Download:
pdf |
pdfrmajette on DSK2TPTVN1PROD with NOTICES
53176
Federal Register / Vol. 79, No. 173 / Monday, September 8, 2014 / Notices
Federal Officer, via electronic mail, the
preferred mode of submission, at the
address listed in the FOR FURTHER
INFORMATION CONTACT section. Each page
of the comment or statement must
include the author’s name, title or
affiliation, address, and daytime phone
number. The Designated Federal Official
will review all submitted written
comments or statements and provide
them to members of the committee for
their consideration. Written comments
or statements being submitted in
response to the agenda set forth in this
notice must be received by the
Designated Federal Official at least
seven business days prior to the meeting
to be considered by the committee.
Written comments or statements
received after this date may not be
provided to the committee until its next
meeting.
Pursuant to 41 CFR 102–3.140d, the
Committee is not obligated to allow a
member of the public to speak or
otherwise address the Committee during
the meeting. Members of the public will
be permitted to make verbal comments
during the Committee meeting only at
the time and in the manner described
below. If a member of the public is
interested in making a verbal comment
at the open meeting, that individual
must submit a request, with a brief
statement of the subject matter to be
addressed by the comment, at least
seven business days in advance to the
committee’s Designated Federal Official,
via electronic mail, the preferred mode
of submission, at the address listed in
the FOR FURTHER INFORMATION CONTACT
section. The Designated Federal Official
will log each request, in the order
received, and in consultation with the
committee Chair, determine whether the
subject matter of each comment is
relevant to the committee’s mission
and/or the topics to be addressed in this
public meeting. A 15-minute period
near the end of the meeting will be
available for verbal public comments.
Members of the public who have
requested to make a verbal comment
and whose comments have been
deemed relevant under the process
described above, will be allotted no
more than three minutes during the
period, and will be invited to speak in
the order in which their requests were
received by Designated Federal Official.
DEFENSE NUCLEAR FACILITIES
SAFETY BOARD
Brenda S. Bowen,
Army Federal Register Liaison Officer.
Dated: September 3, 2014.
Jessie H. Roberson,
Chair, Executive Resources Board.
[FR Doc. 2014–21314 Filed 9–5–14; 8:45 am]
BILLING CODE 3710–08–P
VerDate Mar<15>2010
15:14 Sep 05, 2014
Senior Executive Service Performance
Review Board
Defense Nuclear Facilities
Safety Board.
ACTION: Notice.
AGENCY:
This notice announces the
membership of the Defense Nuclear
Facilities Safety Board (DNFSB) Senior
Executive Service (SES) Performance
Review Board (PRB).
DATES: Effective Date: September 8,
2014.
ADDRESSES: Send comments concerning
this notice to: Defense Nuclear Facilities
Safety Board, 625 Indiana Avenue NW.,
Suite 700, Washington, DC 20004–2001.
FOR FURTHER INFORMATION CONTACT:
Deborah Biscieglia by telephone at (202)
694–7041 or by email at debbieb@
dnfsb.gov.
SUPPLEMENTARY INFORMATION: 5 U.S.C.
4314(c)(1) through (5) requires each
agency to establish, in accordance with
regulations prescribed by the Office of
Personnel Management, one or more
performance review boards. The PRB
shall review and evaluate the initial
summary rating of a senior executive’s
performance, the executive’s response,
and the higher level official’s comments
on the initial summary rating. In
addition, the PRB will review and
recommend executive performance
bonuses and pay increases.
The DNFSB is a small, independent
Federal agency; therefore, the members
of the DNFSB SES PRB in this notice are
drawn from the SES ranks of other
agencies. The following persons
comprise a standing roster to serve as
members of the DNFSB SES PRB:
Christopher E. Aiello, Special Advisor
to the Deputy to the Chairman and
CFO, Federal Deposit Insurance
Corporation
David M. Capozzi, Executive Director,
United States Access Board
Cedric R. Hendricks, Associate Director
for the Office of Legislative,
Intergovernmental and Public Affairs,
Court Services and Offender
Supervision Agency
Barry S. Socks, Chief Operating Officer,
National Capital Planning
Commission
Dr. Michael L. Van Woert, Director of
the National Science Board Office,
National Science Foundation
SUMMARY:
[FR Doc. 2014–21273 Filed 9–5–14; 8:45 am]
BILLING CODE 3670–01–P
Jkt 232001
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RD14–7–000]
Commission Information Collection
Activities (Ferc-725y); Comment
Request
Federal Energy Regulatory
Commission.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting the information
collection FERC–725Y, Mandatory
Reliability Standard PER–005–2
(Operations Personnel Training), to the
Office of Management and Budget
(OMB) for review of the information
collection requirements. Any interested
person may file comments directly with
OMB and should address a copy of
those comments to the Commission as
explained below. The Commission
solicited comments on the information
collection associated with PER–005–2 in
an order published in the Federal
Register (79 FR 36305, 6/26/2014).
FERC received no comments on the
information collection and is making
this notation in its submission to OMB.
DATES: Comments on the collection of
information are due by October 8, 2014.
ADDRESSES: Comments filed with OMB,
identified by collection FERC–725Y,
should be sent via email to the Office of
Information and Regulatory Affairs:
oira_submission@omb.gov, Attention:
Federal Energy Regulatory Commission
Desk Officer. The Desk Officer may also
be reached via telephone at 202–395–
4718.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. RD14–7–000, by either of the
following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
SUMMARY:
E:\FR\FM\08SEN1.SGM
08SEN1
Federal Register / Vol. 79, No. 173 / Monday, September 8, 2014 / Notices
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION: Ellen Brown
may be reached by email at
DataClearance@FERC.gov, by telephone
at (202) 502–8663, and by fax at (202)
273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–725Y,1 Mandatory
Reliability Standard PER–005–2
(Operations Personnel Training).
OMB Control No.: To Be Determined.
Type of Request: Three-year approval
of the FERC–725Y information
collection requirements.
Abstract: Reliability Standard PER–
005–2 (Operations Personnel Training
Standard) implements the Congressional
mandate of the Energy Policy Act of
2005 to develop mandatory and
enforceable Reliability Standards to
better ensure the reliability of the
nation’s Bulk-Power System.
Specifically, the purpose of PER–005–
2 2 is to ensure that personnel
performing or supporting real-time
operations on the Bulk Electric System
(BES) are trained using a systematic
approach. The Reliability Standard
requires entities to maintain records
subject to review by the Commission
and NERC to ensure compliance with
the Reliability Standard.
PER–005–2 contains six
Requirements:
• R1 requiring reliability
coordinators, balancing authorities, and
transmission operators to develop and
implement a training program for
system operators
• R2 requiring transmission owners to
develop and implement a training
program for system operators
• R3 requiring reliability
coordinators, balancing authorities,
transmission operators and transmission
owners to verify the capabilities of their
identified personnel
• R4 requiring reliability
coordinators, balancing authorities,
transmission operators and transmission
owners to provide those personnel with
emergency operations training using
simulation technology
• R5 requiring reliability
coordinators, balancing authorities, and
transmission operators to develop and
implement training for their operations
support personnel
53177
• R6 requiring applicable generator
operators to develop and implement
training for certain of their dispatch
personnel at a centrally located dispatch
center.
Type of Respondents: Reliability
coordinators, balancing authorities,
transmission operators, transmission
owners, and generator owners.
Estimate of Annual Burden 3: Our
estimate below regarding the number of
respondents is based on the NERC
compliance registry as of April 30, 2014.
According to the NERC compliance
registry, NERC has registered 15
reliability coordinators, 107 balancing
authorities, 182 transmission operators,
337 transmission owners and 848
generator operators. However, under
NERC’s compliance registration
program, entities may be registered for
multiple functions, so these numbers
incorporate some double counting. The
number of unique entities responding
will be approximately 387 entities
registered as a reliability coordinator,
balancing authority, transmission
operator, transmission owner, or
generator operator.
The Commission estimates the
additional annual reporting burden and
cost as follows:
FERC–725Y, AS IMPLEMENTED IN DOCKET NO. RD14–7
rmajette on DSK2TPTVN1PROD with NOTICES
(One-time) Development of a training
program and materials, and task
list [R2].
(One-time) Development of a training
program [R5].
(One-time) Development of a training
program [R6].
(Ongoing) Annual
Evaluation and update of training
program and task
list [R2 and R6].
Number and type of
respondents 4
Annual
number of
responses per
respondent
(1)
(2)
Average burden and
cost per response 5
Total annual burden
hours and total
annual cost
(3)
(1) × (2) × (3)
Cost per
respondent
TO (337) 6 ..................
1
337
15 hrs. and $59.62/
hour.
5,055 hours and
$301,379.10.
$894.30
RC, BA, TOP (216) ...
1
216
15 hrs. and $59.62/
hour.
3,240 hours and
$193,168.80.
894.30
GOP (848) .................
1
848
15 hrs. and $59.62/
hour.
12,720 hours and
$758,366.40.
894.30
TO (337), GOP (848)
1
7 1,050
6 hrs. and $59.62/
hour.
6,300 hours and
$375,606.
357.72
1 In the Order issued 6/19/2014, the proposed
information collection was included in FERC–725A
(Mandatory Reliability Standards for the BulkPower System) under OMB Control No. 1902–0244.
In this notice and the related Paperwork Reduction
Act package to be submitted to the Office of
Management and Budget for review and approval,
the information collection will be included in a
new FERC–725Y (rather than FERC–725A).
2 Reliability Standard PER–005–2 expands the
scope of the current Reliability Standard in order
to address the Commission’s directives in Order
Nos. 693 and 742.
3 Burden is defined as the total time, effort, or
financial resources expended by persons to
VerDate Mar<15>2010
Total number
of responses
15:14 Sep 05, 2014
Jkt 232001
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
4 TO=Transmission Owner; RC=Reliability
Coordinator; BA=Balancing Authority;
TOP=Transmission Operator; GOP=Generator
Operator.
5 The estimated hourly costs (salary plus benefits)
are based on Bureau of Labor and Statistics (BLS)
information (available at http://bls.gov/oes/current/
naics3_221000.htm#17-0000) for an electrical
engineer ($59.62/hour for review and
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
documentation), and for a file clerk ($28.95/hour for
record retention).
6 Not all transmission owners are expected to
have personnel who will be subject to the revised
personnel training requirements, but this estimate
conservatively includes all registered TOs. The
same approach is taken with respect to generator
operators.
7 Some transmission owners are also generator
operators. To eliminate double counting some
entities, this figure reflects the number of unique
entities (1,050) within the group of TOs and GOPs.
That approach is used throughout the table.
E:\FR\FM\08SEN1.SGM
08SEN1
53178
Federal Register / Vol. 79, No. 173 / Monday, September 8, 2014 / Notices
FERC–725Y, AS IMPLEMENTED IN DOCKET NO. RD14–7—Continued
(Ongoing) Retention
of records [M2,
M6, and C.1.3].
(Ongoing)
Verification and retention of evidence
of capabilities of
personnel [R3, M3,
C1.3], and creation
and retention of
records on simulation training [R4
and M4].
Number and type of
respondents 4
Annual
number of
responses per
respondent
(1)
(2)
Total annual burden
hours and total
annual cost
(3)
(1) × (2) × (3)
Cost per
respondent
1
1,050
10 hrs. and $28.95/
hour.
10,500 hrs. and
$303,975.
289.50
TO (337) ....................
1
337
10 hrs. and $28.95/
hour.
3,370 hrs. and
$97,561.50.
289.50
Dated: August 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21207 Filed 9–5–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–539–000]
Ozark Gas Transmission, LLC; Notice
of Application
rmajette on DSK2TPTVN1PROD with NOTICES
Average burden and
cost per response 5
TO (337), GOP (848)
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Take notice that on August 22, 2014,
Ozark Gas Transmission, LLC (Ozark),
5400 Westheimer Court, Houston, Texas
77056, filed an application in Docket
No. CP14–539–000 pursuant to Section
7(b) of the Natural Gas Act (NGA), and
Part 157 of the Commission’s
regulations, for a certificate of public
convenience and necessity for its Ozark
Abandonment Project. Ozark seeks
authorization to abandon by intercorporate transfer to an affiliate
approximately 158.7 miles of pipeline,
VerDate Mar<15>2010
Total number
of responses
15:14 Sep 05, 2014
Jkt 232001
located in Sebastian and White
Counties, Arkansas, that will be
repurposed to refined petroleum
products transportation service. In
addition, Ozark will disconnect and
abandon 29 associated metering and
regulating facilities and other
appurtenant facilities that will not be
converted to refined petroleum products
transportation service. In addition to the
work required to perform the
abandonment activities, Ozark will
perform work to re-pipe the existing
Noark Compressor Station to Ozark’s 16inch Line 2 pursuant to Section 2.55(a)
of the Commission’s regulations, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection. The
filing may also be viewed on the web at
http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
applications should be directed to Lisa
A. Connolly, General Manager, Rates
and Certificates, Ozark Gas
Transmission, LLC, P.O. Box 1642,
Houston, Texas 77251, or by calling
(713) 627–4102 (telephone) or (713)
627–5947 (fax) laconnolly@
spectraenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
E:\FR\FM\08SEN1.SGM
08SEN1
File Type | application/pdf |
File Modified | 2014-09-06 |
File Created | 2014-09-06 |