NSPS/NESHAP for Wool Fiberglass Insulation Manufacturing Plants (40 CFR part 60, subpart PPP and 40 CFR part 63, subpart NNN) (Renewal)

OMB 2060-0114

OMB 2060-0114

Owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 63, Subpart A and 40 CFR Part 60, Subpart A), as well as for the specific requirements at 40 CFR Part 63, Subpart NNN and 40 CFR Part 60 Subpart PPP. This includes submitting initial notification reports, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with these standards.

The latest form for NSPS/NESHAP for Wool Fiberglass Insulation Manufacturing Plants (40 CFR part 60, subpart PPP and 40 CFR part 63, subpart NNN) (Renewal) expires 2022-11-30 and can be found here.

All Historical Document Collections
Extension without change of a currently approved collection 2022-09-26
Approved without change
Revision of a currently approved collection 2019-08-15
Approved without change
Extension without change of a currently approved collection 2016-07-01
Approved without change
Extension without change of a currently approved collection 2013-05-08
Comment filed on proposed rule and continue
Revision of a currently approved collection 2011-11-28
Approved without change
Extension without change of a currently approved collection 2010-04-01
Approved with change
Extension without change of a currently approved collection 2007-02-22
Approved without change
Extension without change of a currently approved collection 2003-07-21
Approved without change
Extension without change of a currently approved collection 2000-05-17
Approved without change
Extension without change of a currently approved collection 1997-01-22
Approved without change
Revision of a currently approved collection 1994-03-02
Approved without change
Reinstatement with change of a previously approved collection 1991-02-11
Approved with change
No material or nonsubstantive change to a currently approved collection 1989-04-03
Approved without change
Reinstatement with change of a previously approved collection 1987-04-15
Approved without change
New collection (Request for a new OMB Control Number) 1985-01-17
OMB Details

NSPS for Wool Fiberglass Insulation Manufacturing Plants (40 CFR Part 60, Subpart PPP)

Federal Enterprise Architecture: Environmental Management - Pollution Prevention and Control


© 2024 OMB.report | Privacy Policy