In accordance
with 5 CFR 1320, the information collection is approved for three
years.
Inventory as of this Action
Requested
Previously Approved
12/31/2018
36 Months From Approved
11/30/2015
45
0
44
2,306
0
2,306
13,000
0
13,000
This NSPS affects owners and operators
of metallic mineral processing plants. Owners and operators must
conduct initial performance tests, maintain records of startups,
shutdowns, and malfunction and continuous monitoring system
parameters, and submit semi-annual reports. The required semiannual
reports are used to determine periods of excess emissions, identify
problems at the facility, verify operation/maintenance procedures,
and for compliance determinations. This information is collected to
assure compliance with 40 CFR Part 60, Subpart LL.
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.