alcohol,

SUMMARY:

(for salary plus benefits), the average hourly cost is
$100/hour.