Value Engineering Requirements; FAR Sections Affected: 52.248-1; 52.248-2; and 52.248-3

OMB 9000-0027

OMB 9000-0027

FAR part 48, value engineering is the technique by which contractors (1) voluntarily suggest methods for performing more economically and share in any resulting savings or (2) are required to establish a program to identify and submit to the Government methods for performing more economically. These recommendations are submitted to the Government as Value Engineering Change Proposals (VECP’s).