OMB Control No:  1014-0028ICR Reference No: 
201908-1014-001 
Status:  ActivePrevious ICR Reference No:  201905-1014-009  
Agency/Subagency:  DOI/BSEEAgency Tracking No:  1014-0028 - Sub
G '20 
Title:  30 CFR Part 250, Subpart G,
Well Operations and Equipment. 
Type of Information Collection: 
Extension without change of a currently approved collectionCommon Form ICR:   No 
Type of Review Request:  Regular 
OIRA Conclusion Action:  Approved
with changeConclusion Date:  01/31/2020 
Retrieve
Notice of Action (NOA) Date Received in OIRA: 
11/27/2019 
Terms of Clearance:  In accordance
with 5 CFR 1320, the information collection is approved for three
years. 
  
Inventory as of this Action 
Requested 
Previously Approved 
 
Expiration Date 01/31/2023 
36 Months From Approved 
01/31/2020 
 
Responses 43,408 
0 
43,408 
 
Time Burden (Hours) 160,842 
0 
160,842 
 
Cost Burden (Dollars) 867,500 
0 
867,500 
 
 
Abstract:  The Bureau of Safety and Environmental
Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart
G--Well Operations and Equipment consolidate common equipment and
operational functions regarding Blowout Preventers (BOPs) to ensure
safe drilling, workover, completion, and decommissioning operations
and to protect the human, marine, and coastal environment. BSEE
analyzes and evaluates these information/requirements to reduce the
likelihood of a similar Deepwater Horizon event and to reduce the
risk of fatalities, injuries, and spills. 
 
Authorizing Statute(s):   US Code:
43
USC 1334  Name of Law: Outer Continental Shelf (OCS) Lands
Act31
USC 9701  Name of Law: Independent Offices Appropriations
Act30
USC 1751  Name of Law: Federal Oil and Gas Royalty Management
Act 
Citations for New Statutory
Requirements:  None 
 
Associated Rulemaking
Information  
RIN: Stage of Rulemaking: Federal Register Citation: Date:  
Not associated with rulemaking 
 
 
Federal Register Notices &
Comments  
60-day Notice: Federal Register Citation: Citation Date:  
  
84 FR
35418 07/23/2019 
 
30-day Notice: Federal Register Citation: Citation Date:  
84 FR
65418 11/27/2019 
 
Did the Agency receive public comments on
this ICR?  No 
 
Number of Information Collection (IC) in this
ICR:  74  
IC Title 
Form No. 
Form Name 
 
250.740; 741; 724(b) -
Retain data for 2 years after completion  
250.712(a), (b), (f) -
Updated Rig Movement Form  
250.737(e) - 72 hour
advance notice of location of shearing ram tests  
250.740; 741; 724(b) -
Drilling records  
250.742 - Well logging
operations  
250.742 - Directional
and vertical-well surveys  
250.742 - Velocity
profiles and surveys  
250.742 - Core
analyses  
250.745 - Varies
records of operations  
250.746 - Casing and
liner presser tests  
250.720(a)(3) -
Resuming Operations  
250.746(f) - Retain
pressure tests, actuations, and inspections in daily
report  
250.751 - BOP and
coiled tubing tests  
250.720(d) -
Intervention Operations  
250.721(d), (f), (g) -
plans to re-cement, repair, etc.  
250.721(g)(5) - Test
Results  
250.721(g)(6) - failed
negative pressure test  
250.722 - Successful
pressure test  
250.723(d) - Request
exceptions prior to moving rig  
250.734(a)(7) -
Acoustic control system  
250.734(a)(9); 738(n)
- Labeling  
250.737(a)(4) (d)(10)
- Quarterly reports  
250.737(d)(12) - Make
available upon request.  
250.738; 746(e) - DM
Approval - Put well in safe condition  
250.738; 746(e) - DM
Approval - Prior to resuming operations for
new/repaired/reconfigured BOP  
250.738; 746(e) - DM
Approval - Well control demands above rating pressure  
250.738; 746(e) - DM
Approval - 2 barriers in place prior to BOP removal  
250.738(i) - ITP
report - fit for service  
250.738(f) - BOP
configuration changes  
250.738(g) -
Demonstrate well-control procedures  
250.738(k) - Latching
up BOP stack/re-establishing power  
250.738(m) - ITP
report re-equipment design and suitability  
250.738(o) - ITP
report re failure of redundant control  
250.739 - meet/exceed
API Standard 53  
250.739(b) - ITP
report documenting inspection  
250.740; 711(b);
724(b); 738(c); 745; 746 - Daily report/records  
250.740; 711(b);
724(b); 738(c); 745; 746 - Required Info.  
250.715 - GPS for
MODUs - tracking/locator data  
250.710(a) - Safety
Meetings  
250.710(b); 738(p) -
Well-Control Drill Plan  
250.711(b), (c) -
Daily Drill Report  
250.712(c), (e) - Warm
or Cold Stacked  
250.712(d) -
Construction Repairs/Mods to MODU/Rig  
250.724 - Transmit RTM
data onshore  
250.730(a)(4) -
Schematic drawings  
250.732(d) -
Documentation that demonstrates compliance  
250.730(c)(2) -
Analysis report re equipment failure  
250.730(c)(3) - Submit
report re design change/modified procedures  
250.732(a) - Submit
ITP verification  
250.737(d)(5) -
Alternating testing schedule  
250.737(d)(12) -
Document all autoshear, EDS, and deadman test results  
250.737(a)(4) (d)(10)
- 21-day BOP testing frequency  
250.737(c); 746(a),
(b), (c), (d) - Record time, date, and results  
250.737(d)(2), (d)(3),
(d)(4) - Results w/in 72 hours after completion  
250.738; 746(e) - DM
Approval - problems, issues, leaks  
250.715 - GPS for
MODUs - Install  
250.713(a), (b) -
Fitness Requirements  
250.713(a), (b) -
Foundation Requirements  
250.714 - Dropped
Objects Plan  
250.724(c) - Develop
and implement a RTM plan  
250.730(c)(1) -
Written notice of equipment failure  
250.730(c)(2) -
Extension Request  
250.730(d)(1) -
Alternate approval from using to API Spec. Q1  
250.732(c) -
Verification that an ITP conducted detailed reviews  
250.737(d)(2), (d)(3),
(d)(4) - Notify DM 72 hours prior to testing  
250.738; 746(e) - DM
Approval  
250.722 - Evaluation
results report  
250.722(b)(3) -
Pressure test after repairs  
250.734(a)(7) -
Additional information / acoustic control system  
250.715 - GPS for
MODUs - Rent GPS  
250.715 - GPS for
MODUs - Monthly tracking fee  
250.720(a) -
Interrupting Operations  
250.712(a), (b), (f) -
Notify BSEE of Rig Movements  
250.712(a), (b), (f) -
Rig Movement Notification Report BSEE-0144 
Rig Movement Notification
Report   
 
 
 
ICR Summary of Burden 
  
Total Approved 
Previously Approved 
Change Due to New Statute 
Change Due to Agency Discretion 
Change Due to Adjustment in
Estimate 
Change Due to Potential Violation of
the PRA 
 
Annual Number of Responses 
43,408 
43,408 
0 
0 
0 
0 
 
Annual Time Burden (Hours) 
160,842 
160,842 
0 
0 
0 
0 
 
Annual Cost Burden (Dollars) 
867,500 
867,500 
0 
0 
0 
0 
 
Burden increases because of Program Change due to Agency
Discretion:  No 
Burden Increase Due to:  
Burden decreases because of Program Change due to Agency
Discretion:  No 
Burden Reduction Due to:  
Short Statement:  
Annual Cost to Federal Government: 
$10,374,352 
Does this IC contain surveys, censuses, or employ
statistical methods?  No 
Does this ICR request any personally identifiable
information (see OMB Circular No. A-130  for an
explanation of this term)? Please consult with your agency's
privacy program when making this determination. 
    No 
Does this ICR include a form that requires a Privacy Act
Statement (see 5
U.S.C. §552a(e)(3) )? Please consult with your agency's privacy
program when making this determination.     
No 
Is this ICR related to the Affordable Care Act [Pub. L.
111-148 & 111-152]?  No 
Is this ICR related to the Dodd-Frank Wall Street Reform
and Consumer Protection Act, [Pub. L. 111-203]?  No 
Is this ICR related to the American Recovery and
Reinvestment Act of 2009 (ARRA)?  No 
Is this ICR related to the Pandemic Response? 
Uncollected 
Agency Contact:  Nicole Mason 703 787-1605