Electric Power Surveys

ICR 202603-1905-001

OMB: 1905-0129

Federal Form Document

Forms and Documents
Document
Name
Status
No forms / supporting documents in this ICR. Check IC Document Collections.
ICR Details
1905-0129 202603-1905-001
Received in OIRA 202211-1905-001
DOE/EIA Electric Power Surveys
Electric Power Surveys
Revision of a currently approved collection   No
Regular 03/24/2026
  Requested Previously Approved
36 Months From Approved 07/31/2026
101,777 84,838
251,176 202,322
23,846,650 16,869,489

The electricity surveys collect data from entities involved in the production, transmission, delivery, and sale of electricity, as well as those responsible for maintaining the reliable operation of the power system. These data serve as the primary source of information on the nation’s electric power industry. EIA requests a three-year extension, with changes, to the Electric Power Surveys. The Electric Power Surveys Program collects data through annual, monthly, and daily/hourly surveys, each with its own set (or subset) of respondents to measure activity in specific sectors of the electric power industry. Forms EIA‑860, EIA‑861, and EIA‑923 include monthly data collections, and EIA‑861 also includes a short‑form version (EIA‑861S).

PL: Pub.L. 93 - 275 13(b) Name of Law: Federal Energy Administration Act of 1974
   US Code: 15 USC 790(a) Name of Law: FEA Act
   US Code: 15 USC 772 Name of Law: FEA Act
   US Code: 15 USC 764 Name of Law: FEA Act
  
None

Not associated with rulemaking

  90 FR 41997 08/28/2025
91 FR 13837 03/23/2026
Yes

12
IC Title Form No. Form Name
Annual Electric Generator Report EIA-860
Annual Electric Power Industry Report EIA-861
Annual Electric Power Industry Report (Short Form) EIA-861S
Annual Power Plant Operations Report EIA-923
Balancing Authority Generator Inventory Report EIA-930A
Form EIA 860 Annual Electric Generator Report w/o Environmental Form EIA-860
Hourly and Daily Balancing Authority Operations Report EIA-930
Monthly Electric Power Industry Report EIA-861M
Monthly Power Plant Operations Report EIA-923 (Monthly)
Monthly Update to the Annual Electric Generator Report EIA-860M
Photovoltaic Module Shipments Report (Annual) EIA-63B (Annual)
Photovoltaic Module Shipments Report (Monthly) EIA-63B Monthly
Respondent Pre‐testing
Supplemental Power Plant Operations Report EIA-923 (Supplemental)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 101,777 84,838 0 -146 17,085 0
Annual Time Burden (Hours) 251,176 202,322 0 -362 49,216 0
Annual Cost Burden (Dollars) 23,846,650 16,869,489 0 -30,205 7,007,366 0
No
Yes
Changing Forms
EIA will discontinue Form EIA-63B, Photovoltaic Module Shipments Report (Annual and Monthly). EIA determined that the value of the data collected by the survey no longer exceeds the burden of collecting and publishing it. This change is projected to reduce the reporting burden on the industry. Specifically, discontinuing the monthly survey will relieve approximately 120 annual respondents and save an estimated 314 annual burden hours, while discontinuing the annual survey will impact 26 fewer respondents and reduce burden hours by 48 annually.

$7,137,589
Yes Part B of Supporting Statement
    No
    No
No
No
No
No
Gerson Morales 571 619-3090 gerson.morales@eia.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/24/2026

Something went wrong when downloading this file. If you have any questions, please send an email to risc@gsa.gov.

© 2026 OMB.report | Privacy Policy