NSPS for Small Industrial-Commercial-Institutional Steam Generating Units (40 CFR part 60, subpart Dc) (Renewal)

ICR 201312-2060-007

OMB: 2060-0202

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2013-12-03
ICR Details
2060-0202 201312-2060-007
Historical Active 201012-2060-005
EPA/OAR 1564.09
NSPS for Small Industrial-Commercial-Institutional Steam Generating Units (40 CFR part 60, subpart Dc) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved with change 12/30/2014
Retrieve Notice of Action (NOA) 12/11/2013
  Inventory as of this Action Requested Previously Approved
12/31/2017 36 Months From Approved 12/31/2014
611 0 546
181,964 0 159,972
10,758,723 0 9,446,145

The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 60, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 60, subpart Dc. Owners or operators of the affected facilities must submit a one-time-only report of any physical or operational changes, initial performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.

None
None

Not associated with rulemaking

  78 FR 33409 06/04/2013
78 FR 75342 12/11/2013
No

1
IC Title Form No. Form Name
NSPS for Small Industrial-Commercial-Institutional Steam Generating Units (40 CFR Par 60, Subpart DC)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 611 546 0 0 65 0
Annual Time Burden (Hours) 181,964 159,972 0 0 21,992 0
Annual Cost Burden (Dollars) 10,758,723 9,446,145 0 0 1,312,578 0
No
No
There is an adjustment increase in the respondent and Agency burden from the most recently approved ICR due to an increase in the number of new or modified sources. This ICR assumes an industry growth rate of 11 respondents per year, which results in an average increase of 33 respondents since the last ICR renewal period. The industry growth also results in an increase in O&M costs. In addition, this ICR corrects the number of new sources that are expected to use COMS for PM monitoring, which results in an increase in capital costs.

$229,976
No
No
No
No
No
Uncollected
Learia Williams 202 564-4113 williams.learia@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/11/2013