OMB No. 1093-0012 Expires: XX/XX/XXXX Category or Subcategory |
Criteria 1 Plugging standards and procedures in effect when the State submits its application, even if they were also in effect prior to the 10-Year Application Period (YES / NO) (Up to 94 points) |
Criteria 2 Improvements to plugging standards and procedures that the State made during the 10-Year Application Period (YES or NO) (Up to 160 points) |
State or Agency Submitting Scoresheet | State | |||||||||||||||||||||||
Point of Contact | First Last phone |
||||||||||||||||||||||||||
Category 1: Drilling well construction | Select | ||||||||||||||||||||||||||
A. Logging and reporting | YES | YES | Total Plugging Standards RIG Eligibility | $20,000,000 | YES | ||||||||||||||||||||||
B. Casing centralization | YES | NO | NO | ||||||||||||||||||||||||
C. Minimum cementing | YES | YES | Score below a total of 95 points | No Award Amount Eligiblity | |||||||||||||||||||||||
Score at or above 95 points, but less than 127 points | Partial Award Amount Eligibility | ||||||||||||||||||||||||||
Category 2: Well control equipment | Score at or above 127 points | Full Grant Award Amount Eligibility | |||||||||||||||||||||||||
Well control equipment | YES | YES | |||||||||||||||||||||||||
Total Points Available | 254 | ||||||||||||||||||||||||||
Category 3: Barrier types | Total Points Earned from Criteria 1 | 50 | |||||||||||||||||||||||||
A. Cement | YES | YES | Total Points Earned from Criteria 2 | 80 | |||||||||||||||||||||||
B. Sealants other than cement | YES | YES | Total Points Earned | 130 | |||||||||||||||||||||||
C. Bridge plugs | YES | YES | % of Total Available Points Earned | 51.1% | |||||||||||||||||||||||
D. Cement retainers | YES | YES | |||||||||||||||||||||||||
E. Packer | YES | NO | |||||||||||||||||||||||||
Category 4: Barrier placement locations | |||||||||||||||||||||||||||
Uncased Hole | |||||||||||||||||||||||||||
A. Open-hole sections of the wellbore | YES | YES | 3 | 3 | |||||||||||||||||||||||
B. Hydrocarbon bearing, injection, or disposal zones | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
C. Potential cross flow zones | YES | YES | 5 | 1 | 1 | ||||||||||||||||||||||
D. Lost circulation zones | YES | YES | 2 | 1 | 1 | ||||||||||||||||||||||
E. Protected water zones or other geological zones (e.g., coal seams, salt caverns) | YES | YES | 2 | 3 | 3 | ||||||||||||||||||||||
F. At the surface (uncased hole) | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
5 | |||||||||||||||||||||||||||
Cased Hole | |||||||||||||||||||||||||||
G. Perforated or producing, injection or disposal casing intervals | YES | YES | 3 | 3 | |||||||||||||||||||||||
H. Known holes or casing integrity | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
I. Removed casing locations | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
J. Casing shoe locations | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
K. Liner tops | YES | YES | 5 | 1 | 1 | ||||||||||||||||||||||
L. Open uncemented annulus outside casing | YES | NO | 2 | 3 | 3 | ||||||||||||||||||||||
M. At the surface (cased hole) | NO | NO | 5 | 0 | 3 | ||||||||||||||||||||||
5 | |||||||||||||||||||||||||||
Horizontal | |||||||||||||||||||||||||||
N. Barrier type or location | NO | NO | 0 | 3 | |||||||||||||||||||||||
O. Casing or liner hanger and shoes | NO | NO | 5 | 0 | 1 | ||||||||||||||||||||||
2 | |||||||||||||||||||||||||||
Category 5: Barrier placement techniques | |||||||||||||||||||||||||||
A. Balanced technique | NO | NO | 0 | 2 | |||||||||||||||||||||||
B. Cement retainer technique | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
C. Dump bailer technique | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
D. Squeeze cement technique | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
3 | |||||||||||||||||||||||||||
Category 6: Wellbore and barrier integrity and verification | |||||||||||||||||||||||||||
A. Casing pressure test | NO | NO | 0 | 2 | |||||||||||||||||||||||
B. Barrier verification | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
3 | |||||||||||||||||||||||||||
Category 7: Spacer between barriers | |||||||||||||||||||||||||||
Spacer between barriers requirements | NO | NO | 0 | 2 | |||||||||||||||||||||||
3 | |||||||||||||||||||||||||||
Category 8: Wellbore Capping | |||||||||||||||||||||||||||
A. Below ground marker | YES | YES | 1 | 1 | |||||||||||||||||||||||
B. Above ground marker | YES | YES | 2 | 1 | 1 | ||||||||||||||||||||||
C. Marker installation timing | NO | NO | 2 | 0 | 1 | ||||||||||||||||||||||
2 | |||||||||||||||||||||||||||
Category 9: Pre-approval, procedure changes, post-reporting | |||||||||||||||||||||||||||
A. Plugging procedure approval requirements | NO | NO | 0 | 3 | |||||||||||||||||||||||
B. Plugging procedure changes for previously approved procedures | NO | NO | 5 | 0 | 3 | ||||||||||||||||||||||
C. Plugging operations notification requirements | NO | NO | 5 | 0 | 2 | ||||||||||||||||||||||
D. Post-plugging reporting requirements | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
E. Established criteria or process to address alternative material or methods not meeting the prescriptive requirements outlined in the regulations | NO | YES | 4 | 0 | 2 | ||||||||||||||||||||||
4 | |||||||||||||||||||||||||||
Category 10: State plugging inspection, oversight, and long-term monitoring | |||||||||||||||||||||||||||
A. State inspector certification | NO | NO | 0 | 2 | |||||||||||||||||||||||
B. Contractor approval/certification | NO | NO | 4 | 0 | 2 | ||||||||||||||||||||||
C. Inspection, witnessing, monitoring, and documentation | NO | NO | 4 | 0 | 3 | ||||||||||||||||||||||
D. Plugged well certification | NO | NO | 5 | 0 | 1 | ||||||||||||||||||||||
E. Long-term monitoring | NO | NO | 2 | 0 | 2 | ||||||||||||||||||||||
4 | 32 | 76 | |||||||||||||||||||||||||
130 |
PAPERWORK REDUCTION ACT STATEMENT: An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number and expiration date. The OMB control number for this template is 1093-0012 (expiration date: XX/XX/XXXX). |
BURDEN ESTIMATE STATEMENT: Public reporting for this form is estimated to average 24 hours per response. Please direct comments regarding the burden estimate or any other aspect of this information collection to: U.S. Department of the Interior Information Collection Clearance Officer, 1849 C St., N.W., Washington, DC 20240. |
s |
File Type | application/octet-stream |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |