NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and CCCCCC) (Renewal)

ICR 201812-2060-003

OMB: 2060-0620

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2018-12-11
Supporting Statement A
2018-12-11
ICR Details
2060-0620 201812-2060-003
Active 201502-2060-011
EPA/OAR 2237.05
NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and CCCCCC) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/08/2019
Retrieve Notice of Action (NOA) 12/21/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
03/31/2022 36 Months From Approved 03/31/2019
6,900 0 6,900
214,000 0 175,308
110,000 0 110,000

The NESHAP for Source Categories: Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities, and Gasoline Dispensing Facilities applies to owners or operators of any existing or new gasoline distribution facilities that are an area source of hazardous air pollutants (HAP) emissions. In addition to the initial notification and notification of compliance status required by the General Provisions (40 CFR Part 63, Subpart A), respondents are required to submit one-time reports of start of construction, anticipated and actual startup dates, and physical or operational changes to existing facilities. Reports of initial performance tests on control devices at gasoline distribution storage tanks, loading racks, and vapor balance systems are also required and are necessary to show that the installed control devices are meeting the emission limitations required by the NESHAP. Annual reports of storage tank inspections at all affected facilities are required. In addition, respondents must submit semiannual compliance and continuous monitoring system performance reports, and semiannual reports of equipment leaks not repaired within 15 days or loadings of cargo tanks for which vapor tightness documentation is not available.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
83 FR 65667 12/21/2018
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 6,900 6,900 0 0 0 0
Annual Time Burden (Hours) 214,000 175,308 0 0 38,692 0
Annual Cost Burden (Dollars) 110,000 110,000 0 0 0 0
No
No
The increase in the estimated respondent labor hours from the most- recently approved ICR is due to an adjustment. This ICR reflects addition of burden hours to account for the time spent by existing facilities to re-familiarize themselves annually with the rule requirements.

$1,120,000
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/21/2018


© 2024 OMB.report | Privacy Policy