The affected entities are subject to
the General Provisions of the NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the Provisions specified at 40 CFR
part 63, subpart RRRR. Owners or operators of the affected
facilities must submit a one-time-only of any physical or
operational changes, initial performance tests, and periodic
reports and results. Owners or operators are also required to
maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports are also required semiannually.
There is a small decrease in
the respondent labor hours and an increase in the O&M cost from
the previous ICR due to rounding. In this ICR, we have rounded
total values to three significant digits. There is a decrease in
the total estimated labor costs due to a correction. The previous
ICR incorrectly referenced managerial labor rates when calculating
technical labor cost, and vice versa, thereby overestimating total
labor costs.
$976,000
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.