Facilities Design, Connections and Maintenance Reliability Standards

ICR 200801-1902-002

OMB: 1902-0247

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2008-01-09
Supporting Statement A
2008-01-09
Supplementary Document
2007-08-21
IC Document Collections
ICR Details
1902-0247 200801-1902-002
Historical Active 200708-1902-005
FERC FERC-725D
Facilities Design, Connections and Maintenance Reliability Standards
Existing collection in use without an OMB Control Number   No
Regular
Approved without change 05/02/2008
Retrieve Notice of Action (NOA) 01/09/2008
  Inventory as of this Action Requested Previously Approved
05/31/2011 36 Months From Approved
250 0 0
75,000 0 0
0 0 0

In accordance with the authority granted it in section 215 of the Federal Power Act, FERC is proposing to approve three Reliability Standards developed by the North American Reliability Corporation (NERC). NERC has been certified by FERC as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. The three new Reliability Standards, designated by NERC as FAC-010-1, FAC-011-1 and FAC-014-1, set requirements for the development of system operating limits of the Bulk-Power System for use in planning and operating conditions.

US Code: 16 USC 824o Name of Law: Federal Power Act
   PL: Pub.L. 109 - 58 1211 Name of Law: Energy Policy Act
  
PL: Pub.L. 109 - 58 1211 Name of Law: Energy Policy Act 2005

1902-AD44 Final or interim final rulemaking 73 FR 1770 01/09/2008

No

1
IC Title Form No. Form Name
Facilities Design, Connections and Maintenance Relaibility Standards

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 250 0 250 0 0 0
Annual Time Burden (Hours) 75,000 0 75,000 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
This is a new information collection requirement that implements the provisions of the Electricity Modernization Act of 2005. The Act created section 215 of the Federal Power Act which provides for a system of mandatory reliability rules developed by the ERO, established by the Commission, and enforced by the Commission, subject to Commission review. The three Reliability Standards, as adopted, will implement the Congressional mandate of the Energy Policy Act of 2005 to develop mandatory and enforceable Reliability Standards to better ensure the reliability of the nation’s Bulk-Power System. Specifically, the three proposed Reliability Standards will ensure that system operating limits or SOLs used in the reliability planning and operation of the Bulk-Power System are determined based on an established methodology.

$189,576
No
No
Uncollected
Uncollected
Uncollected
Uncollected
Christy Walsh 202 502-6523 christy.walsh@ferc.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and