NSPS for Small
Industrial-Commercial-Institutional Steam Generating Units (40 CFR
part 60, subpart Dc) (Renewal)
Extension without change of a currently approved collection
No
Regular
01/11/2021
Requested
Previously Approved
36 Months From Approved
02/28/2021
721
677
219,000
205,000
12,600,000
11,800,000
Owners and operators of affected
facilities are required to comply with reporting and record keeping
requirements for the General Provisions (40 CFR Part 60, Subpart
A), as well as for the specific requirements at 40 CFR Part 60,
Subpart Dc. This includes submitting initial notifications,
performance tests and periodic reports and results, and maintaining
records of the occurrence and duration of any startup, shutdown, or
malfunction in the operation of an affected facility, or any period
during which the monitoring system is inoperative. These reports
are used by EPA to determine compliance with these
standards.
Owners and operators of
affected facilities are required to comply with reporting and
record keeping requirements for the General Provisions (40 CFR part
60, subpart A), as well as for the specific requirements at 40 CFR
part 60, subpart Dc. This includes submitting initial
notifications, performance tests and periodic reports and results,
and maintaining records of the occurrence and duration of any
startup, shutdown, or malfunction in the operation of an affected
facility, or any period during which the monitoring system is
inoperative. These reports are used by EPA to determine compliance
with these standards.
$302,000
No
No
No
No
No
No
No
Patrick Yellin 202
564-2970
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.