Supplementary

Supplementary.XLS

NSPS for Metallic Mineral Processing Plants (40 CFR part 60, subpart LL) (Renewal)

Supplementary

OMB: 2060-0016

Document [ppt]
Download: ppt | pdf

Overview

A
B


Sheet 1: A

TABLE 1

ANNUAL BURDEN OF REPORTING AND RECORDKEEPING REQUIREMENTS












NSPS FOR METALLIC MINERAL PROCESSING PLANTS (40 CFR PART 60, SUBPART LL)





(RENEWAL)


REPORTING/RECORDKEEPING


Hours/Occurence (A) Occurences/Year (B) Hours/Year (C=A*B) (C) Respondents/Year (D) Tech. Person Hrs/Yr (E) (CxD) Mgt. Person Hrs/Yr (F) (E x .05) Clerical Person Hrs/Yr (G) (E x 0.1) Total Hours (H) Costs/Year (I)
1. APPLICATIONS

N/A N/A N/A N/A N/A N/A N/A N/A N/A
2. SURVEY AND STUDIES

N/A N/A N/A N/A N/A N/A N/A N/A N/A
3. REPORTING REQUIREMENTS












a. Read Instructions
1 1 1 1 1 0.05 0.1 1.15 $92.84

b. Required Activities













Initial Performance Tests 330 1 330 1 330 16.5 33 379.5 $30,636.54



Repeat of Performance Tests 330 0.2 66 1 66 3.3 6.6 75.9 $6,127.31

c. Create Information

------------------------Included in 3b----------------------------








d. Gather Existing Information

------------------------Included in 3b----------------------------








e. Write Report













Notification of Construction/Reconstruction 2 1 2 1 2 0.1 0.2 2.3 $185.68



Notification of Actual Startup 2 1 2 1 2 0.1 0.2 2.3 $185.68



Notification of Initial Performance Test 2 1 2 1 2 0.1 0.2 2.3 $185.68



Report of Performance Test
------------------------Included in 3b----------------------------










Notif. of Physical or Operational Change 2 1 2 0 0 0 0 0 $0.00



Notification of Demonstration of CMS 2 1 2 1 2 0.1 0.2 2.3 $185.68



Semi-Annual Scrubber Malfunction Report 8 2 16 20 320 16 32 368 $29,708.16



Report of CMS Demonstration
------------------------Included in 3b----------------------------










SUBTOTAL REPORTING






833.75 $67,307.55
4. RECORDKEEPING REQUIREMENTS












a. Read Instructions

------------------------Included in 3a----------------------------








b. Plan Activities

------------------------Included in 3b----------------------------








c. Implement Activities

------------------------Included in 3b----------------------------








d. Develop Record System
N/A N/A N/A N/A






e. Time to Enter Information













Records of Operating Parameters 0.25 250 62.5 20 1250 62.5 125 1437.5 $116,047.50



Records of Startup, Shutdown and Malfunction 1.5 1 1.5 20 30 1.5 3 34.5 $2,785.14

f. Train Personnel
N/A N/A N/A N/A N/A N/A N/A N/A N/A

g. Audits
N/A N/A N/A N/A N/A N/A N/A N/A N/A



SUBTOTAL RECORDK.






1472 $118,832.64














TOTAL ANNUAL BURDEN (HOURS & COST)









2,306 $186,140.00











(rounded) (rounded)































Assumptions












Number of existing plants 20











Time required to read instructions (hours) 1











Time required to complete performance test (hours) 330











Rate of failed performance tests 20%











Time required to complete Method 9 (hours) 4











Time required to record operating parameters (hours) 0.25











Number of days operating per year 250











Number of Reconstructed Facilities (per year) 1











Time required to record startups, shutdowns, malfunctions etc. (hours) 1.5











Number of startups, shutdowns, malfuctions, etc. (per year) 1











Time Required for notification preparation (hours) 2











Managerial labor rate $97.46











Technical labor rate $83.71











Clerical labor rate $42.55







































NOTE: We are estimating that one (1) existing facility will undego either a reconstruction or a physical or operational change such that the facility will be required to submit initial notifications and conduct an initial performance test. For the purpose of this table, we have identified the initial notification as a notification or construction/reconstruction rather than as a notification of a physical or operational change.










Sheet 2: B

TABLE 2 AVERAGE ANNUAL EPA RESOURCE REQUIREMENT











NSPS FOR METALLIC MINERAL PROCESSING PLANTS (40 CFR PART 60, SUBPART LL)




(RENEWAL)
















REPORTING/RECORDKEEPING REQUIREMENT

EPA Hours/Occurrence (A) Occurrences/Plant/Year (B) Total Hours/Year (C) Plants/Year (D) Tech Person Hours/Yr (E) Mgt. Person Hours/Yr (F) (E x .05) Clerical Person Hours/Yr (G) (E x 0.1) Total Hours (H) Total Cost/Year (I)
INITIAL PERFORMANCE TESTS











New Facility
24 1 24 1 24 1.2 2.4 27.6 $1,118.90
REPEAT PERFORMANCE TEST












New Facility
24 0.2 4.8 1 4.8 0.24 0.48 5.52 $223.78
REPORT REVIEW













Notification of Construction/Reconstruction 2 1 2 1 2 0.1 0.2 2.3 $93.24


Notification of Actual Startup 0.5 1 0.5 1 0.5 0.025 0.05 0.575 $23.31


Notification of Initial Performance Test 0.5 1 0.5 1 0.5 0.025 0.05 0.575 $23.31


Report of Performance Test 8 1 8 1 8 0.4 0.8 9.2 $372.97


Notif. of Physical or Operational Change 2 0 0 0 0 0 0 0 $0.00


Notification of Demonstration of CMS 0.5 1 0.5 1 0.5 0.025 0.05 0.575 $23.31


Semi-Annual Scrubber Malfunction Report 4 2 8 20 160 8 16 184 $7,459.36


Report of CMS Demonstration
----------------------- Included in Report of Performance Test -----------------------




















TOTAL ANNUAL BURDEN (HOURS & COST)








230 $9,338










(rounded) (rounded)















NOTE: We are estimating that one (1) existing facility will undego either a reconstruction or a physical or operational change such that the facility will be required to submit initial notifications and conduct an initial performance test. For the purpose of this table, we have identified the initial notification as a notification or construction/reconstruction rather than as a notification of a physical or operational change.



















































































































Assumptions











Number of Existing plants 20










Number of reconstructed plants per year 1










Rate of failed performance tests 20%










Time required to participate with performance test (per plant) 24










Time require to review construction notification (hours) 2










Time required to review startup and initial test notifications (hours) 0.5










Time required to review performance test results (hours) 8










Time required to review notification of demonstration of CMS (hours) 0.5










Time required to review semi-annual scrubber malfunction reports (hours) 4










Management Labor Rate $56.02










Technical Labor Rate $41.57










Clerical Labor Rate $22.50








File Typeapplication/vnd.ms-office
AuthorSounjay Gairola/DC/USEPA/US
Last Modified ByMDSADM10
File Modified2008-09-12
File Created2008-09-12

© 2024 OMB.report | Privacy Policy