NSPS for Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or before August 30, 1999 (40 CFR part 60, subpart BBBB) (Renewal)
ICR 201601-2060-003
OMB: 2060-0424
Federal Form Document
⚠️ Notice: This information collection may be outdated. More recent filings for OMB 2060-0424 can be found here:
NSPS for Emission Guidelines
and Compliance Times for Small Municipal Waste Combustion Units
Constructed on or before August 30, 1999 (40 CFR part 60, subpart
BBBB) (Renewal)
Extension without change of a currently approved collection
These emission guidelines apply to
small municipal waste combustors (MWCs) constructed on or before
August 30, 1999, that combust greater than 35 tons per day (tpd)
but less than 250 tpd of municipal solid waste. The emission
guidelines regulate organics (dioxin/furans), metals (cadmium,
lead, mercury, and particulate matter), and acid gases (hydrogen
chloride, sulfur dioxide, and nitrogen oxides). The emission
guidelines require initial reports, semiannual reports, and annual
reports. Owners or operators also are required to maintain records
of the occurrence and duration of any startup, shutdown, or
malfunction in the operation of an affected facility or any period
during which the monitoring system is inoperative. Owners or
operators subject to these regulations are required to maintain
records of measurements and reports for at least five
years.
There is an adjustment increase
in the respondent burden from the most recently approved ICR. The
increase in respondent labor hour is caused by a change in
assumption; in this ICR, we assume all existing sources will take
some time each year to re-familiarize themselves with the rule
requirements. There is also a small increase in the total O&M
cost due to rounding of all calculated values to three significant
digits.
$125,000
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.