Supplementary Document
2025-11-20
Supplementary Document
2025-11-18
Supporting Statement A
2025-11-20
IC Document Collections
IC ID
Document
Title
Status
28631 Modified
ICR Details
2900-0422 202508-2900-005
Received in OIRA 202207-2900-008
VA PPS - 2
VAAR Construction Provisions and Clauses
Extension without change of a currently approved collection   No
Regular 11/20/2025
  Requested Previously Approved
36 Months From Approved 11/30/2025
1,706 1,706
2,974 2,974
0 0

This PRA submission seeks renewal without changes of OMB approval No. 2900-0422 for five collections of information for the Department of Veterans Affairs Acquisition Regulation (VAAR) clauses, as follows: • Clause 852.232-70, Payment Under Fixed-Price Construction Contracts (without NAS-CPM), requires construction contractors, without NAS-CPM, to submit a schedule of costs for work to be performed under the contract. • Clause 852.232-71, Payment Under Fixed-Price Construction Contracts (including NAS-CPM), requires construction contractors, including NAS-CPM, to submit a schedule of costs for work to be performed under the contract. • Clause 852.236-72, Performance of Work by the Contractor, , requires contractors awarded a construction contract containing Federal Acquisition Regulation (FAR) clause 52.236-1, Performance of Work by the Contractor, to submit a statement designating the branch or branches of contract work to be performed by the contractor’s own forces. • Clause 852.236-80, Subcontracts and Work Coordination, requires construction contractors, on contracts involving complex mechanical-electrical work, to furnish coordination drawings showing the manner in which utility lines will fit into available space and relate to each other and to the existing building elements. • Clause 852.243-70, Construction Contract Changes-Supplement, requires contractors to submit cost proposals for changes ordered by the contracting officer or for changes proposed by the contractor. An agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. The Federal Register Notice with a 60-day comment period soliciting comments this collection of information was published at 90 FR 44907, September 17, 2025.

US Code: 48 USC 801 Name of Law: Department of Veterans Affairs Acquisition Regulation System
  
None

Not associated with rulemaking

  90 FR 44907 09/17/2025
90 FR 52495 11/20/2025
No

1
IC Title Form No. Form Name
VAAR Construction Clauses for OMB #2900-0422

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 1,706 1,706 0 0 0 0
Annual Time Burden (Hours) 2,974 2,974 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$138,975
No
    No
    No
No
No
No
No
Forrest Browne 202 714-6863 forrest.browne@va.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/20/2025


© 2025 OMB.report | Privacy Policy