30 CFR Part 250, Subpart G, Well Operations and Equipment.

ICR 201905-1014-009

OMB: 1014-0028

Federal Form Document

IC Document Collections
IC ID
Document
Title
Status
234340
Unchanged
234339
Unchanged
234338
Unchanged
234337
Unchanged
234336
Unchanged
234335
Unchanged
234334
Unchanged
234333
Unchanged
234332
Unchanged
234331
Unchanged
234330
Unchanged
234329
Unchanged
234328
Unchanged
234327
Unchanged
234326
Unchanged
234325
Unchanged
234324
Unchanged
234323
Unchanged
234322
Unchanged
234321
Unchanged
234320
Unchanged
234319
Unchanged
234318
Unchanged
234317
Unchanged
234316
Unchanged
234315
Unchanged
234314
Unchanged
234313
Unchanged
234312
Unchanged
234311
Unchanged
234310
Unchanged
234309
Unchanged
234308
Unchanged
234307
Unchanged
234306
Unchanged
234305
Unchanged
234304
Unchanged
234303
Unchanged
234302
Unchanged
234301
Unchanged
234300
Unchanged
234299
Unchanged
234298
Unchanged
234297
Unchanged
234296
Unchanged
234295
Unchanged
234294
Unchanged
234293
Unchanged
234292
Unchanged
234291
Unchanged
234290
Unchanged
234289
Unchanged
234288
Unchanged
234287
Unchanged
234286
Unchanged
234285
Unchanged
234284
Unchanged
234283
Unchanged
234282
Unchanged
234281
Unchanged
234280
Unchanged
234279
Unchanged
234278
Unchanged
234277
Unchanged
234276
Unchanged
234275
Unchanged
234274
Unchanged
234273
Unchanged
234272
Unchanged
234271 Unchanged
234270
Unchanged
234269
Unchanged
234268
Unchanged
234267
Unchanged
211646 Removed
211645 Removed
205448
Removed
205447
Removed
205443
Removed
205442 Removed
205437 Removed
205436
Removed
ICR Details
1014-0028 201905-1014-009
Historical Active 201811-1014-001
DOI/BSEE 1014-0028 - Sub G - WCR
30 CFR Part 250, Subpart G, Well Operations and Equipment.
Revision of a currently approved collection   No
Regular
Approved without change 07/19/2019
Retrieve Notice of Action (NOA) 05/03/2019
In accordance with 5 CFR 1320, the information collection is approved. However, since the agency sought comment on the changes associated with the regulation and not the entire collection, the expiration date for the collection will not be extended.
  Inventory as of this Action Requested Previously Approved
07/31/2019 36 Months From Approved 07/31/2019
43,408 0 8,143
160,842 0 87,628
867,500 0 0

The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.

US Code: 43 USC 1334 Name of Law: Outer Continental Shelf (OCS) Lands Act
   US Code: 31 USC 9701 Name of Law: Independent Offices Appropriations Act
   US Code: 30 USC 1751 Name of Law: Federal Oil and Gas Royalty Management Act
  
None

1014-AA39 Final or interim final rulemaking 84 FR 21908 05/15/2019

  83 FR 22128 05/11/2018
84 FR 21908 05/15/2019
No

74
IC Title Form No. Form Name
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
250.738; 746(e) - DM Approval - Well control demands above rating pressure
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
250.738(i) - ITP report - fit for service
250.738(f) - BOP configuration changes
250.738(g) - Demonstrate well-control procedures
250.739 - meet/exceed API Standard 53
250.738(k) - Latching up BOP stack/re-establishing power
250.738(m) - ITP report re-equipment design and suitability
250.738(o) - ITP report re failure of redundant control
250.739(b) - ITP report documenting inspection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
Subpart G - BOP System Requirements - 250.730-739;746a,b,c,d,e
250.715 - GPS for MODUs - tracking/locator data
Subpart G - Records and Reporting Requirements - 250.711(b);738(c);740-746
250.711(b), (c) - Daily Drill Report
Application for Permit to Modify (APM/revised APM) - 250.460;465;518(f);619(f);701-738;1704(g) BSEE-0124 Application for Permit to Modify (APM)
Applications for Permit to Drill (APD/revised APD) - 250.410-418;420(a)(7);423(c)(1);428(b),(k);701-738 BSEE-0123, BSEE-0123S Application for Permit to Drill (APD) ,   Supplemental APD Information Sheet
250.710(a) - Safety Meetings
250.710(b); 738(p) - Well-Control Drill Plan
250.730(a)(4) - Schematic drawings
250.712(c), (e) - Warm or Cold Stacked
250.712(d) - Construction Repairs/Mods to MODU/Rig
250.724 - Transmit RTM data onshore
250.730(c)(2) - Analysis report re equipment failure
250.730(c)(3) - Submit report re design change/modified procedures
250.732(a) - Submit ITP verification
250.732(d) - Documentation that demonstrates compliance
250.737(d)(5) - Alternating testing schedule
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
250.738; 746(e) - DM Approval - problems, issues, leaks
250.715 - GPS for MODUs - Install
Subpart B - 250.287; 291; 292
Subpart D - 250.420(b);421(b);423(c);428(c),(d),(k);462(c),(d),(e);465(a),(b);721(g);743(a),(b),(c);744;746(e);1704(h) BSEE-0133, BSEE-0133S, BSEE-0125 End of Operations Report ,   Well Activity Report (WAR) ,   Open Hole Data Report (Supplement to the WAR)
Subpart G - Rig Requirements - 250.710 - 715; 738(p) BSEE-0144 Rig Movement Notification Report
Subpart G - Well Operations - 250.720 - 724; 744(a)
250.713(a), (b) - Fitness Requirements
250.713(a), (b) - Foundation Requirements
250.714 - Dropped Objects Plan
250.724(c) - Develop and implement a RTM plan
250.730(c)(1) - Written notice of equipment failure
250.730(c)(2) - Extension Request
250.730(d)(1) - Alternate approval from using to API Spec. Q1
250.732(c) - Verification that an ITP conducted detailed reviews
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
250.738; 746(e) - DM Approval
250.722 - Evaluation results report
250.722(b)(3) - Pressure test after repairs
250.734(a)(7) - Additional information / acoustic control system
250.715 - GPS for MODUs - Rent GPS
250.715 - GPS for MODUs - Monthly tracking fee
250.720(a) - Interrupting Operations
250.712(a), (b), (f) - Notify BSEE of Rig Movements
250.712(a), (b), (f) - Rig Movement Notification Report BSEE-0144 Rig Movement Notification Report
250.712(a), (b), (f) - Updated Rig Movement Form
250.737(e) - 72 hour advance notice of location of shearing ram tests
250.740; 741; 724(b) - Drilling records
250.740; 741; 724(b) - Retain data for 2 years after completion
250.742 - Well logging operations
250.742 - Directional and vertical-well surveys
250.742 - Velocity profiles and surveys
250.742 - Core analyses
250.745 - Varies records of operations
250.746 - Casing and liner presser tests
250.720(a)(3) - Resuming Operations
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
250.751 - BOP and coiled tubing tests
250.720(d) - Intervention Operations
250.721(d), (f), (g) - plans to re-cement, repair, etc.
250.721(g)(5) - Test Results
250.721(g)(6) - failed negative pressure test
250.722 - Successful pressure test
250.723(d) - Request exceptions prior to moving rig
250.734(a)(7) - Acoustic control system
250.734(a)(9); 738(n) - Labeling
250.737(a)(4) (d)(10) - Quarterly reports
250.737(d)(12) - Make available upon request.
250.738; 746(e) - DM Approval - Put well in safe condition

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 43,408 8,143 0 2,005 33,260 0
Annual Time Burden (Hours) 160,842 87,628 0 4,048 69,166 0
Annual Cost Burden (Dollars) 867,500 0 0 765,000 102,500 0
Yes
Changing Regulations
No
(a) The current OMB inventory for this collection is 87,628 burden hours. In this submission, we are requesting a total of 160,842 burden hours. This represents an adjustment increase of 69,166 burden hours. The adjustment increase is due to relocating hour burdens from multiple separate subparts (ICRs) throughout 30 CFR 250 created from the original BOP rule (1014-AA11). This also represents a program increase of 4,048 burden hours due to this final rulemaking, 1014-AA39, Blowout Preventer Systems and Well Control Revisions. (b) The OMB non-hour cost burden is an adjustment increase of $102,500 and also comes from multiple subparts throughout 30 CFR 250 that were approved in other ICRs. In this submission, we are requesting a total of $867,500. This represents a program increase of $765,000 for Independent Third Party costs being added due to this final rulemaking, 1014-AA39, Blowout Preventer Systems and Well Control Revisions.

$10,133,088
No
    No
    No
No
No
No
Uncollected
Nicole Mason 703 787-1605 nicole.mason@boemre.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
05/03/2019


© 2024 OMB.report | Privacy Policy