Facilities Design, Connections and Maintenance Reliability Standards

ICR 200708-1902-005

OMB: 1902-0247

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2007-08-21
Supporting Statement A
2007-08-21
IC Document Collections
ICR Details
1902-0247 200708-1902-005
Historical Inactive
FERC FERC-725D
Facilities Design, Connections and Maintenance Reliability Standards
New collection (Request for a new OMB Control Number)   No
Regular
Comment filed on proposed rule 11/28/2007
Retrieve Notice of Action (NOA) 08/21/2007
In accordance with 5 CFR 1320, OMB is withholding approval at this time. Prior to publication of the final rule, the agency should submit to OMB a summary of all comments related to the information collection contained in the proposed rule and the agency response. The agency should clearly indicate any changes made to the information collection as a result of these comments.
  Inventory as of this Action Requested Previously Approved
36 Months From Approved
0 0 0
0 0 0
0 0 0

In accordance with the authority granted it in section 215 of the Federal Power Act, FERC is proposing to approve three Reliability Standards developed by the North American Reliability Corporation (NERC). NERC has been certified by FERC as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. The three new Reliability Standards, designated by NERC as FAC-010-1, FAC-011-1 and FAC-014-1, set requirements for the development of system operating limits of the Bulk-Power System for use in planning and operating conditions.

US Code: 16 USC 824o Name of Law: Federal Power Act
   PL: Pub.L. 109 - 58 1211 Name of Law: Energy Policy Act
  
PL: Pub.L. 109 - 58 1211 Name of Law: Energy Policy Act 2005

1902-AD44 Proposed rulemaking 72 FR 46413 08/20/2007

No

1
IC Title Form No. Form Name
Facilities Design, Connections and Maintenance Relaibility Standards

No
No
This is a new information collection requirement that implements the provisions of the Electricity Modernization Act of 2005. The Act created section 215 of the Federal Power Act which provides for a system of mandatory reliability rules developed by the ERO, established by the Commission, and enforced by the Commission, subject to Commission review. The three Reliability Standards, if adopted, would implement the Congressional mandate of the Energy Policy Act of 2005 to develop mandatory and enforceable Reliability Standards to better ensure the reliability of the nation’s Bulk-Power System. Specifically, the three proposed Reliability Standards would ensure that system operating limits or SOLs used in the reliability planning and operation of the Bulk-Power System are determined based on an established methodology.

$61,069
No
No
Uncollected
Uncollected
Uncollected
Uncollected
Christy Walsh 202 502-6523 christy.walsh@ferc.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/21/2007