FERC-725Y (Final Rule in RM16-22-000) Mandatory Reliability Standards: Personnel Performance, Training, and Qualification

ICR 201806-1902-007

OMB: 1902-0279

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2018-06-25
Supplementary Document
2018-06-21
Supplementary Document
2018-06-21
Supplementary Document
2018-06-21
Supplementary Document
2018-06-21
Supplementary Document
2018-06-21
Supplementary Document
2018-06-21
IC Document Collections
ICR Details
1902-0279 201806-1902-007
Active 201711-1902-001
FERC FERC-725Y
FERC-725Y (Final Rule in RM16-22-000) Mandatory Reliability Standards: Personnel Performance, Training, and Qualification
Revision of a currently approved collection   No
Regular
Approved without change 08/10/2018
Retrieve Notice of Action (NOA) 06/25/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
08/31/2021 36 Months From Approved 05/31/2021
3,403 0 2,459
34,494 0 20,334
0 0 0

The Final Rule in RM16-22-000 approves the PER-006-1 Reliability Standard. The purpose of PER-006-1 is to ensure that personnel are trained on specific topics essential to reliability to perform or support Real-time operations of the Bulk Electric System. FERC-725Y, in general. The information collection (data reported and retained) as required by Reliability Standard PER-005-2 is not submitted to FERC; rather it is retained for access by NERC, the Regional Entity, or FERC in their respective roles of monitoring and enforcing compliance with the NERC Reliability Standards. [Reliability Standard PER-005 includes training requirements for local transmission control center operator personnel, operations support personnel who perform current day or next day outage coordination or assessments, or who determine SOLs or IROLs or operating nomograms in support of real-time operations; and certain generator dispatch personnel at centrally located dispatch centers.]

US Code: 16 USC 824o Name of Law: Federal Power Act (FPA)
  
None

1902-AF45 Final or interim final rulemaking 83 FR 27505 06/13/2018

No

2
IC Title Form No. Form Name
PER-005-2 Reliability Standard
PER-006-1 Reliability Standard (RM16-22-000)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 3,403 2,459 0 944 0 0
Annual Time Burden (Hours) 34,494 20,334 0 14,160 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Miscellaneous Actions
No
The purpose of Reliability Standard PER-006-1 (under FERC-725Y) is to ensure that personnel are trained on specific topics essential to reliability to perform or support real-time operations of the bulk electric system. The Commission also approves the associated violation risk factors, violation severity levels, implementation plans, and effective dates by NERC for Reliability Standards PRC-027-1 and PER-006-1.

$5,723
No
    No
    No
No
No
No
Uncollected
Syed Ahmad 202 502-8718

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/25/2018


© 2024 OMB.report | Privacy Policy