NSPS for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) (Renewal)

ICR 202502-2060-020

OMB: 2060-0083

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2025-02-27
Supporting Statement A
2025-02-27
Supplementary Document
2025-02-27
ICR Details
2060-0083 202502-2060-020
Received in OIRA 202109-2060-003
EPA/OAR 1127.14
NSPS for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) (Renewal)
Extension without change of a currently approved collection   No
Regular 02/28/2025
  Requested Previously Approved
36 Months From Approved 02/28/2025
869 978
3,485 4,120
0 0

The New Source Performance Standards (NSPS) for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) apply to hot mix asphalt facilities that commenced construction or modification after June 11, 1973. A hot mix asphalt facility is comprised only of any combination of the following: dryers; systems for screening, handling, storing, and weighing hot aggregate; systems for loading, transferring, and storing mineral filler; systems for mixing hot mix asphalt; and the loading, transfer, and storage systems associated with emission control systems. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart I

US Code: 42 USC 7401 Name of Law: Clearn Air Act
  
None

Not associated with rulemaking

  88 FR 31748 05/18/2023
90 FR 10918 02/28/2025
No

1
IC Title Form No. Form Name
NSPS for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) (Renewal)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 869 978 0 0 -109 0
Annual Time Burden (Hours) 3,485 4,120 0 0 -635 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There is a decrease in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens due to a decrease in the number of sources. This ICR adjusts the number of respondents based on a review of facilities identified in EPAs ECHO database, which is the most recent source of facility information available for hot mix asphalt facilities.

$21,100
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
02/28/2025


© 2025 OMB.report | Privacy Policy