The NSPS for Stationary Gas Turbines
were proposed on October 3, 1977, and promulgated on September 10,
1979. Owners and operators of stationary gas turbines must submit a
one-time-only notification of construction/reconstruction,
modification, and startup date, initial performance test date,
physical or operational changes, and demonstration of a continuous
monitoring system. They also must provide a report on initial
performance test result, monitoring results, and any excess
emissions. Records must be maintained of: startups, shutdowns, and
malfunctions; periods when the continuous monitoring system is
inoperative; sulfur and nitrogen content of the fuel; fuel to water
ratio; rate of fuel consumption; and ambient conditions. Semiannual
reports are also required.
Learia Williams 202 564-4113
williams.learia@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.