Sheet 1: Cover

ATTACHMENT 1
SUPPORTING STATEMENT
Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)

TABLES 1a, 1b, 2a, 2b, 3a, and 3b
Annual Respondent Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule) – (a) Publicly Owned and (b) Privately Owned; Years 1-3

TABLE 4
Summary of Annual Respondent Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, WWWW) (Final Rule) Rule)

TABLES 5, 6, and 7
Annual Designated Administrator Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule) – Years 1-3

TABLE 8
Summary of Annual Designated Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)

TABLES 9, 10, and 11
Annual Agency Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule) – Years 1-3

TABLE 12
Summary of Annual Agency Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)

TABLE: Number of Respondents

TABLE: Summary of Total Annual Responses

Sheet 2: Inputs

Industry Wages*




May 2022 National Industry-Specific Occupational Employment and Wage Estimates




NAICS 562200 - Waste Treatment and Disposal




Category Occupation Code Mean hourly rate ($/hr) Fringe Benefit Loading Rate Overhead and Profit Rate Loaded Rate ($/hr)
Technical 17-2112 49.94 1.5 1.4 104.87
Management 11-9041 78.91 1.5 1.4 165.71
Clerical 43-9061 19.32 1.5 1.4 40.57
https://www.bls.gov/oes/current/naics4_562200.htm




*Labor rates are assumed to be comparable between private and public sector.






















EPA Wages





Hourly Mean Wage With Fringe & Overhead


(GS- 12, step 1) - Tech. 34.07 $54.51


(GS- 13, step 5) - Mgmt. 45.91 $73.46


(GS-6, step 3) - Cler. 18.44 $29.50


https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/23Tables/html/GS_h.aspx






















Facilities





Number of Facilities Number of Units


Existing 57 152


Municipality Owned* 22 62


Privately Owned* 35 90


*Based on 2022 inventory.





Sheet 3: Table 1a

Table 1a: Annual Municipality-Owned Respondent Burden and Cost Year One – Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)





$104.87 $165.71 $40.57
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications d N/A






2. Survey and Studies N/A






3. Reporting requirements







A. Familiarize with regulatory requirements e 8 1 8 22 176 8.8 17.6 $20,630.15
B. Required activities







Initial performance test N/A






Repeat performance test N/A






CEMS demonstration f N/A






Annual performance test N/A






C. Write report







Notifications (construction/modification, start-up, initial/repeat performance test, CEMS demonstration, CEMS start/stop, exemptions) N/A






Performance test reports
(initial/repeat and annual compliance)
N/A






CEMS demonstration report 8 1 8 22 176 8.8 17.6 $20,630.15
Familiarize with CEDRI 4 1 4 22 88 4.4 8.8 $10,315.07
Electronic data submittal 1 1 1 22 22 1.1 2.2 $2,578.77
Subtotal for Reporting Requirements



531 $54,154
4. Recordkeeping requirements







Record startups, shutdowns, and malfunctions N/A






Records of all emission rates, computations, tests g 4 1 4 22 88 4.4 8.8 $10,315.07
Records of employee review of operations manual N/A






Records of operating parameters for control devices N/A






Subtotal for Recordkeeping Requirements



101 $10,315
TOTAL LABOR BURDEN AND COST (rounded) h



633 $64,500
TOTAL CAPITAL AND O&M COST (rounded) h






$0
GRAND TOTAL (rounded) h






$64,500









Assumptions:
















a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates for both privately and publicly owned sources: $165.71 for managerial, $104.87 for technical, and $40.57 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, May 2022, National Industry-Specific Occupational Employment and Wage Estimates for 562200 - Waste Treatment and Disposal. These rates have been adjusted using a Fringe Benefit Loading Rate of 1.5 and an Overhead and Profit Rate of 1.4 (Mean Hourly Rate * Fringe Benefit Loading Rate * Overhead and Profit Rate = Loaded Rate) to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
d No additional permit applications are anticipated within the first three years.
e This ICR assumes all existing respondents will have to familiarize themselves with the amended regulatory requirements each year for the first three years.
f Adjustments and record coding to accommodate new CEMS requirements during start-up and shutdown are included under the CEMS demonstration report element of 3C.
g Includes additional hours for downloading/processing CEMS data now required to be collected during start-up and shutdown.
h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 4: Table 1b

Table 1b: Annual Privately Owned Respondent Burden and Cost Year One – Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)





$104.87 $165.71 $40.57
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications d N/A






2. Survey and Studies N/A






3. Reporting requirements 0






A. Familiarize with regulatory requirements e 8 1 8 35 280 14 28 $32,820.69
B. Required activities 0






Initial performance test N/A






Repeat performance test N/A






CEMS demonstration f N/A






Annual performance test N/A






C. Write report 0






Notifications (construction/modification, start-up, initial/repeat performance test, CEMS demonstration, CEMS start/stop, exemptions) N/A






Performance test reports
(initial/repeat and annual compliance)
N/A






CEMS demonstration report 8 1 8 35 280 14 28 $32,820.69
Familiarize with CEDRI 4 1 4 35 140 7 14 $16,410.35
Electronic data submittal 1 1 1 35 35 1.75 3.5 $4,102.59
Subtotal for Reporting Requirements 0


845 $86,154
4. Recordkeeping requirements 0






Record startups, shutdowns, and malfunctions N/A






Records of all emission rates, computations, tests g 4 1 4 35 140 7 14 $16,410.35
Records of employee review of operations manual N/A






Records of operating parameters for control devices N/A






Subtotal for Recordkeeping Requirements



161 $16,410
TOTAL LABOR BURDEN AND COST (rounded) h



1,006 $102,600
TOTAL CAPITAL AND O&M COST (rounded) h






$0
GRAND TOTAL (rounded) h






$102,600









Assumptions:
















a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates for both privately and publicly owned sources: $165.71 for managerial, $104.87 for technical, and $40.57 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, May 2022, National Industry-Specific Occupational Employment and Wage Estimates for 562200 - Waste Treatment and Disposal. These rates have been adjusted using a Fringe Benefit Loading Rate of 1.5 and an Overhead and Profit Rate of 1.4 (Mean Hourly Rate * Fringe Benefit Loading Rate * Overhead and Profit Rate = Loaded Rate) to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
d No additional permit applications are anticipated within the first three years.
e This ICR assumes all existing respondents will have to familiarize themselves with the amended regulatory requirements each year for the first three years.
f Adjustments and record coding to accommodate new CEMS requirements during start-up and shutdown are included under the CEMS demonstration report element of 3C.
g Includes additional hours for downloading/processing CEMS data now required to be collected during start-up and shutdown.
h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 5: Table 2a

Table 2a: Annual Municipality-Owned Respondent Burden and Cost Year Two – Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)





$104.87 $165.71 $40.57
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications N/A






2. Survey and Studies N/A






3. Reporting requirements







A. Familiarize with regulatory requirements d 8 1 8 22 176 8.8 17.6 $20,630.15
B. Required activities







Initial performance test N/A






Repeat performance test N/A






CEMS demonstration N/A






Annual performance test N/A






C. Write report







Notifications (construction/modification, start-up, initial/repeat performance test, CEMS demonstration, CEMS start/stop, exemptions) N/A






Performance test reports
(initial/repeat and annual compliance)
N/A






CEMS demonstration report N/A






Familiarize with CEDRI 1 1 1 22 22 1.1 2.2 $2,578.77
Electronic data submittal 1 1 1 22 22 1.1 2.2 $2,578.77
Subtotal for Reporting Requirements



253 $25,788
4. Recordkeeping requirements







Record startups, shutdowns, and malfunctions N/A






Records of all emission rates, computations, tests N/A






Records of employee review of operations manual N/A






Records of operating parameters for control devices N/A






Subtotal for Recordkeeping Requirements



0 $0
TOTAL LABOR BURDEN AND COST (rounded) e



253 $25,800
TOTAL CAPITAL AND O&M COST (rounded) e






$0
GRAND TOTAL (rounded) e






$25,800









Assumptions:
















a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates for both privately and publicly owned sources: $165.71 for managerial, $104.87 for technical, and $40.57 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, May 2022, National Industry-Specific Occupational Employment and Wage Estimates for 562200 - Waste Treatment and Disposal. These rates have been adjusted using a Fringe Benefit Loading Rate of 1.5 and an Overhead and Profit Rate of 1.4 (Mean Hourly Rate * Fringe Benefit Loading Rate * Overhead and Profit Rate = Loaded Rate) to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
d This ICR assumes all existing respondents will have to familiarize themselves with the amended regulatory requirements each year for the first three years.
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 6: Table 2b

Table 2b: Annual Privately Owned Respondent Burden and Cost Year Two – Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)





$104.87 $165.71 $40.57
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications N/A






2. Survey and Studies N/A






3. Reporting requirements







A. Familiarize with regulatory requirements d 8 1 8 35 280 14 28 $32,820.69
B. Required activities







Initial performance test N/A






Repeat performance test N/A






CEMS demonstration N/A






Annual performance test N/A






C. Write report







Notifications (construction/modification, start-up, initial/repeat performance test, CEMS demonstration, CEMS start/stop, exemptions) N/A






Performance test reports
(initial/repeat and annual compliance)
N/A






CEMS demonstration report N/A






Familiarize with CEDRI 1 1 1 35 35 1.75 3.5 $4,102.59
Electronic data submittal 1 1 1 35 35 1.75 3.5 $4,102.59
Subtotal for Reporting Requirements



403 $41,026
4. Recordkeeping requirements







Record startups, shutdowns, and malfunctions N/A






Records of all emission rates, computations, tests N/A






Records of employee review of operations manual N/A






Records of operating parameters for control devices N/A






Subtotal for Recordkeeping Requirements



0 $0
TOTAL LABOR BURDEN AND COST (rounded) e



403 $41,000
TOTAL CAPITAL AND O&M COST (rounded) e






$0
GRAND TOTAL (rounded) e






$41,000









Assumptions:
















a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates for both privately and publicly owned sources: $165.71 for managerial, $104.87 for technical, and $40.57 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, May 2022, National Industry-Specific Occupational Employment and Wage Estimates for 562200 - Waste Treatment and Disposal. These rates have been adjusted using a Fringe Benefit Loading Rate of 1.5 and an Overhead and Profit Rate of 1.4 (Mean Hourly Rate * Fringe Benefit Loading Rate * Overhead and Profit Rate = Loaded Rate) to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
d This ICR assumes all existing respondents will have to familiarize themselves with the amended regulatory requirements each year for the first three years.
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 7: Table 3a

Table 3a: Annual Municipality-Owned Respondent Burden and Cost Year Three – Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)





$104.87 $165.71 $40.57
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications N/A






2. Survey and Studies N/A






3. Reporting requirements







A. Familiarize with regulatory requirements d 8 1 8 22 176 8.8 17.6 $20,630.15
B. Required activities







Initial performance test N/A






Repeat performance test N/A






CEMS demonstration N/A






Annual performance test N/A






C. Write report







Notifications (construction/modification, start-up, initial/repeat performance test, CEMS demonstration, CEMS start/stop, exemptions) N/A






Performance test reports
(initial/repeat and annual compliance)
N/A






CEMS demonstration report N/A






Familiarize with CEDRI 1 1 1 22 22 1.1 2.2 $2,578.77
Electronic data submittal 1 1 1 22 22 1.1 2.2 $2,578.77
Subtotal for Reporting Requirements



253 $25,788
4. Recordkeeping requirements







Record startups, shutdowns, and malfunctions N/A






Records of all emission rates, computations, tests N/A






Records of employee review of operations manual N/A






Records of operating parameters for control devices N/A






Subtotal for Recordkeeping Requirements



0 $0
TOTAL LABOR BURDEN AND COST (rounded) e



253 $25,800
TOTAL CAPITAL AND O&M COST (rounded) e






$0
GRAND TOTAL (rounded) e






$25,800









Assumptions:
















a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates for both privately and publicly owned sources: $165.71 for managerial, $104.87 for technical, and $40.57 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, May 2022, National Industry-Specific Occupational Employment and Wage Estimates for 562200 - Waste Treatment and Disposal. These rates have been adjusted using a Fringe Benefit Loading Rate of 1.5 and an Overhead and Profit Rate of 1.4 (Mean Hourly Rate * Fringe Benefit Loading Rate * Overhead and Profit Rate = Loaded Rate) to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
d This ICR assumes all existing respondents will have to familiarize themselves with the amended regulatory requirements each year for the first three years.
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 8: Table 3b

Table 3b: Annual Privately Owned Respondent Burden and Cost Year Three – Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)





$104.87 $165.71 $40.57
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications N/A






2. Survey and Studies N/A






3. Reporting requirements







A. Familiarize with regulatory requirements d 8 1 8 35 280 14 28 $32,820.69
B. Required activities







Initial performance test N/A






Repeat performance test N/A






CEMS demonstration N/A






Annual performance test N/A






C. Write report







Notifications (construction/modification, start-up, initial/repeat performance test, CEMS demonstration, CEMS start/stop, exemptions) N/A






Performance test reports
(initial/repeat and annual compliance)
N/A






CEMS demonstration report N/A






Familiarize with CEDRI 1 1 1 35 35 1.75 3.5 $4,102.59
Electronic data submittal 1 1 1 35 35 1.75 3.5 $4,102.59
Subtotal for Reporting Requirements



403 $41,026
4. Recordkeeping requirements







Record startups, shutdowns, and malfunctions N/A






Records of all emission rates, computations, tests N/A






Records of employee review of operations manual N/A






Records of operating parameters for control devices N/A






Subtotal for Recordkeeping Requirements



0 $0
TOTAL LABOR BURDEN AND COST (rounded) e



403 $41,000
TOTAL CAPITAL AND O&M COST (rounded) e






$0
GRAND TOTAL (rounded) e






$41,000









Assumptions:
















a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates for both privately and publicly owned sources: $165.71 for managerial, $104.87 for technical, and $40.57 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, May 2022, National Industry-Specific Occupational Employment and Wage Estimates for 562200 - Waste Treatment and Disposal. These rates have been adjusted using a Fringe Benefit Loading Rate of 1.5 and an Overhead and Profit Rate of 1.4 (Mean Hourly Rate * Fringe Benefit Loading Rate * Overhead and Profit Rate = Loaded Rate) to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
d This ICR assumes all existing respondents will have to familiarize themselves with the amended regulatory requirements each year for the first three years.
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 9: Table 4

Table 4 - Summary of Annual Respondent Burden and Cost - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, WWWW) (Final Rule)








Year Total Labor Hours Labor Costs Non-Labor (Capital/Startup and O&M) Costs Total Costs
1 1,639 $167,034 $0 $167,034
2 656 $66,814 $0 $66,814
3 656 $66,814 $0 $66,814
Total (rounded) 2,950 $301,000 $0 $301,000
Average (rounded) 980 $100,000 $0 $100,000

Sheet 10: Table 5

Table 5: Average Annual Designated Administrator Burden and Cost Year One - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)












$54.51 $73.46 $29.50
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications d N/A






2. Familiarize with Regulatory Requirements 4 0 0 15 0 0 0 $0
3. Required Activitiese N/A






A. Develop a state plan 400 0 0 15 0 0 0 $0
B. Public hearing on state plan and certification of hearing 8 0 0 15 0 0 0 $0
C. Submit a negative declaration 1 0 0 15 0 0 0 $0
4. Review notifications and reports







Notification of construction/ modification N/A






Notification of actual startup N/A






Notification of initial/repeat performance test N/A






Initial performance test N/A






Repeat performance test N/A






Semiannual report N/A






TOTAL (rounded) f



0 $0









Assumptions:







a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned and 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates: $73.46 for managerial, $54.51 for technical, and $29.50 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. 
d No additional permit applications are anticipated within the first three years.
e We have assumed that Designated Administrators have completed all other activities for the units affected by this subpart that are currently subject to subparts Ea, Eb, and Cb.
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 11: Table 6

Table 6: Average Annual Designated Administrator Burden and Cost Year Two - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)












$54.51 $73.46 $29.50
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications N/A






2. Familiarize with Regulatory Requirements 4 15 60 15 900 45 90 $49,060.80
3. Required Activitiese N/A






A. Develop a state plan 400 1 400 15 6,000 300 600 $327,072.00
B. Public hearing on state plan and certification of hearing 8 1 8 15 120 6 12 $6,541.44
C. Submit a negative declaration 1 0 0 15 0 0 0 $0
4. Review notifications and reports







Notification of construction/ modification N/A






Notification of actual startup N/A






Notification of initial/repeat performance test N/A






Initial performance test N/A






Repeat performance test N/A






Semiannual report N/A






TOTAL (rounded) f



8,073 $382,670









Assumptions:







a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned and 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates: $73.46 for managerial, $54.51 for technical, and $29.50 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. 
e We have assumed that Designated Administrators have completed all other activities for the units affected by this subpart that are currently subject to subparts Ea, Eb, and Cb.
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 12: Table 7

Table 7: Average Annual Designated Administrator Burden and Cost Year Three - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)












$54.51 $73.46 $29.50
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Applications N/A






2. Familiarize with Regulatory Requirements 4 0 0 15 0 0 0 $0.00
3. Required Activitiese N/A






A. Develop a state plan 400 0 0 15 0 0 0 $0.00
B. Public hearing on state plan and certification of hearing 8 0 0 15 0 0 0 $0.00
C. Submit a negative declaration 1 0 0 15 0 0 0 $0
4. Review notifications and reports N/A






Notification of construction/ modification N/A






Notification of actual startup N/A






Notification of initial/repeat performance test N/A






Initial performance test N/A






Repeat performance test N/A






Semiannual report N/A






TOTAL (rounded) f



0 $0









Assumptions:







a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned and 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates: $73.46 for managerial, $54.51 for technical, and $29.50 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. 
e We have assumed that Designated Administrators have completed all other activities for the units affected by this subpart that are currently subject to subparts Ea, Eb, and Cb.
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 13: Table 8

Table 8: Summary of Annual Designated Administrator Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)



Year Total Hours Labor Costs Non-Labor Costs Total Costs
1 0 $0 $0 $0
2 8,073 $382,670 $0 $382,670
3 0 $0 $0 $0
Total (Rounded) 8,070 $383,000 $0 $383,000
Average (Rounded) 2,690 $128,000 $0 $128,000

Sheet 14: Table 9

Table 9: Average Annual EPA Burden and Cost Year One - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)












$54.51 $73.46 $29.50
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Review State reports







Review notification of public hearing on State plan 2 1 2 0 0 0 0 $0
Review certification for public hearing 2 1 2 0 0 0 0 $0
Review/approve State plan 300 1 300 0 0 0 0 $0
2. Applications d N/A






Notification of construction/ modification N/A






Notification of actual startup N/A






Notification of initial/repeat performance test N/A






Initial performance test N/A






Repeat performance test N/A






Semiannual report N/A






TOTAL (rounded) e



0 $0









Assumptions:







a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned and 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates: $73.46 for managerial, $54.51 for technical, and $29.50 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. 
d No additional permit applications are anticipated within the first three years.
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 15: Table 10

Table 10: Average Annual EPA Burden and Cost Year Two - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)












$54.51 $73.46 $29.50
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Review State reports







Review notification of public hearing on State plan 2 1 2 15 30 1.5 3 $1,834.06
Review certification for public hearing 2 1 2 15 30 1.5 3 $1,834.06
Review/approve State plan 300 1 300 15 4500 225 450 $275,108.40
2. Applications d N/A






Notification of construction/ modification N/A






Notification of actual startup N/A






Notification of initial/repeat performance test N/A






Initial performance test N/A






Repeat performance test N/A






Semiannual report N/A






TOTAL (rounded) d



5244 $278,780









Assumptions:







a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned and 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates: $73.46 for managerial, $54.51 for technical, and $29.50 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. 
d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 16: Table 11

Table 11: Average Annual EPA Burden and Cost Year Three - Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)












$54.51 $73.46 $29.50
Burden item a (A) (B) (C) (D) (E) (F) (G) (H)
Person-hours per occurrence No. of occurrences per respondent per year Person-hours per respondent per year
(C=AxB)
Respondents per year b Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.1)
Total cost per year ($) c
1. Review State reports







Review notification of public hearing on State plan 2 1 2 0 0 0 0 $0
Review certification for public hearing 2 1 2 0 0 0 0 $0
Review/approve State plan 300 1 300 0 0 0 0 $0
2. Applications d N/A






Notification of construction/ modification N/A






Notification of actual startup N/A






Notification of initial/repeat performance test N/A






Initial performance test N/A






Repeat performance test N/A






Semiannual report N/A






TOTAL (rounded) d



0 $0









Assumptions:







a These burden estimates are intended to be incremental. Requirements already established for existing large MWCs are indicated as N/A in column (A) and already accounted for in a separate ICR.
b There are 152 large MWC units at 57 facilities. Of these, there are 90 units at 35 plants that are privately owned and 62 units at 22 plants that are publicly owned. We have assumed that there will be no new respondents over the three-year period of this ICR.
c This ICR uses the following labor rates: $73.46 for managerial, $54.51 for technical, and $29.50 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. 
d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 17: Table 12

Table 12: Summary of Annual Agency Burden and Cost of the Emission Guidelines for Existing Sources: Large Municipal Waste Combustors Voluntary Remand Response and 5-year Review (40 CFR Part 60, Subpart WWWW) (Final Rule)



Year Total Hours Labor Costs Non-Labor Costs Total Costs
1 0 $0 $0 $0
2 5,244 $278,780 $0 $278,780
3 0 $0 $0 $0
Total (Rounded) 5,244 $278,780 $0 $278,780
Average (Rounded) 1,748 $92,927 $0 $92,930

Sheet 18: Responses

Summary of Total Annual Responses








(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Owners and operators of large MWCs
Case-by-case NOx emission limit demonstration 0 0 0 0
Electronic data submittal 57 1 0 57
Designated Administrators
State plan submittal 15 1 0 15
Notification of public hearing 15 1 0 15



Subtotal (rounded) 87

Sheet 19: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports


(A) (B) (C) (D) (E)
Year Number of New Respondents Number of Existing Respondentsa Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents
(E=A+B+C-D)
1 0 72 0 0 72
2 0 72 0 0 72
3 0 72 0 0 72
Average 0 72 0 0 72
a An average of 57 large MWC plants (respondents) will be subject to the standards over the next three years. Additionally, it is estimated there will be 15 State Designated Administrators. Total number of respondents = (57 + 15) = 72.