Burden Calculations Table

1131t14.xlsx

NSPS for Glass Manufacturing Plants (40 CFR Part, 60 Subpart CC) (Renewal)

Burden Calculations Table

OMB: 2060-0054

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Responses
Respondents


Sheet 1: Summary

ICR Summary Information
Hours per Response 8
Number of Respondents 41
Total Estimated Burden Hours 850
Total Estimated Costs $345,000
Annualized Capital O&M $238,000
Total Annual Responses 103
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Glass Manufacturing Plants (40 CFR Part 60, Subpart CC) (Renewal)






















Burden Item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year
(C=AxB)
(D)
Respondents per year a
(E)
Technical person- hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Management $163.17
3. Reporting Requirements








Technical $130.28
A. Familiarization with rule requirements c 1 1 1 41 41 2.05 4.1 $5,945.39
Clerical $65.71
B. Required Activities










Initial performance test d 160 1 160 0 0 0 0 $0.00


Repeat of performance test e 160 0.2 32 0 0 0 0 $0.00


C. Create Information See 3B









D. Gather existing information See 3B









E. Write report










Notification of construction/ reconstruction or modification 2 1 2 0 0 0 0 $0.00


Notification of actual startup f 2 1 2 0 0 0 0 $0.00


Notification of demonstration of CMS 2 1 2 0 0 0 0 $0.00


Notification of physical or operation change g 2 1 2 0 0 0 0 $0.00


Notification of initial performance test 2 1 2 0 0 0 0 $0.00


Performance test report See 3B









Demonstration of CMS See 3B









Request for alternative CMS 4 1 4 0 0 0 0 $0.00


Routine maintenance report h 2 1 2 21 42 2.1 4.2 $6,090.40


Semiannual report 8 2 16 41 656 32.8 65.6 $95,126.23


Subtotal for Reporting Requirements



850 $107,162


4. Recordkeeping requirements










A. Familiarization with rule requirements See 3A









B. Plan activities See 3B









C. Implement activities See 3B









D. Develop record system N/A









E. Time to enter information See 3E









F. Train personnel N/A









G. Audits N/A









Subtotal for Recordkeeping Requirements



0 $0


TOTAL LABOR BURDEN AND COST (rounded) i



850 $107,000
850
TOTAL CAPITAL AND O&M COST (rounded) i






$238,000
8 hr/response
GRAND TOTAL (rounded) i






$345,000














Assumptions:










a We have assumed that the number of existing respondents is 41, and that no additional new sources will become subject to the rule over the three-year period of this ICR.










b This ICR uses the following labor rates: Managerial $163.17 ($77.70 + 110%); Technical $130.28 ($62.04 + 110%); and Clerical $65.71 ($31.29 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


c We have assumed that it will take one hour for all existing respondents to familiarize with regulatory requirements.










d We have assumed that it will take 160 hours to complete a performance test.










e We have assumed that 20 percent will fail the performance tests.










f We have assumed that it will take two hours to write notification of actual startup report.










g We have assumed that it will take two hours to write notification report of physical or operation change.










h We have assumed that 50 percent of respondents will submit routine maintenance reports (41 x 50% = 20.5, rounded to 21).










i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Glass Manufacturing Plants (40 CFR Part 60, Subpart CC) (Renewal)






















Burden item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year (C=AxB)
(D)
Respondents per year a
(E)
Technical person- hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



Initial performance tests








Labor Rates
New or modified facility c 40 1 40 0 0 0 0 $0
Management $73.46
Repeat performance test








Technical $54.51
New or modified facility c, d 40 0.2 8 0 0 0 0 $0
Clerical $29.50
Report review










New or Modified Facility









Modification of construction/ reconstruction or modification e 2 1 2 0 0 0 0 $0


Notification of actual startup f 0.5 1 0.5 0 0 0 0 $0


Notification of demonstration of CMS f 0.5 1 0.5 0 0 0 0 $0


Notification of physical or operational change f 0.5 1 0.5 0 0 0 0 $0


Notification of initial performance test f 0.5 1.2 0.6 0 0 0 0 $0


Review of performance test results g 8 1.2 9.6 0 0 0 0 $0


Review demonstration of CMS See "Review of performance test results"









Review request for alternative CMS 4 1 4 0 0 0 0 $0


Review of routine maintenance report h 2 1 2 21 42 2.1 4.2 $2,568


Review of semiannual reports 4 2 8 41 328 16.4 32.8 $20,052


TOTAL LABOR BURDEN AND COST (rounded) i



426 $22,600






Assumptions:


a We have assumed that the average number of existing respondents is 41, and that no additional new sources will become subject to the rule over the three-year period of this ICR.


b This cost is based on the average hourly labor rate as follows: Managerial $73.46 (GS-13, Step 5, $45.91 + 60%); Technical $54.51 (GS-12, Step 1, $34.07 + 60%); and Clerical $29.50 (GS-6, Step 3, $18.44 + 60%). These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c We have assumed that it will take 40 hours to participate with the performance tests.


d We have assumed that 20 percent of respondents will repeat performance tests because of failure.


e We have assumed that it will take two hours to review construction report.


f It will take each respondent 0.5 hours to review actual startup report, CMS report, physical or operational change report, and initial performance test report.


g We have assumed that it will take eight hours to review performance test results.


h We have assumed that 50 percent of respondents will submit routine maintenance reports (41 x 50% = 20.5, rounded to 21).










i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs 

(A) (B) (C) (D) (E) (F) (G)

Continuous Monitoring Device Capital/Startup Cost for One Respondent a Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent a Number of Respondents with O&M Total O&M,
(E X F)


Continuous Opacity Monitors $21,272 0 $0 $8,225 41 $237,800

Totals (rounded) b

$0

$238,000
$238,000
Assumptions







a Costs have been increased from 2008 to 2022 $ using the CEPCI Equipment Cost Index.







b Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.








Sheet 5: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Notification of construction/reconstruction or modification 0 1 0 0
Notification of actual startup 0 1 0 0
Notification of demonstration of CMS 0 1 0 0
Notification of physical or operation change 0 1 0 0
Notification of initial performance test 0 1 0 0
Request for alternative CMS 0 1 0 0
Routine maintenance report 21 1 0 21
Semiannual report 41 2 0 82



Total 103






Sheet 6: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)
1 0 41 0 0 41
2 0 41 0 0 41
3 0 41 0 0 41
Average 0 41 0 0 41
a New respondents include sources with constructed and reconstructed affected facilities.