IN RM02-12-000, FERC amended its
regulations under the Federal Power Act to require public utilities
that own, control, or operate facilities for transmitting electric
energy in inter-state commerce to file revised open access
transmission tariffs containing standard generator interconnection
procedures and a standard agreement for interconnecting generators
smaller than 20 MW. Entities seeking to interconnect generators
have been hindered by the lack of standard interconnection
procedures and agreements. Standard interconnection procedures
limit opportunities for public utilities that own both generation
and transmission to favor their own generation and help produce
just and reasonable interconnection charges for generators. A
standard interconnection agreement reduces market entry costs for
generators and offers them access to regional energy markets on
standard terms.
US Code:
16
USC 824d Name of Law: Federal Power Act
US Code: 16
USC 824e Name of Law: Federal Power Act
There is a decrease of 5,188
hours in the respondent burden from the Commissions last OMB
submission due to the accomplishment of the incorporation of
interconnection procedures and agreements into the OATTs. The
remaining burden is for the maintenance of these documents and that
associated with the preparation of non-conforming documents. The
burden estimate is based on recent Commission experience with the
filings.
$507,966
No
No
Uncollected
Uncollected
Uncollected
Uncollected
Patricia Morris 202
208-6990
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.