UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
[Docket No. IC24-11-000]
COMMISSION INFORMATION COLLECTION ACTIVITIES (FERC-576);
COMMENT REQUEST; EXTENSION
(February 26, 2024)
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
SUMMARY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC-576 (Report of Service Interruptions or Damage to Facilities) (OMB Control Number 1902-0004).
DATES: Comments on the collections of information are due [INSERT DATE 60 days after date of publication in the Federal Register].
ADDRESSES: You may submit copies of your comments (identified by Docket No. IC24-11-000 and the specific FERC collection number (FERC-576)) by one of the following methods:
Electronic filing through http://www.ferc.gov, is preferred.
Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format.
For those unable to file electronically, comments may be filed by USPS mail or by other delivery services:
Mail via U.S. Postal Service Only: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street, N.E., Washington, DC 20426.
All other delivery services: Federal Energy Regulatory Commission, Secretary of the Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov. For user assistance, contact FERC Online Support by e-mail at ferconlinesupport@ferc.gov, or by phone at (866) 208-3676 (toll-free).
Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov.
FOR FURTHER INFORMATION: Jean Sonneman may be reached by e-mail at DataClearance@FERC.gov, telephone at (202) 502-6362.
SUPPLEMENTARY INFORMATION:
Title: FERC–576, Report of Service Interruptions or Damage to Facilities.
OMB Control No.: 1902-0004.
Type of Request: Three-year extension of the FERC-576 information collection requirements with no changes to the current reporting requirements.
Abstract: Per 18 CFR 260.9, natural gas pipeline companies must report (i) damage to any jurisdictional natural gas facilities other than liquefied natural gas facilities caused by a hurricane, earthquake or other natural disaster or terrorist activity that results in a loss of or reduction in pipeline throughput or storage deliverability; and (ii) serious interruptions of service to any shipper involving jurisdictional natural gas facilities other than liquefied natural gas facilities.
The notifications, made to the Director, Division of Pipeline Certificates via email or fax as soon as feasibly possible, must state: (1) The location of the service interruption or damage to natural gas pipeline or storage facilities; (2) The nature of any damage to pipeline or storage facilities; (3) Specific identification of the facilities damaged; (4) The time the service interruption or damage to the facilities occurred; (5) The customers affected by the service interruption or damage to the facilities; (6) Emergency actions taken to maintain service; and (7) Company contact and telephone number. The information provided by these notifications are kept by the Commission and are not made part of the public record.
In addition, if the Department of Transportation requires an incident report1 under the Natural Gas Pipeline Safety Act (49 U.S.C. 60101 through 60143), a copy of such report shall be submitted to the Director of the Commission’s Division of Pipeline Certificates, within 30 days of the reportable incident. Natural gas companies must also send a copy of submitted incident reports to each state commission for the state(s) in which the reported service interruption occurred.2 If the Commission did not collect this information, it would lose a data point that assists in the monitoring of transactions, operations, and reliability of interstate pipelines.
Type of Respondents: Natural gas companies experiencing service interruptions or damage to facilities.
Estimate of Annual Burden: The Commission estimates the average annual burden and cost3 for this information collection as follows.
|
Number of Respondents (1) |
Annual Number of Responses per Respondent (2) |
Total Number of Responses (1)*(2)=(3) |
Average Burden Hrs. & Cost ($) Per Response (4) |
Total Annual Burden Hrs. & Total Annual Cost (3)*(4)=(5) |
Cost per Respondent4 ($) (5)÷(1) |
Notification of Incident – Service Interruption |
50 |
1 |
50 |
1 hr.; $100.00 |
50 hrs.; $5,000.00 |
$100.00 |
Notification of Incident – Damage |
22 |
1 |
22 |
0.25 hrs.; $25.00 |
5.5 hrs.; $550.00 |
$25.00 |
Submittal of DOT Incident Report |
10 |
1 |
10 |
0.25 hrs.; $25.00 |
2.5 hrs.; $250.00 |
$25.00 |
TOTAL |
82 |
|
58 hrs.; $5,800 |
|
Comments: Comments are invited on: (1) whether the collections of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden5 and cost of the collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the
collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Debbie-Anne A. Reese,
Acting Secretary.
1 The Department of Transportation defines “incident” at 49 CFR 191.3. The regulatory thresholds for an “incident report” include (1) A death, or personal injury necessitating in-patient hospitalization; (2) Estimated property damage of $122,000 or more; (3) Unintentional estimated gas loss of three million cubic feet or more; (4) Emergency shutdown of a facility; or (5) An event that is significant in the judgment of the operator.
2 See 18 CFR 260.9(d) and 260.9(e).
3 The Commission staff estimates that the average respondent for FERC-576 is similarly situated to the Commission, in terms of salary plus benefits. Based on FERC’s current annual average of $207,786 (for salary plus benefits), the average hourly cost is $100/hour.
5 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collections burden, reference 5 Code of Federal Regulations 1320.3.
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | Jean Sonneman |
File Modified | 0000-00-00 |
File Created | 2024-07-23 |