Rail Carrier and Tank Car Tanks Requirements, Rail Tank Car Tanks - Transportation of Hazardous Materials by Rail

ICR 202003-2137-001

OMB: 2137-0559

Federal Form Document

Forms and Documents
Document
Name
Status
Justification for No Material/Nonsubstantive Change
2020-04-16
Supporting Statement A
2020-03-23
ICR Details
2137-0559 202003-2137-001
Historical Active 201807-2137-001
DOT/PHMSA 2137-0559
Rail Carrier and Tank Car Tanks Requirements, Rail Tank Car Tanks - Transportation of Hazardous Materials by Rail
No material or nonsubstantive change to a currently approved collection   No
Regular
Approved without change 07/01/2020
Retrieve Notice of Action (NOA) 04/22/2020
  Inventory as of this Action Requested Previously Approved
10/31/2021 10/31/2021 10/31/2021
21,761 0 17,685
4,985 0 2,834
0 0 0

This information collection is mandatory when the requirements are applicable. There are a number of entities that are required to respond to this information collection, all of which are connected to the transportation of hazardous materials by rail. These entities include shippers, rail operators, tank car owners, and tank car facilities. These requirements are reporting and are submitted either annually or as needed, depending on the requirements. PHMSA requests a wide range of information, including, but not limited to, requiring a shipper to notify the FRA when a tank containing a flammable cryogenic liquid has not been received within 20 days of shipment and requirements for tank car facilities to create and submit to the AAR a quality assurance program. The information in this burden is collected by PHMSA, FRA, AAR, as well as the required entities, varying based on the specific requirement. This information is used to ensure the safe transportation of hazardous materials by rail and is designed to ensure the tank cars transporting hazardous materials meet the required specifications.

US Code: 49 USC 5101-5127 Name of Law: HazMat Transportation Law
  
US Code: 49 USC 5107-5127 Name of Law: Hazardous Materials Regulations (49 CFR 171-180)

Not associated with rulemaking

  82 FR 18828 04/21/2017
82 FR 45356 09/28/2017
Yes

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 21,761 17,685 0 0 4,076 0
Annual Time Burden (Hours) 4,985 2,834 0 0 2,151 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
PHMSA and FRA identified that the number of one-time movement approvals (OTMAs) were out of date and not reflective of current estimates. These estimates were determined based on FRA data on the number of OTMA applications received. Therefore, PHMSA is adjusting these numbers to reflect the accurate number of OTMAs that FRA is approving each year.

$2,473,424
No
    No
    No
No
No
No
No
Steven Andrews 202 366-6199 steven.andrews@dot.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/22/2020


© 2024 OMB.report | Privacy Policy