The Reliability Standard CIP-014-2 requires Transmission Owners and Transmission Operators to identify and protect Transmission stations and Transmission substations, and their associated primary control centers, that if rendered inoperable or damaged as a result of a physical attack could result in widespread instability, uncontrolled separation, or cascading within an Interconnection. In terms of information collection requirements, there are two main types of PRA activities: 1) Create or maintain documentation showing performance of a certain task; and 2) Develop a physical security plan.
The latest form for FERC-725U, (RD22-3) Mandatory Reliability Standards: Reliability Standard CIP-014 expires 2021-04-30 and can be found here.
Document Name |
---|
Supporting Statement A |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Approved without change |
Revision of a currently approved collection | 2022-09-20 | |
Approved without change |
Extension without change of a currently approved collection | 2021-02-26 | |
Approved without change |
Extension without change of a currently approved collection | 2017-12-19 | |
Approved with change |
New collection (Request for a new OMB Control Number) | 2014-11-24 | |
Comment filed on proposed rule |
New collection (Request for a new OMB Control Number) | 2014-07-24 |