NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and CCCCCC) (Final Rule)
NESHAP for Gasoline
Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and
Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and
CCCCCC) (Final Rule)
Revision of a currently approved collection
No
Regular
09/30/2025
Requested
Previously Approved
36 Months From Approved
09/30/2025
10,061
6,900
297,882
214,000
110,000
110,000
The NESHAP for Source Categories:
Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline
Facilities, and Gasoline Dispensing Facilities applies to owners or
operators of any existing or new gasoline distribution facilities
that are an area source of hazardous air pollutants (HAP)
emissions. In addition to the initial notification and notification
of compliance status required by the General Provisions (40 CFR
Part 63, Subpart A), respondents are required to submit one-time
reports of start of construction, anticipated and actual startup
dates, and physical or operational changes to existing facilities.
Reports of initial performance tests on control devices at gasoline
distribution storage tanks, loading racks, and vapor balance
systems are also required and are necessary to show that the
installed control devices are meeting the emission limitations
required by the NESHAP. Annual reports of storage tank inspections
at all affected facilities are required. In addition, respondents
must submit semiannual compliance and continuous monitoring system
performance reports, and semiannual reports of equipment leaks not
repaired within 15 days or loadings of cargo tanks for which vapor
tightness documentation is not available.
This ICR is prepared for final
amendments to the NESHAP for Gasoline Distribution Area Sources (40
CFR Part 63, Subpart BBBBBB). These final amendments: adjust
references to the Part 63 General Provisions (40 CFR, Part 63,
Subpart A); add electronic submittal of notifications, semiannual
reports, and performance test and performance evaluation reports;
and make technical and editorial changes including the following:
lowering the emission limit for loading at large bulk gasoline
terminals, revising testing and monitoring requirements for
gasoline loading vapor processing systems, requiring vapor
balancing at bulk gasoline plants, increasing vapor tightness
standards for cargo tanks, requiring fitting controls for external
floating roof tanks, including lower explosive limit (LEL)
monitoring for internal floating roof tanks, performing annual
instrument monitoring for equipment leaks, and updating
definitions. This ICR reflects only the additional burden
associated with the final rule revisions. Additional burden was
added to review the amendments, review new electronic reporting
forms, adjust recordkeeping processes to ensure data needed to
complete the reporting forms are collected in the proper format,
and to monitor equipment according to the final amendments. Burden
estimates were also revised to account for additions and changes to
the semiannual reporting requirements.
$362,782
No
No
No
No
No
No
No
Muntasir Ali 919
541-0833
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.