2060-0016 201811-2060-014
Active 201501-2060-004
EPA/OAR 0982.12
NSPS for Metallic Mineral Processing Plants (40 CFR part 60, subpart LL) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/08/2019
Retrieve Notice of Action (NOA) 12/11/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
03/31/2022 36 Months From Approved 03/31/2019
45 0 45
2,330 0 2,306
13,000 0 13,000

The New Source Performance Standards (NSPS) for Metallic Mineral Processing Plants (40 CFR Part 60, Subpart LL) apply to the following facilities at metallic mineral processing plants: each crusher and screen at open-pit mines and each crusher, screen, bucket elevator, conveyor belt transfer point, thermal dryer, product packaging station, storage bin, enclosed storage area, and truck loading and unloading station at mills or concentrators commencing construction, modification or reconstruction after the date of proposal. The NSPS does not apply to facilities located in underground mines or uranium ore beneficiation processing plants. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart LL.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
83 FR 63636 12/11/2018
No

1
IC Title Form No. Form Name
NSPS for Metallic Mineral Processing Plants (40 CFR part 60, subpart LL) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 45 45 0 0 0 0
Annual Time Burden (Hours) 2,330 2,306 0 0 24 0
Annual Cost Burden (Dollars) 13,000 13,000 0 0 0 0
No
No
There is an adjustment increase of 24 labor hours due to a change in assumption. This ICR assumes all existing sources will spend time each year to re-familiarize with the regulations. There are no other changes in burden in this ICR compared to the previous ICR. This is due to two considerations: 1) the regulations have not changed over the past three years, and are not anticipated to change over the next three years; and 2) the growth rate for the industry is very low, negative or non-existent, so there is no significant change in the overall burden.

$10,800
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/11/2018


© 2024 OMB.report | Privacy Policy