Respondents operating under these
regulations conduct commercial and noncommercial technology
projects that include installation, construction, operation and
maintenance, and decommissioning of offshore facilities, as well as
possible onshore support facilities. The BOEM must ensure that
these activities and operations on the OCS are carried out in a
safe and environmentally sound manner, do not interfere with the
rights of other users on the OCS, and balance the protection and
development of OCS resources. To do this, BOEM needs information
concerning the proposed activities, facilities, safety equipment,
inspections and tests, and natural and manmade hazards near the
site, as well as assurance of fiscal responsibility.
The currently approved hour
burden for this ICR is 30,902 hours. With this submission, we are
requesting a total of 25,688 hours. This represents an adjustment
decrease of 5,214 hours due to the number of responses over the
past three years being reduced since the last renewal. There is no
change in the non-hour cost burden.
$2,003,644
No
No
No
No
No
Uncollected
Nicole Mason 703 787-1605
nicole.mason@boemre.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.