| OMB No. 1093-0012 Expires: XX/XX/XXXX Category or Subcategory |
Criteria 1 Plugging standards and procedures in effect when the State submits its application, even if they were also in effect prior to the 10-Year Application Period (YES / NO) (Up to 94 points) |
Criteria 2 Improvements to plugging standards and procedures that the State made during the 10-Year Application Period (YES or NO) (Up to 160 points) |
State or Agency Submitting Scoresheet | State | |||||||||||||||||||||||
| Point of Contact | First Last phone |
||||||||||||||||||||||||||
| Category 1: Drilling well construction | Select | ||||||||||||||||||||||||||
| A. Logging and reporting | YES | YES | Total Plugging Standards RIG Eligibility | $20,000,000 | YES | ||||||||||||||||||||||
| B. Casing centralization | YES | NO | NO | ||||||||||||||||||||||||
| C. Minimum cementing | YES | YES | Score below a total of 95 points | No Award Amount Eligiblity | |||||||||||||||||||||||
| Score at or above 95 points, but less than 127 points | Partial Award Amount Eligibility | ||||||||||||||||||||||||||
| Category 2: Well control equipment | Score at or above 127 points | Full Grant Award Amount Eligibility | |||||||||||||||||||||||||
| Well control equipment | YES | YES | |||||||||||||||||||||||||
| Total Points Available | 254 | ||||||||||||||||||||||||||
| Category 3: Barrier types | Total Points Earned from Criteria 1 | 50 | |||||||||||||||||||||||||
| A. Cement | YES | YES | Total Points Earned from Criteria 2 | 80 | |||||||||||||||||||||||
| B. Sealants other than cement | YES | YES | Total Points Earned | 130 | |||||||||||||||||||||||
| C. Bridge plugs | YES | YES | % of Total Available Points Earned | 51.1% | |||||||||||||||||||||||
| D. Cement retainers | YES | YES | |||||||||||||||||||||||||
| E. Packer | YES | NO | |||||||||||||||||||||||||
| Category 4: Barrier placement locations | |||||||||||||||||||||||||||
| Uncased Hole | |||||||||||||||||||||||||||
| A. Open-hole sections of the wellbore | YES | YES | 3 | 3 | |||||||||||||||||||||||
| B. Hydrocarbon bearing, injection, or disposal zones | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
| C. Potential cross flow zones | YES | YES | 5 | 1 | 1 | ||||||||||||||||||||||
| D. Lost circulation zones | YES | YES | 2 | 1 | 1 | ||||||||||||||||||||||
| E. Protected water zones or other geological zones (e.g., coal seams, salt caverns) | YES | YES | 2 | 3 | 3 | ||||||||||||||||||||||
| F. At the surface (uncased hole) | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
| 5 | |||||||||||||||||||||||||||
| Cased Hole | |||||||||||||||||||||||||||
| G. Perforated or producing, injection or disposal casing intervals | YES | YES | 3 | 3 | |||||||||||||||||||||||
| H. Known holes or casing integrity | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
| I. Removed casing locations | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
| J. Casing shoe locations | YES | YES | 5 | 3 | 3 | ||||||||||||||||||||||
| K. Liner tops | YES | YES | 5 | 1 | 1 | ||||||||||||||||||||||
| L. Open uncemented annulus outside casing | YES | NO | 2 | 3 | 3 | ||||||||||||||||||||||
| M. At the surface (cased hole) | NO | NO | 5 | 0 | 3 | ||||||||||||||||||||||
| 5 | |||||||||||||||||||||||||||
| Horizontal | |||||||||||||||||||||||||||
| N. Barrier type or location | NO | NO | 0 | 3 | |||||||||||||||||||||||
| O. Casing or liner hanger and shoes | NO | NO | 5 | 0 | 1 | ||||||||||||||||||||||
| 2 | |||||||||||||||||||||||||||
| Category 5: Barrier placement techniques | |||||||||||||||||||||||||||
| A. Balanced technique | NO | NO | 0 | 2 | |||||||||||||||||||||||
| B. Cement retainer technique | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
| C. Dump bailer technique | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
| D. Squeeze cement technique | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
| 3 | |||||||||||||||||||||||||||
| Category 6: Wellbore and barrier integrity and verification | |||||||||||||||||||||||||||
| A. Casing pressure test | NO | NO | 0 | 2 | |||||||||||||||||||||||
| B. Barrier verification | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
| 3 | |||||||||||||||||||||||||||
| Category 7: Spacer between barriers | |||||||||||||||||||||||||||
| Spacer between barriers requirements | NO | NO | 0 | 2 | |||||||||||||||||||||||
| 3 | |||||||||||||||||||||||||||
| Category 8: Wellbore Capping | |||||||||||||||||||||||||||
| A. Below ground marker | YES | YES | 1 | 1 | |||||||||||||||||||||||
| B. Above ground marker | YES | YES | 2 | 1 | 1 | ||||||||||||||||||||||
| C. Marker installation timing | NO | NO | 2 | 0 | 1 | ||||||||||||||||||||||
| 2 | |||||||||||||||||||||||||||
| Category 9: Pre-approval, procedure changes, post-reporting | |||||||||||||||||||||||||||
| A. Plugging procedure approval requirements | NO | NO | 0 | 3 | |||||||||||||||||||||||
| B. Plugging procedure changes for previously approved procedures | NO | NO | 5 | 0 | 3 | ||||||||||||||||||||||
| C. Plugging operations notification requirements | NO | NO | 5 | 0 | 2 | ||||||||||||||||||||||
| D. Post-plugging reporting requirements | NO | NO | 3 | 0 | 2 | ||||||||||||||||||||||
| E. Established criteria or process to address alternative material or methods not meeting the prescriptive requirements outlined in the regulations | NO | YES | 4 | 0 | 2 | ||||||||||||||||||||||
| 4 | |||||||||||||||||||||||||||
| Category 10: State plugging inspection, oversight, and long-term monitoring | |||||||||||||||||||||||||||
| A. State inspector certification | NO | NO | 0 | 2 | |||||||||||||||||||||||
| B. Contractor approval/certification | NO | NO | 4 | 0 | 2 | ||||||||||||||||||||||
| C. Inspection, witnessing, monitoring, and documentation | NO | NO | 4 | 0 | 3 | ||||||||||||||||||||||
| D. Plugged well certification | NO | NO | 5 | 0 | 1 | ||||||||||||||||||||||
| E. Long-term monitoring | NO | NO | 2 | 0 | 2 | ||||||||||||||||||||||
| 4 | 32 | 76 | |||||||||||||||||||||||||
| 130 | |||||||||||||||||||||||||||
| PAPERWORK REDUCTION ACT STATEMENT: An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number and expiration date. The OMB control number for this template is 1093-0012 (expiration date: XX/XX/XXXX). |
| BURDEN ESTIMATE STATEMENT: Public reporting for this form is estimated to average 24 hours per response. Please direct comments regarding the burden estimate or any other aspect of this information collection to: U.S. Department of the Interior Information Collection Clearance Officer, 1849 C St., N.W., Washington, DC 20240. |
| s |
| File Type | application/octet-stream |
| File Modified | 0000-00-00 |
| File Created | 0000-00-00 |