Section 319 Nonpoint Source Program

General Performance Reporting for Assistance Programs (NEW)

Section 319_Interim and Final Performance Reports_July 2024

Section 319 Nonpoint Source Program

OMB:

Document [pdf]
Download: pdf | pdf
Section 319 Grants - Grants Reporting and Tracking System.
Table of Contents

Page Content
1
User interface home page
2
State and Territory 319 project screenshot (data is fictional and does not relate to any actual projects)
6
State and Territory Terms and Conditions for reporting
7
Tribal 319 projects
12
Tribal Terms and Conditions
NNotes:
• The Grants Reporting and Tracking System (GRTS) is regularly being improved to
streamline data entry and access.for all grantees: The database is used to capture annual
progress, status updates or attachments are added incrementally to the project each year.
• The final report is added as an attachment (see page 4).
• Tribal 319 projects are a subset of reporting elements that states and territories complete.

Grants Reporting and Tracking system home page: ( the home page is for 319 grants and success
stories)
Burden Statement block added here - above GRTS announcements ( see full text below)

Text that will be added in text box above: This collec�on of informa�on is approved by OMB
under the Paperwork Reduc�on Act, 44 U.S.C. 3501 et seq. OMB Control Number: 2090NEW. Responses to this collec�on of informa�on are mandatory [2 CFR Part 200]. An agency
may not conduct or sponsor, and a person is not required to respond to, a collec�on of
informa�on unless it displays a currently valid OMB control number. The public repor�ng
and recordkeeping burden for this collec�on of informa�on is es�mated to be 8-16 hours
per response. Send comments on the Agency’s need for this informa�on, the accuracy of the
provided burden es�mates and any suggested methods for minimizing respondent burden
to Director, Informa�on Engagement Division; U.S. Environmental Protec�on Agency
(2821T); 1200 Pennsylvania Ave., NW; Washington, D.C. 20460. Include the OMB control
number in any correspondence. Do not send the completed form to this address.

Screen shot of user interface for each project in a grant
( see full list of ques�ons on the “project print” below)

Botom of the project entry form - see placeholder OMB control language below.

OMB Control Number = 2090.NEW, Expira�on Date = mm/dd/yyyy.

Test project example with all questions below, Questions with a red asterisk*
are required, all the rest are optional

4/9/24, 2:21 PM

Project Print

Project Information
Region: 07

Grant #: 00740721

State: MO

Appropriation Year: 2015

Project #: 16

General Information 
   50/50 Funding Split: Watershed Project Funds
   Project Title: TEST ttttttttttttttt now marked parent. add a word
State Project Number: 45
This Project Does Not Have a
Subgrantee

   Subgrantee(s):
   Description: This project is being used to test the enhancements to the GRTS application.
   Statewide: Y

   This Project Will / Did Y
Result in Pollutant
Load Reductions:

Project Manager:

Phone:

State Project Manager:

Phone:

   Status of TMDL for
Waterbody/Watershed:
   51% or More of Y
Project Budget Used to
Protect Unimpaired / High
Quality Waterbodies:

Budget 
Grant Summary
Total 319 Grant Funds:
$0

Total 319(h) Funds for all
Projects:

- $1,738,072

Grant Funds Remaining:

 =  -$1,738,072

Project Budget 
Appropriation Year: 2015
   Project budget includes 3
   319(h) Federal Funds: $0
   EPA Other: $0
   Other Federal: $0
   State Funds: $0
   State In-Kind: $0
   Local Funds: $0
   Local In-Kind: $0
   Other Funds: $0
Total Budget: $0
Comments:

Work Categories 
Category of Work

Primary

319(h) National Monitoring Project Y
NPS State Staff Activities

N

Quality Assurance Project Plan
Does the Project require a Quality Assurance Project Plan

Yes

No

NPS Staffing 

https://grts.epa.gov/ords/grts/f?p=109:195:13882876971044:::195:P195_PRJ_ID:108021&cs=17RD5zrc4bNRMJcPD5ATyPdbtl7s&p_dialog_cs=PoC…

1/3

4/9/24, 2:21 PM

Project Print

Please describe the type of NPS staffing. NPS staffing percentage totaling 100% is required.

Sources of NPS Pollution 
Category Type

Secondary

Percent (%)

Construction

Land Development or Redevelopment

Agriculture

Grazing-Related Sources

10
70
80

Key Partners
Organization Type

Partner Name

Partner Contribution

Description of Role/Notes

<> SOIL HEALTH ACADEMY
County/Municipal Agencies CITY OF MARYVILLE

$0
$0

Related Projects
No Related Projects found.

Attachments
Attachment Name

File Size

Document Type

Goofy file two.docx

11.8KB

[Other]

Goofy file.docx

11.8KB

[Other]

Pretend final report - Copy.docx

11.8KB

Final Report (Closeout)

Pretend final report.docx

11.8KB

Final Report (Closeout)

State_GWS84.shp

0.3KB

Final Report (Closeout)

State_GWS84.prj

0.1KB

[Other]

Correspondence pretend.docx

11.8KB

Final Report (Closeout)

Pretend WBP as final product.docx 11.8KB

[Other]

Project Workplan test.docx

11.8KB

Work Plan

PIP 1.docx

75.1KB

[Other]

Final report attached here.

Planning
Watershed Plans 
Status

Plan Name

Attachment

Implementing a Watershed Based Plan Lake of the Ozarks Watershed Management Plan Developing a Watershed Based Plan

this is the pretend name

Pretend WBP.docx

Project Status
Status Type

Current Status

Status Date

Comment

Editor

Edited Date

Current

On Schedule

03/08/2024

-

HVALLE

03/06/2024

History

Pending

03/06/2024

-

HVALLE

03/06/2024

History

Never Initiated

02/13/2024

-

JBLOUNT 02/13/2024

History

Ahead of Schedule 02/02/2002

from joebu account

JOEBU

History

Behind Schedule

01/01/2001

overwrite ? instead of new JBLOUNT 01/08/2024

History

Pending

01/08/2024

amnt

JBLOUNT 01/08/2024

History

Completed

01/04/2024

-

HVALLE

01/04/2024

History

Behind Schedule

-

-

HVALLE

12/28/2023

History

Never Initiated

08/08/2008

old dash not showing.

JBLOUNT 12/27/2023

01/08/2024

Schedule 
Project Start 09/03/2020
Date:

Project End Date: 09/08/2033
Comments: schedule comments go here

https://grts.epa.gov/ords/grts/f?p=109:195:13882876971044:::195:P195_PRJ_ID:108021&cs=17RD5zrc4bNRMJcPD5ATyPdbtl7s&p_dialog_cs=PoC…

2/3

4/9/24, 2:21 PM

Project Print

Waterbody Information
No Waterbodies found.

Pollutants to be Addressed
Pollutant

Load Reduction Goal
(Numeric, Total for ENTIRE Project)



Units
TONS/YR

Sedimentation-Siltation
Phosphorus

12 LBS/YR
1-2

Planned Activities
BMP Type



Quantity Planned

Contour Farming

Units of Measure

14 AC

Critical Area Planting

AC

Denitrifying Bioreactor

N/A

Tasks
No Tasks found.

Project Evaluations
Evaluation

Evaluation Type

filler eval

Final Product

Reporting From

Reporting To

-

-

Creation Date
12/27/2023

Attachments
Final product pretend in eval332.docx

Environmental Results
Drainage Areas 
Drainage number

Drainage area

1

Stick Branch-Pomme de Terre Lake (102901070205) -

Bmps

Pollutants
-

Drainage Area Pollutants 

Best Management Practices 

Ecoregions
Ecoregion
Ozark Highlands

Counties
County Name

State

HICKORY

MO

POLK

MO

STATEWIDE

-

OMB Control Number = 2090.NEW, Expira�on Date = mm/dd/yyyy.

https://grts.epa.gov/ords/grts/f?p=109:195:13882876971044:::195:P195_PRJ_ID:108021&cs=17RD5zrc4bNRMJcPD5ATyPdbtl7s&p_dialog_cs=PoC…

3/3

Grant Terms and Conditions excerpt describes reporting expectations,
A.1. Project Reports
The recipient agrees to submit reports for all projects identified in the approved work plan,
including those performed by the recipient, subgrantees, contractors, and through interagency
agreements. Reports shall include a comparison of actual accomplishments to the
outputs/outcomes established in the work plan for that period, the reasons for slippage if those
outputs/outcomes could not be met, and any other pertinent information, such as cost
overruns. Reports are due annually/semiannually on insert date each year until the grant is
closed. Reports should be submitted in GRTS. In accordance with 2 CFR 200.329, the recipient
agrees to inform the EPA as soon as problems, delays, or adverse conditions arise that will
materially impair the ability to meet the outputs/outcomes specified in the assistance
agreement work plan. In addition, reports should include three essential elements:
•
•
•

Strategic Plan Goal 5.0,
Strategic Plan Objective 5.2, and
Work plan commitments, plus a timeframe.

A final project report is due to the EPA project officer within 120 days after the end of the
Assistance Agreement Project Period. The report must describe project activities and identify
and discuss the extent to which project goals have been achieved and the amount of funds
spent on the project. The report should emphasize successes, failures, lessons learned, and load
reduction data, and it should include any available water quality and habitat data demonstrating
project results. Acceptance and approval of final project reports is the responsibility of the
recipient. Final project reports will be provided electronically as attachments in GRTS and
submitted in hard copy if required. In addition, the GRTS database should be updated to reflect
the project status as complete.
A.2. Annual Nonpoint Source Program Report
The recipient agrees to provide information required under Section 319(h)(11)(B) for the
purpose of annual reporting on progress under the state’s NPSMP. The Section 319 Annual
Program Report will be due by insert date. At a minimum, the report shall contain a summary of
progress, including rationale/evidence, in meeting the schedule of milestones in the approved
management program and reductions in NPS pollutant loading and improvements in water
quality that have resulted from implementing the NPSMP. Failure to submit the annual NPSMP
report may affect the recipient’s eligibility for future Section 319 grant funding.
A.3. Grants Reporting and Tracking System
The recipient shall enter all mandated data elements into GRTS for NPS projects funded under
Section 319 of the CWA and any other data and/or information required by the EPA or according
to deadlines specified by the EPA.
Initial data entry is due 90 days from the award and includes all mandated data elements except
the geographic area (if still to be determined), BMPs, and load reduction data. The recipient will
report BMP and load reduction data as projects are implemented. At a minimum, the BMP and
load reduction data will be reported by March 31 of each year for projects implementing BMPs
in the previous federal fiscal year.

4/12/24, 11:52 AM

Tribal Project - Project Information w/ Drainage Areas

Sample
Tribal GRTS
Entry Screen - red Asterisk is required
elements
 indicates
mandated element.    
EPA Home / GRTS Home / Tribal
Grants /of
00A00924
/
SectionGrants
View: &AllProjects
Tools
Reports
Help
My Account
Admin
Grants Reporting and Tracking System (GRTS)
Tribal Project 01 / Project
Tribal Project



Mandated Elements Check

Logo

Help

Project Information

Grant #:

Region:

Grantee:

01

Appropriation Year:

DUNS#:

2022

Project #:

01

General Information 



   Project Title:

Hydromodification/channel restoration test

   Short Project
Description:

sample text

   Waterbody Name(s):

   Watershed Name(s):

test rive

HUC12(s)

-Select one or more HUC12s-

test river

https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk

1/5

4/12/24, 11:52 AM

Tribal Project - Project Information w/ Drainage Areas
NOTE: Hold down [CTRL] button to select multiple HUC12s

Yes
No
   Watershed-based
Grants Reporting
and Tracking
System
(GRTS)
plan development a part
of this project?:

Tribal Project



Mandated Elements Check

Logo

Help
Contact
Email:

Tribe Project Contact:

Sources of NPS Pollution 
View/Hide Secondary Sources 

Add Source



Add Pollutants to be Addressed



Add Management Measures



Delete Selected

Category Type

Secondary

Hydromodification

Flow Regulations/Modification

Total

Pollutants to be Addressed 

Data entered here reflects POLLUTION REDUCTION GOALS for the project
Edit All Data/Add LR Goals

Pollutant



Alteration (Flow)

Delete Selected
Load Reduction Goal
(Numeric, Total for ENTIRE Project)

Units
<>
1-1

Management Measures 
https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk

2/5

4/12/24, 11:52 AM

Tribal Project - Project Information w/ Drainage Areas

Grants
ReportingView
andDefinitions
Tracking System (GRTS)
Delete Selected
Tribal Project





Mandated Elements Check

Help

Go

Logo

Actions

Edit

BMP Type

Stream Channel Restoration (Stream Bed/Habitat)

Numb
100

INDIVIDUAL UNITS
1-1

Anticipated
Outputs :

f

Anticipated
Outcomes :

Budget 



Project Budget 
Appropriation Year:
   319(h) Competitive Grant Funds:
Other EPA Grant Funds:

$

https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk

3/5

4/12/24, 11:52 AM

Tribal Project - Project Information w/ Drainage Areas

Other
Federal:
$0
Grants Reporting and
Tracking
System (GRTS)

Tribal Project

319(h) Match
Funds: Check
TribalMandated
Elements

Help

Logo

$0

Tribal In-Kind:

$0

Other Tribal Funds:

$0

Local Funds:

$0

Total Budget:

$99,342

Comments:

Project Partners
Edit All Data

Add Project Partner



Add Attachment



Delete Selected

No Key Partners found.

Attachments
Delete Selected

Download All Attachments

https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk

4/5

4/12/24, 11:52 AM

Tribal Project - Project Information w/ Drainage Areas

Grants
Reporting
No Attachments
found. and Tracking System (GRTS)
Tribal Project



Mandated Elements Check

Logo

Help

Drainage Areas 

View/Add Drainage Areas



Delete Selected



Go

Actions


No Drainage Areas found.

3.0 Set Screen Reader Mode On

https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk

5/5

Tribal Term and Condition Excerpt
GRTS Project Information Applicants selected for award under this announcement will be responsible
for providing the EPA with project information due 90 days from award, which will be entered into
the EPA’s CWA §319 Grants Reporting and Tracking System (GRTS). Required project information
includes a project description, NPS categories of pollution and pollutants to be addressed, proposed
BMPs, anticipated environmental outputs and outcomes, project location, project budget
information, and project partners contributing to project implementation.

Type text here


File Typeapplication/pdf
AuthorCurtis, Cynthia (she/her/hers)
File Modified2024-05-29
File Created2024-04-12

© 2024 OMB.report | Privacy Policy