Attachment to RUS Form 740C - Reimbursement to General Funds and State Distribution Disclosures |
|
|
|
|
|
|
|
|
|
|
Reimbursement to general funds includes: |
|
|
|
|
|
|
|
|
|
In SD includes 20 OH services, 7 URD services and 2.4 miles of OH and 1.12 miles of URD |
|
|
|
|
|
|
|
|
|
In NE includes 4 OH services, 2 URD services and .48 miles of OH and .32 miles of URD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In SD NEW facilities breakdown is $7,157,484 break down by: |
|
|
|
|
|
|
|
|
|
New Member Extensions - 436 member extensions for 53.8 miles totaling $1,635,064 |
|
|
|
|
|
|
|
|
|
System Improvements - $5,522,420 |
|
|
|
|
|
|
|
|
|
In SD new facilities plus inclusion of reimbursement to general funds is $8,376,957 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In NE NEW facilities breakdown is $4,398,580 |
|
|
|
|
|
|
|
|
|
New Member Extensions - 96 member extensions for 11.8 miles totaling $358,916 |
|
|
|
|
|
|
|
|
|
System Improvements - $4,039,664 |
|
|
|
|
|
|
|
|
|
In NE new facilities plus inclusion of reimbursement to general funds is $4,827,043 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total NEW facilities is $11,556,064 |
|
|
|
|
|
|
|
|
|
Total new facilities plus inclusion of reimbursement to general funds is $13,204,000 |
|
|
|
|
|
|
|
|
|
Cooperative serves 616 miles of line in NE and 1726 miles of line in SD for a total of 2342 as of December 2007. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This data will be used by RUS to review your financial situation. Your response is required (7 USC 901 et seq.) and is not confidential. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Form Approved |
|
|
|
|
|
USDA-RUS |
OMB No. 0572-0032; Expires 1/30/2025 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COST ESTIMATES AND LOAN BUDGET |
BORROWER AND LOAN DESIGNATION |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOR ELECTRIC BORROWERS |
To: U.S. Dept. of Agriculture, RUS, Washington, D. C. 20250 |
|
|
|
|
|
|
|
COST ESTIMATES AS OF: (Month, Year) |
|
|
|
|
|
INSTRUCTIONS |
|
|
See tabs "Pg1 Instr" through "Pg4 Instr" |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION A. COST ESTIMATES |
|
LOAN PERIOD |
4 |
YEARS |
|
|
|
|
|
|
|
|
2020-2023 CWP inclusive of Amendment(s) #X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. DISTRIBUTION |
|
|
|
|
|
|
|
|
|
COST ESTIMATES |
RUS USE ONLY |
100 |
a. New Line: (Excluding Tie-Lines) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Construction |
|
|
Consumers |
|
|
|
Miles |
|
|
|
|
|
101 |
URD 1 PH |
|
|
0 |
@ |
$0 |
|
0.00 |
|
|
$0 |
|
|
|
URD 3 PH |
|
|
0 |
@ |
$0 |
|
0.00 |
|
|
$0 |
|
|
102 |
OH 1 PH |
|
|
0 |
@ |
$0 |
|
0.00 |
|
|
$0 |
|
|
|
OH 3 PH |
|
|
0 |
@ |
$0 |
|
0.00 |
|
|
$0 |
|
|
|
Total Consumers. . . . . . . . . . . . . |
|
|
0 |
|
Total Miles . . . . . . . . . . . . . . . . . . . . . . |
|
0.00 |
|
|
|
|
|
|
|
|
|
|
|
Less Contributions . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
0 |
|
|
|
|
|
Subtotal (New Line - code 100). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
200 |
b. New Tie-Lines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Line Designation |
|
|
|
|
Miles |
|
|
|
|
|
201 |
|
|
|
|
|
|
|
0.00 |
|
|
$0 |
|
|
202 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
203 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
204 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
|
Subtotal Code 200 from page 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
|
Subtotal Code 200 (Includes subtotals from pages 1A). . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
0.00 |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
300 |
c. Conversion and Line Changes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Line Designation |
|
|
|
|
Miles |
|
|
|
|
|
301 |
|
|
|
|
|
|
|
0.00 |
|
|
$0 |
|
|
302 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
303 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
304 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
305 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
306 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
307 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
308 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
309 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
310 |
|
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
|
Subtotal Code 300 from page 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
0.00 |
|
|
0 |
|
|
|
Subtotal Code 300 . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
0.00 |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
400 |
d. New Substations, Switching Stations, Metering Points, etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Station Designation |
|
|
kVA |
|
kV to kV |
|
|
|
|
|
401 |
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
402 |
|
|
|
|
|
|
|
|
|
|
0 |
|
|
403 |
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
$0 |
|
|
|
RUS FORM 740c |
|
|
(V5,5/29/09) |
|
|
|
|
|
|
|
PAGE 1 OF 4 PAGES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BORROWER AND LOAN DESIGNATION |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION A. COST ESTIMATES (cont.) |
|
|
|
|
|
|
|
|
|
|
|
BORROWER'S |
RUS USE ONLY |
|
|
|
|
|
|
|
|
|
|
|
|
|
COST ESTIMATES |
|
|
500 |
e. Substation, Switching Station, Metering Point Changes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Station Designation |
|
|
|
|
Description of Changes |
|
|
|
|
|
|
|
|
|
|
501 |
|
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
502 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
503 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
504 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
505 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
506 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
507 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
508 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
509 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
600 |
f. Miscellaneous Distribution Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
601 |
Transformers and Meters |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construction |
|
Transformers |
|
|
|
|
|
|
|
|
|
|
|
|
URD 1 PH |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
URD 3 PH |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
OH 1 PH |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
Meters |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 PH |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
3 PH |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
1 PH AMR Unit |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
3 PH AMR Unit |
|
0 |
@ |
$0 |
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subtotal code 601 . . . (included in total of all 600 codes below) |
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
602 |
Sets of Service Wires to increase Capacity |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
603 |
Sectionalizing Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
604 |
Regulators |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
605 |
Capacitors |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
606 |
Miscellaneous Replacements |
|
|
|
Poles and Associated Hardware Replacements: |
|
|
|
|
|
|
|
|
0 |
|
|
607 |
Miscellaneous Replacements |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
608 |
Non-site Specific URD to URD or OH to OH Conductor Replacements in the same right of way |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
609 |
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
610 |
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
611 |
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
612 |
Step Up/Down Transformers |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
613 |
Min/Max Meters |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
614 |
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
615 |
Communications (other than Fiber) |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
615 |
Communications (Fiber) |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
Subtotal ALL 600 codes . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
700 |
g. Other Distribution Items |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
701 |
Engineering Fees |
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
702 |
Security Lights |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
703 |
Reimbursement of General Funds |
|
|
|
Consumers |
0 |
Miles |
|
0.00 |
|
|
0 |
|
|
704 |
Load Management & SCADA |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
705 |
Automated Meter Reading Equip. |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
706 |
Broadband over Power line (BPL) |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
707 |
GIS Hardware Costs |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
708 |
GIS Software Costs |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
709 |
GIS Field Inventory Costs |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL DISTRIBUTION. . . . . . . . . |
|
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
800 |
2. Transmission |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. New Line |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Line Designation |
|
Voltage |
|
|
Wire Size |
|
|
Miles |
|
|
|
|
|
801 |
|
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
802 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
803 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
804 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
805 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
806 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
807 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
808 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
Subtotal Code 800 |
|
|
|
|
|
|
|
0.00 |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RUS Form |
740c |
(V5,5/29/09) |
|
|
|
|
|
|
|
|
|
|
PAGE 2 OF 4 PAGES |
|
|
COST ESTIMATE AND LOAN BUDGET FOR ELECTRIC BORROWERS |
|
|
|
|
|
|
BORROWER AND LOAN DESIGNATION |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION A. COST ESTIMATES |
|
|
|
(cont.) |
|
|
|
|
|
|
|
BORROWER'S |
RUS USE ONLY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COST ESTIMATES |
|
|
1400 |
5. ACQUISITIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1401 |
a. |
|
|
Consumers |
|
|
|
Miles |
|
|
|
|
|
$0 |
|
|
1402 |
b. |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
1403 |
c. Reimbursement of General Funds |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL ACQUISITIONS. . . . . . . . |
|
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1500 |
6. ALL OTHER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1501 |
|
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
1502 |
|
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
1503 |
|
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
1504-1511 |
|
Energy Efficiency and Conservation |
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
1512 |
|
Unassigned |
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
1513 |
Reimbursement of General Funds |
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL ALL OTHER. . . . . . . . . . . |
|
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION B. SUMMARY OF AMOUNTS AND SOURCES OF FINANCING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. GRAND TOTAL - ALL COSTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
2. FUNDS AND MATERIALS AVAILABLE FOR FACILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. Loan Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
$0 |
|
|
|
|
|
|
|
|
|
b. Materials and Special Equipment . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
c. General Funds . . . . . . . . . . . . . . . |
|
|
Purpose 1 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose 2 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose 3 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose 4 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose 5 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose 6 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total General Funds Applied . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
$0 |
|
|
|
|
|
|
|
d. Total Available Funds and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
3. NEW FINANCING REQUESTED FOR FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
4. RUS LOAN REQUESTED FOR FACILITIES (rounded DOWN to nearest $1,000). . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
5. TOTAL SUPPLEMENTAL LOAN REQUESTED . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
. . . . . . . . . . . . . . . . |
|
|
|
|
|
|
$0 |
|
|
|
|
N/A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of Supplemental Lender |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. CAPITAL TERM CERTIFICATE PURCHASES (CFC Loan only) . . . . . . . . . . . . |
|
|
|
|
|
|
0% |
|
|
|
|
|
$0 |
|
|
|
7. SUPPLEMENTAL LOAN REQUESTED FOR FACILITIES. . . . . . . . . . . . . . . . . . . . . . . . . |
|
|
|
|
|
|
|
|
|
|
|
|
$0 |
|
|
|
8. 100% SUPPLEMENTAL LOANS |
|
|
|
(SEE RUS Bulletin 20-14)* |
|
|
|
|
|
|
|
|
$0 |
|
|
|
* Identify in section A by budget purpose and separate subtotals. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION C. CERTIFICATION |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
We, the undersigned, certify that: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Upon completion of the electrical facilities contained herein and any others uncompleted at this time but for which |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
financing is available, the system will be capable of adequately and dependably serving the projected load for the |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
loan period as contained in our current RUS approved Power Requirement Study and Construction Work Plan. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. Negotiations have been or will be initiated with our power supplier, where necessary, to obtain new delivery points |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and/or additional capacity at existing ones to adequately supply the projected load upon which this loan application |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
is based. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. The data contained herein and all supporting documents have, to the best of my knowledge, been prepared correctly |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and in accordance with 7 CFR 1710.401(a)(3) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
|
|
Signature of Borrower's Manager |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
|
|
Signature of Borrower's President |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Corporate Name of Borrower |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GFR Initials |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RUS Form 740c |
|
(V5,5/29/09) |
|
|
|
|
|
|
|
|
|
PAGE 4 OF 4 PAGES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New Financing Requested for Facilities (740c pg 4, 1. GRAND TOTAL - ALL COSTS 3. New Financing requested for facilities): |
|
|
|
|
|
$- |
|
|
|
|
|
Useful Life in Years |
|
Amount |
|
$ x Years |
|
|
|
Purpose #1: Distribution Facilities (Enter Amounts from 740c) |
|
|
|
|
|
|
|
|
|
Code 100: New Lines Overhead & Underground (See Acct. Nos. 365, 366, 367) |
|
41.5 |
|
$- |
|
0 |
|
|
|
Code 200: New Tie-Lines (See Acct. Nos. 365, 366, 367) |
|
41.5 |
|
$- |
|
0 |
|
|
|
Code 300: Conversion and Line Changes (See Acct. Nos. 365, 366, 367) |
|
41.5 |
|
$- |
|
0 |
|
|
|
Code 400: New Substations, Switching Stations and Metering Points, etc. (See Acct. No. 362) |
|
37 |
|
$- |
|
0 |
|
|
|
Code 500: Substation, Switching Station and Metering Point Changes (See Acct. No. 362) |
|
37 |
|
$- |
|
0 |
|
|
|
Code 601: AMR/AMI Meters and/or AMR Modules/ Devices installed in Meters |
|
15 |
|
$- |
|
0 |
|
|
|
Code 601: Non-AMR/AMI Meters (See Acct. No. 370) |
|
34 |
|
$- |
|
0 |
|
|
|
Code 601: Distribution Transformers (See Acct. No. 368) |
|
38 |
|
$- |
|
0 |
|
|
|
Codes 602, 603, 604, 605, 606, 607, & 608: (Total of these 7 Codes) |
|
35 |
|
$- |
|
0 |
|
|
|
Code 615: Communications (All except Fiber) |
|
15 |
|
$- |
|
0 |
|
|
|
Code 615: Communications (Fiber Only) |
|
40 |
|
$- |
|
0 |
|
|
|
All Other Code 600 Items not listed: (Total of Remaining 600 Code Projects not listed) |
|
35 |
|
|
|
0 |
|
|
|
Code 702: Security Lights (See Acct. 373) |
|
25 |
|
$- |
|
0 |
|
|
|
Code 703: General Funds Reimbursement (Budget Purpose 1 - Distribution) |
|
35 |
|
$- |
|
0 |
|
|
|
Code 704: Load Management/SCADA |
|
15 |
|
$- |
|
0 |
|
|
|
Code 705: AMR/AMI Equipment except Meters and Retrofits |
|
15 |
|
$- |
|
0 |
|
|
|
Code 706: Broadband over Power Line (BPL) |
|
15 |
|
$- |
|
0 |
|
|
|
Code 707 (Formerly Code 1501): GIS Hardware and Device Costs |
|
5 |
|
$- |
|
0 |
|
|
|
Code 708 (Formerly Code 1502): GIS Software, Data Migration and Integration Costs |
|
5 |
|
$- |
|
0 |
|
|
|
Code 709 (Formerly Code 1503): Field Inventory & Data Collection Costs less 25% of overall costs |
|
20 |
|
$- |
|
0 |
|
|
|
All Other Code 700 Items not listed: (Total of Remaining 700 Code Projects not listed) |
|
30 |
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose #2: Transmission Facilities (Enter Amounts from 740c) |
|
|
|
|
|
|
|
|
|
Code 800: New Transmission Lines |
|
43 |
|
$- |
|
0 |
|
|
|
Code 900: New Transmission Substations, Step-Down Stations, Switching Stations |
|
37 |
|
$- |
|
0 |
|
|
|
Code 1000: Line and Station Changes |
|
43 |
|
$- |
|
0 |
|
|
|
Code 1103: General Funds Reimbursement (Budget Purpose 2 - Transmission) |
|
35 |
|
$- |
|
0 |
|
|
|
Code 1104: Pole and Associated Hardware Replacement |
|
35 |
|
$- |
|
0 |
|
|
|
All Other Code 1100 Items not listed: (Total of Remaining 1100 Code Projects not listed) |
|
35 |
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose #3: Generation Facilities (Enter Amounts from 740c) |
|
|
|
|
|
|
|
|
|
Code 1200: Generation Facilities (Use Separate Spreadsheet to determine Useful Life) |
|
|
|
$0 |
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose #4: Headquarters Facilities (Enter Amounts from 740c) |
|
|
|
|
|
|
|
|
|
Code 1300: Headquarters Facilities |
|
50 |
|
$0 |
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose #5: Acquisitions (Enter Amount from 740c) |
|
|
|
|
|
|
|
|
|
Code 1400: Acquisitions (Use Separate Spreadsheet to determine Useful Life) |
|
|
|
$0 |
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Purpose #6: All Other (Enter Amounts from 740c) |
|
|
|
|
|
|
|
|
|
Code 1500: All Other (Useful Life to be determined with RUS assistance) |
|
|
|
$0 |
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calculated Useful Life Rounded up to nearest whole number |
|
|
|
0 |
|
0 |
#DIV/0! |
years |
|
|
|
|
|
|
|
|
|
|
|
|
Final Calculated Useful Life With Two Additional Years Added Per 7 CFR Part 1710.115 (b) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
#DIV/0! |
years |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Final Maturity Period utilizing Ninety Percent Test Criteria |
|
|
|
|
|
|
#DIV/0! |
years |
|
Please note either worksheet may be used to. If the shorter (older) version produces a useful life less than 35 years, using the more robust may produce more favorable results albeit more keying of data. |
|
|
|
|
|
|
|
|
|
|
|
|
|
From: Colson, Michelle - RD, Pierre, SD |
|
|
|
|
|
|
Sent: Friday, November 9, 2018 8:54 AM |
|
|
|
|
|
|
To: RD-RUS-Electric-OLOA-Field <RD-RUS-Electric-OLOA-Field@usdagcc.onmicrosoft.com>; Elliott, Jim - RD, Washington, DC <Jim.Elliott@wdc.usda.gov> |
|
|
|
|
|
|
Cc: Solano, Kenneth - RD, Washington, DC <Kenneth.Solano@wdc.usda.gov>; Flanigan, Emily - RD, Washington, DC <Emily.Flanigan@wdc.usda.gov>; Waddell, Colin - RD, Washington, DC <Colin.Waddell@wdc.usda.gov>; Gaby, Devin - RD, Washington, DC <Devin.Gaby@wdc.usda.gov>; Saba, Philip - RD, Washington, DC <Philip.Saba@wdc.usda.gov>; Tuffuo, Ned - RD, Washington, DC <Ned.Tuffuo@wdc.usda.gov>; Roscoe, Timothy - RD, Washington, DC <Timothy.Roscoe@wdc.usda.gov>; Boyette, Ken - RD, Washington, DC <Ken.Boyette@wdc.usda.gov> |
|
|
|
|
|
|
Subject: Useful life certification statement and useful life calculation worksheet clarifications |
|
|
|
|
|
|
|
|
|
|
|
|
|
GFRs and OLOA Engineering Staff, |
|
|
|
|
|
|
As coordinated with and through Ken Solano, please find clarifying information below. |
|
|
|
|
|
|
|
|
|
|
|
|
|
1) If a calculation worksheet is presented with the 740C form in conjunction with a loan, then the useful life certification statement is NOT required. True or False? |
|
|
|
|
|
|
TRUE. In RD Apply the useful life worksheet would be uploaded here: |
|
|
|
|
|
|
in place of the useful life certification statement. |
|
|
|
|
|
|
|
|
|
|
|
|
|
2) The calculation worksheet is required to be presented by the Customer and/or GFR with every loan. True or False? |
|
|
|
|
|
|
FALSE. Either a statement certifying that at least 90 percent of the loan funds are for facilities that have a useful life of 33 years or longer, or a schedule showing the costs and useful life of those facilities with a useful life of less than 33 years. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Definitions/examples attached: |
|
|
|
|
|
|
Useful Life Certification Statement |
|
|
|
|
|
|
|
|
|
|
|
Useful Life Calculation Worksheet (old) |
|
|
|
|
|
|
|
|
|
|
Useful Life Calculation Worksheet (updated) |
|
|
|
|
|
|
|
|
|
|
|
7CFR 1710.501(a)(3)(ii) Useful life of facilities financed by the loan. Form 740c must include, as a note, either a statement certifying that at least 90 percent of the loan funds are for facilities that have a useful life of 33 years or longer, or a schedule showing the costs and useful life of those facilities with a useful life of less than 33 years. This statement or schedule will be used to determine the final maturity of the loan. See §1710.115. |
|
|
|
|
|
|
|
|
|
|
|
|
|
7CFR 1710.115 Final maturity |
|
|
|
|
|
|
(b) Loans made or guaranteed by RUS for facilities owned by the borrower generally must be repaid with interest within a period, up to 35 years, that approximates the expected useful life of the facilities financed. The expected useful life shall be based on the weighted average of the useful lives that the borrower proposes for the facilities financed by the loan, provided that the proposed useful lives are deemed appropriate by RUS. RUS Form 740c, Cost Estimates and Loan Budget for Electric Borrowers, submitted as part of the loan application must include, as a note, either a statement certifying that at least 90 percent of the loan funds are for facilities that have a useful life of 33 years or longer, or a schedule showing the costs and useful life of those facilities with a useful life of less than 33 years. If the useful life determination proposed by the borrower is not deemed appropriate by RUS, RUS will base expected useful life on an independent evaluation, the manufacturer's estimated useful-life or RUS experience with like-property, as applicable. Final maturities for loans for the implementation of programs for demand side management and energy resource conservation and on and off grid renewable energy sources not owned by the borrower will be determined by RUS. Due to the uncertainty of predictions over an extended period of time, RUS may add up to 2 years to the composite average useful life of the facilities in order to determine final maturity. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Thank you, |
|
|
|
|
|
|
Michelle Colson|Supervisory General Field Representative |
|
|
|
|
|
|
Rural Development | Rural Utilities Service | Electric Program |
|
|
|
|
|
|
Cell: 701.629.2585 |
|
|
|
|
|
|
http://www.rd.usda.gov/programs-services/all-programs/electric-programs | "Committed to the future of rural communities" |
|
|
|
|
|
|
USDA is an equal opportunity provider, employer, and lender. |
|
|
|
|
|
|
From: Colson, Michelle - Pierre, SD |
|
Sent: Tuesday, September 14, 2010 10:01 AM |
|
To: Johnson, Aaron - Penfield, IL; Bowers, Dan - Boise, ID; Schlaeppi, Denver - Billings, MT; Doyle, Mark - Cavalier, ND; Marchegiani, Eric - Eagle River, AK; Norman, Mike - Lexington, KY; Bormann, Pat - Bode, IA; Rhein, James - West Norriton, PA; Jensen, Robyn - Prescott, WI; Richardson, Richelle - Spotsylvania, Va; Bohan, Timothy - Bismarck, ND |
|
Cc: Philpott, Charles - Washington, DC; Jenkins, Brian - Washington, DC; Badin, Joe - Washington, DC |
|
Subject: FW: # of miles being reported under the reimbursement to general funds on the 740C Form |
|
|
|
Greetings, |
|
|
|
If you start reading this email from the bottom up, it should make sense as to the content and final advisement of what is to be the proper miles of line being reported on the Form 740C under the reimbursement to general funds. Just thought I'd pass along in case anyone else was interested and to provide apologies to those GFR's who I've provided "training" to since I've been doing it incorrectly since 2006. I am off to update my notes on the 740C now…. |
|
|
|
My apologies- |
|
Michelle Colson|General Field Representative |
|
Rural Development | Rural Utilities Service | Electric Program |
|
PO Box 219|Pierre, SD 57501 |
|
|
|
website: www.usda.gov/rus |
|
|
|
Committed to the future of rural communities |
|
Estamos dedicados al futuro de las comunidades rurales |
|
|
|
|
|
From: Colson, Michelle - Pierre, SD |
|
Sent: Tuesday, September 14, 2010 9:48 AM |
|
To: Philpott, Charles - Washington, DC |
|
Cc: Johnson, Aaron - Penfield, IL; Badin, Joe - Washington, DC; Jenkins, Brian - Washington, DC |
|
Subject: RE: # of miles being reported under the reimbursement to general funds on the 740C Form |
|
|
|
Thank you, Charlie. |
|
|
|
I'll be sending out to all the NRD GFR's so we are all on the same page. |
|
|
|
Michelle Colson| |
|
From: Philpott, Charles - Washington, DC |
|
Sent: Tuesday, September 14, 2010 9:44 AM |
|
To: Colson, Michelle - Pierre, SD |
|
Cc: Johnson, Aaron - Penfield, IL; Badin, Joe - Washington, DC; Jenkins, Brian - Washington, DC |
|
Subject: RE: # of miles being reported under the reimbursement to general funds on the 740C Form |
|
|
|
Michelle, |
|
The new miles of lines associated with the reimbursement of general funds are identified/defined as follows: |
|
|
|
1 |
Miles of line built to connect new customers- Code 100 |
2 |
Miles of line built as tie line-Code 200 |
3 |
Miles of line built as new transmission line-Code 800 |
|
|
Note that these are "new" line miles and not miles of line associated with work done on "existing" line-Code 300 & 1000 or Code 600 series-line replacements. |
|
|
|
Let me know if further information is needed. |
|
Charles |
|
From: Colson, Michelle - Pierre, SD |
|
Sent: Thursday, September 02, 2010 2:32 PM |
|
To: Philpott, Charles - Washington, DC |
|
Subject: # of miles being reported under the reimbursement to general funds on the 740C Form |
|
|
|
Charles, |
|
|
|
In Denver it became apparent that there are a few different "definitions" that GFR's are using to report the # of miles in the reimbursement to general funds on the 740C Form. This was added as a reporting requirement for the GFR's in January of 2006. Please see the email below for the only guidance provided that I can find in my records. |
|
|
|
Please advise me which of the below (or if none, please provide correct information) should be used to populate this information: |
|
|
|
A) For every eligible 219 form shown on the reimbursement to general funds schedule include the gross number of miles built for all 740C Codes. (based on below this would be 24 miles) |
|
Example: WOI shows code 100 with 2 miles of new line to serve 2 new consumers and code 300 with 20 miles of new line replacing 20 miles of old line and Code 200 with 2 miles of new line. |
|
|
|
B) For every eligible 219 form shown on the reimbursement to general funds schedule include the net number of miles built for all 740C Codes. (based on below this would be 4 miles) |
|
Example: WOI shows code 100 with 2 miles of new line to serve 2 new consumers and code 300 with 20 miles of new line replacing 20 miles of old line and Code 200 with 2 miles of new line. |
|
|
|
C) For every eligible 219 form shown on the reimbursement to general funds schedule include the gross number of miles built for Code 100's. (based on below this would be 2 miles) |
|
Example: WOI shows code 100 with 2 miles of new line to serve 2 new consumers and code 300 with 20 miles of new line replacing 20 miles of old line and Code 200 with 2 miles of new line. |
|
|
|
From: Elliott, Jim - Washington, DC |
|
Sent: Wednesday, January 18, 2006 4:23 PM |
|
To: Bohan, Timothy - Bismarck, DC; Johnson, Aaron - Penfield, IL 61862, DC; Richardson, Richelle - Washington, DC; Seaton, Albert - Clear Lake, IA; Um, Won - Ellicott City, DC; McDevitt, William - Columbus, DC; Norman, Mike - Lexington, DC; Colson, Michelle - Pierre, DC; Stanley, Kris - West St. Paul, DC; Schlaeppi, Denver - Billings, DC; Endres, David - Bloomington, DC; Bowers, Dan - Boise, DC |
|
Cc: Jenkins, Brian - Washington, DC; Philpott, Charles - Washington, DC |
|
Subject: New Loan Requirement |
|
Importance: High |
|
In order to track Electric Program performance (required by OMB), we are tracking new connects and new miles of line being added in each loan application. We have not been capturing this information in loans containing reimbursement up to this point (with the exception being 100 percent reimbursement loans). To this end, you will need to include a breakout of new consumer connects as well as miles of line tied to any reimbursement contained in any new loan request as well as submit this information to Engineering for any loans currently in-house. |
|
Let me know if you have any questions. |
|
James F. Elliott |
|
Deputy Director |
|
Northern Regional Division |
|
Michelle Colson|General Field Representative |
|
Rural Development | Rural Utilities Service | Electric Program |
|
PO Box 219|Pierre, SD 57501 |
|
|
|
website: www.usda.gov/rus |
|
|
|
Committed to the future of rural communities |
|
Estamos dedicados al futuro de las comunidades rurales |
|
|
|
INSTRUCTIONS FOR PREPARATION OF RUS FORM 740c |
|
|
|
|
(See 7 CFR 1710, Subpart I, for Additional Information) |
|
|
|
|
If additional space is required for any item, attach continuation sheets as needed. |
|
|
|
|
|
|
|
Prepare an original and one copy of this form for submission to RUS as part of the loan application. |
|
|
|
|
|
|
|
Insert the borrower and loan designation, the date used for preparation of cost estimates, and the number |
|
|
|
of years the application is to cover. |
|
|
|
|
|
|
|
SECTION A. COST ESTIMATES |
|
|
|
|
|
|
|
The borrower should insert cost estimates only in the column titled "Borrower's Cost Estimates." RUS will |
|
|
|
complete the column headed "RUS Use Only" when the borrower's cost estimate varies from RUS's. |
|
|
|
|
|
|
|
Estimates should be obtained from a current construction Work Plan which is in agreement with an approved |
|
|
|
long-range engineering study. |
|
|
|
|
|
|
|
All estimates shown hereon should include material, labor and overhead costs, less any contributions in |
|
|
|
aid of construction (i.e., NET COST). |
|
|
|
|
|
|
|
Where reimbursement of general funds for completed construction is requested, insert the amount under the |
|
|
|
appropriate budget purpose. On a separate sheet, itemize and describe the general fund expenditures to |
|
|
|
be reimbursed, showing applicable budget purpose and amount per item. |
|
|
|
|
|
|
|
1. |
DISTRIBUTION: |
|
|
|
|
|
|
|
a. |
NEW LINE: |
|
|
|
Insert number of consumers, number of miles, and total estimated cost including R/W clearing. |
|
|
|
(Estimates for underground and overhead construction should be shown separately.) Do not duplicate |
|
|
|
costs shown separately in items 1.f. and 1.g. Indicate the number of total new consumers to be |
|
|
|
served and total of new miles to be constructed. (Miles of secondary, services and underbuild |
|
|
|
should be included in the pole line miles shown.) |
|
|
|
|
|
|
b. |
NEW TIE-LINES: |
|
|
|
|
|
|
|
Show location by map reference and substation designation, line voltage (kV), conductor size and |
|
|
|
phasing, miles and estimated cost of each new tie-line. Also show whether the construction is |
|
|
|
overhead or underground. If there is insufficient space to itemize each tie-line, insert the |
|
|
|
total miles and estimated cost and give a description of each tie-line on an attached sheet. |
|
|
|
|
|
|
c. |
CONVERSION AND LINE CHANGES: |
|
|
|
|
|
|
|
Show location by map reference and substation designation, indicate old and new conductor size and |
|
|
|
phasing, miles, and estimated cost. Also show whether the construction is overhead or under- |
|
|
|
ground. If there is insufficient space to itemize each conversion and line change, insert the |
|
|
|
total estimated cost and give a detailed description of each conversion and line change on an |
|
|
|
attached sheet. |
|
|
|
|
|
|
d. |
NEW SUBSTATIONS, SWITCHING STATIONS, METERING POINTS, ETC.: |
|
|
|
|
|
|
|
For each new station, insert the station designation shown in the Construction Work Plan, the kVA |
|
|
|
rating, high and low side voltage classification, and estimated cost. (If procurement of station |
|
|
|
sites is to be financed with loan funds, the cost should be included in the estimate for the |
|
|
|
station.) |
|
e. |
SUBSTATION, SWITCHING STATION AND METERING POINT CHANGES: |
|
|
|
|
|
Identify each station by the designation shown in the Construction Work Plan and describe the |
|
|
changes to be made and the estimated cost. |
|
|
|
|
f. |
MISCELLANEOUS DISTRIBUTION EQUIPMENT: |
|
|
|
|
|
(1) |
Show the number and the total estimated installed cost of all transformers and meters used |
|
|
to serve new and existing consumers in this loan. Furnish separate estimates for under- |
|
|
ground and overhead construction. |
|
|
|
|
(2) |
Insert the number of sets of service wires and estimated cost in this loan application to |
|
|
increase the capacity of existing consumers. |
|
|
|
|
(3) - (5) |
|
|
|
Insert the estimated cost of new sectionalizing equipment, line voltage regulators and |
|
|
capacitors. |
|
|
|
|
(6) |
Insert the net cost of ordinary replacements (installed cost of new facility less original |
|
|
cost of facility being replaced). |
|
|
|
|
(7) - (10) |
|
|
|
Use these lines to show the estimated cost of other distribution equipment not listed above. |
|
|
|
g. |
OTHER DISTRIBUTION ITEMS: |
|
|
|
|
|
(1) |
Insert estimated cost of engineering fees (include details in the Construction Work Plan). |
|
|
Only those engineering costs associated with distribution facilities and not included in the |
|
|
cost estimates for items 1.a. through 1.f. should be included (i.e., long-range plans, |
|
|
sectionalizing studies, etc.). |
|
|
|
|
(2) |
Insert the estimated cost of security lights. |
|
|
|
|
(3) and (4) |
|
|
|
Use these lines to show purpose, type, and estimated cost of other distribution items not |
|
|
listed above. |
|
|
|
TOTAL DISTRIBUTION: Enter the sum of subtotals 1.a. through 1.g. above. |
|
|
|
|
|
2. |
TRANSMISSION: |
|
|
|
|
|
a. |
NEW LINE: |
|
|
|
|
|
For each new line, insert the line designation (i.e., Westover to Shady Grove) as shown in the |
|
|
Construction Work Plan, line voltage (kV), wire size, miles, and total estimated cost including |
|
|
R/W clearing. |
|
|
b. |
NEW SUBSTATIONS, SWITCHING STATIONS, ETC.: |
|
|
|
|
|
|
|
|
|
For each new station, insert the station designation as shown in the Construction Work Plan, kVA |
|
|
|
|
rating, high and low side voltage classification, and estimated cost. (New stations under this |
|
|
|
|
item should not be mistaken for new stations under Item 1 - Distribution. Any station not used |
|
|
|
|
for distribution purposes shall be considered a transmission station, except for the generating |
|
|
|
|
plant step-up substation which should be shown under Item 3.) If procurement of station sites |
|
|
|
|
is to be financed with loan funds, this cost should be included in the estimate for the station. |
|
|
|
|
|
|
|
|
c. |
LINE AND STATION CHANGES: |
|
|
|
|
|
|
|
|
|
For each conversion or line change, insert the line or station designation as shown in the |
|
|
|
|
Construction Work Plan, a description of changes, and the total estimated cost. |
|
|
|
|
|
|
|
|
d. |
OTHER TRANSMISSION ITEMS: |
|
|
|
|
|
|
|
|
|
(1) |
Insert all cost anticipated for the purchase, and/or procurement of transmission line right- |
|
|
|
|
of-way except attorney fees and clearing, which should be shown under Items 6 and 2.a., |
|
|
|
|
respectively. |
|
|
|
|
|
|
|
|
(2) |
Insert the estimated cost of engineering fees (including details in the Construction Work |
|
|
|
|
Plan). Only those engineering costs associated with transmission projects, and not already |
|
|
|
|
included in the line and station cost estimates of item 2.a., b. and c., should be shown |
|
|
|
|
(i.e., environmental reports, system studies, etc.). |
|
|
|
|
|
|
|
|
(3) - (6) |
|
|
|
|
|
Use these lines to show purpose, type, and estimated cost of transmission items not listed |
|
|
|
|
above (i.e., transmission-related communications or control equipment, etc.). |
|
|
|
|
|
TOTAL TRANSMISSION: Enter the sum of subtotals 2.a through 2.d. above. |
|
|
|
|
|
|
|
|
|
3. |
GENERATION (Including step-up station at plant): |
|
|
|
|
|
|
|
|
|
a. |
Insert the kind of fuel to be used in the plant, the nameplate rating (kW), and the total esti- |
|
|
|
|
mated cost. (A detailed breakdown of each proposed generation project should be attached to |
|
|
|
|
this form, indicating the various items for which financing is requested. This breakdown should |
|
|
|
|
be in the form of, or supported by, an engineer's report.) |
|
|
|
|
|
|
|
|
b. |
Use this line to show the estimated cost of generating facilities not included above. |
|
|
|
|
|
|
|
TOTAL GENERATION: Enter the sum of items 3.a. and 3.b. above. |
|
|
|
|
|
|
|
|
|
4. |
HEADQUARTERS FACILITIES |
|
|
|
|
|
|
|
|
|
a. |
NEW OR ADDITIONAL FACILITIES: |
|
|
|
|
|
|
|
|
|
Insert total estimated cost. Complete and attach an original and one copy of RUS Form 740g for |
|
|
|
|
each project. (See instructions on reverse of RUS form 740g.) |
|
|
|
|
|
|
|
|
b. |
Use this line to show the estimated cost of headquarters facilities not included above. |
|
|
|
|
|
|
|
TOTAL HEADQUARTERS FACILITIES: Enter the total of items 4.a. and 4.b. above. |
|
|
|
|
|
|
|
|
|
5. |
ACQUISITIONS: |
|
|
|
|
|
|
|
|
|
a. |
Insert the number of consumers, miles or line to be acquired, and the total cost of the proposed |
|
|
|
|
acquisition. On a separate sheet, itemize: (1) the approximate purchase price of the acquisition; |
|
|
|
|
(Give breakdown and apportioned purchase price of distribution, transmission and/or generating |
|
|
|
|
plant facilities.) (2) a description and estimated costs of rehabilitation and integration; |
|
|
|
|
(3) Engineering fees. |
|
|
|
|
|
|
|
|
b. |
Use this line to show the kinds and estimated cost of facilities to be acquired not included |
|
|
|
|
above. |
|
|
TOTAL ACQUISITIONS: Enter the total of items 5.a. and 5.b. above. |
|
|
|
|
|
|
|
6. |
ALL OTHER: |
|
|
|
a. - e. |
|
|
|
|
These lines are to be used for costs not listed above, such as legal fees, general plant equip- |
|
|
|
ment, etc. (Funds for general plant equipment generally will only be approved in initial loans.) |
|
|
|
All requests for funds under this budget purpose should be accompanied by a breakdown and |
|
|
|
justification for the requested funds. |
|
|
|
|
|
TOTAL ALL OTHER: Enter the sum of items 6.a. through 6.d. above. |
|
|
|
|
|
|
|
SECTION B. SUMMARY OF AMOUNTS AND SOURCES OF FINANCING |
|
|
|
|
|
|
|
Note: Items 1 and 3 below may require adjustment before entering in final form (see "ADJUSTMENT" below). |
|
|
|
|
All other items may be entered in final form. |
|
|
|
|
|
|
1. |
GRAND TOTAL - ALL COSTS: |
|
|
|
|
|
|
|
Insert the total of Budget Purposes 1 through 6 above. |
|
|
|
|
|
|
2. |
FUNDS AND MATERIALS AVAILABLE FOR FACILITIES: |
|
|
|
|
|
|
|
a. |
LOAN FUNDS: |
|
|
|
|
|
|
|
Insert the total amount of funds available from prior loans, as of the "Cut-Off" date, which are |
|
|
|
not required for original loan purposes. Attach RUS Form 602 and an explanation if necessary. |
|
|
|
|
|
|
b. |
MATERIALS AND SPECIAL EQUIPMENT: |
|
|
|
|
|
|
|
Insert the dollar value of materials and special equipment on hand which will be used for the |
|
|
|
proposed construction. Attach information identifying, by budget purpose, the kinds of materials |
|
|
|
or special equipment being applied to this loan and their dollar value. Do not include materials |
|
|
|
and special equipment needed for normal operation of the system. |
|
|
|
|
|
|
c. |
GENERAL FUNDS: |
|
|
|
|
|
|
|
Insert the total amount of general funds available for construction of the facilities listed |
|
|
|
(i.e., general funds now available plus general funds to become available during the loan period.) |
|
|
|
For existing general funds, attach a statement indicating the need for any adjusted general funds |
|
|
|
in excess of RUS guidelines which will not be used for the proposed |
|
|
|
construction (attach RUS Form 740a). |
|
|
|
|
|
|
d. |
TOTAL AVAILABLE FUNDS FOR FACILITIES: |
|
|
|
|
|
|
|
Insert the total of Items 2.a., b. and c. of this section and enter as Item 2.d. |
|
|
|
|
|
3. |
NEW FINANCING REQUESTED FOR FACILITIES: |
|
|
|
|
|
|
|
Subtract Item 2.d. from Item 1 and enter as Item 3. |
|
|
|
|
|
|
4. |
RUS LOAN REQUESTED FOR FACILITIES: |
|
|
|
|
|
|
|
Insert the percentage of plant financing to be obtained from RUS (see 7 CFR 1710.110). Multiply |
|
|
|
Item 3 by the decimal equivalent of this percentage; round to the nearest thousand and enter as |
|
|
|
Item 4. |
|
|
|
|
|
|
5. |
TOTAL SUPPLEMENTAL LOAN REQUESTED: |
|
|
|
|
|
|
|
Insert the percentage of plant financing to be obtained from a supplemental lender and the lender's |
|
|
|
corporate name. Multiply Item 3 by the decimal equivalent of this percentage and round to the |
|
|
|
nearest thousand. |
|
|
|
|
Note: |
Where CFC is the supplemental lender, the result of the above calculation should be divided |
|
|
|
by 0.95 before rounding to the nearest thousand. |
|
|
|
|
6. |
CAPITAL TERM CERTIFICATE PURCHASES (CFC LOANS ONLY): |
|
|
|
|
|
|
|
Multiply Item 5 by 0.05 and enter as Item 6. For loans made by supplemental lenders other than CFC, |
|
|
|
enter zero. |
|
|
|
|
|
|
7. |
SUPPLEMENTAL LOAN REQUESTED FOR FACILITIES: |
|
|
|
|
|
|
|
Subtract Item 6 from Item 5 and enter as Item 7. |
|
|
|
|
|
|
ADJUSTMENT: |
|
|
After the above calculations have been completed, adjust Item 3 such that it equals Item 4 |
|
|
|
plus Item 7. Next adjust Item 1 and a cost estimate in Section A such that Item 2 plus |
|
|
|
Item 3 equals Item 1. |
|
|
|
|
SECTION C. CERTIFICATION |
|
|
|
|
|
|
|
Manager and board president must sign and date form (original and one copy). Insert borrower's corporate |
|
|
|
name. |
|
|
|