2507.05 Sample Renovation Recordkeeping

2507.05 SampleRenovationRecordkeeping.pdf

Lead Training, Certification, Accreditation and Authorization Activities (Renewal)

2507.05 Sample Renovation Recordkeeping

OMB: 2070-0195

Document [pdf]
Download: pdf | pdf
Sample Renovation Recordkeeping Checklist

Form Approved OMB No. 2070-0195 Expires 2/29/24

Name of Firm:
Date and Location of Renovation:
Brief Description of Renovation:
Name of Assigned Renovator:
Name(s) of Trained Worker(s), if used:
Name of Dust Sampling Technician,
Inspector, or Risk Assessor, if used:
___	 Copies of renovator and dust sampling technician qualifications (training certificates, certifications) on file.
___	 Certified renovator provided training to workers on (check all that apply):
___	 Posting warning signs 	

	___ Setting up plastic containment barriers

___	 Maintaining containment 	___ Avoiding spread of dust to adjacent areas
		___ Waste handling	 		___ Post-renovation cleaning
___	Test kit or test results from an EPA-recognized laboratory on collected paint chip sample, used by certified
renovator to determine whether lead was present on components affected by renovation (identify method 		
used, type of test kit used (if applicable), laboratory used to conduct paint chip analysis, describe sampling
locations and results):
___	 Warning signs posted at entrance to work area.
___	 Work area contained to prevent spread of dust and debris
		___	
All objects in the work area removed or covered (interiors)
		___	
HVAC ducts in the work area closed and covered (interiors)
		___	
Windows in the work area closed (interiors)
		___	
Windows in and within 20 feet of the work area closed (exteriors)
		___	
Doors in the work area closed and sealed (interiors)
		___	
Doors in and within 20 feet of the work area closed and sealed (exteriors)
		___	
Doors that must be used in the work area covered to allow passage but prevent spread of dust
		___	
Floors in the work area covered with taped-down plastic (interiors)
		___	
Ground covered by plastic extending 10 feet from work area—plastic anchored to building and
				 weighed down by heavy objects (exteriors)
		___	
Vertical containment installed if property line prevents 10 feet of ground covering, or if necessary to prevent
migration of dust and debris to adjacent property (exteriors)
___	 Waste contained on-site and while being transported off-site.
___	 Work site properly cleaned after renovation
		___	
All chips and debris picked up, protective sheeting misted, folded dirty side inward, and taped for removal
		___	
Work area surfaces and objects cleaned using HEPA vacuum and/or wet cloths or mops (interiors)
___	 Certified renovator performed post-renovation cleaning verification (describe results, including the
number of wet and dry cloths used):
		___	
If dust clearance testing was performed instead, attach a copy of report
___	 I certify under penalty of law that the above information is true and complete.
Name and title

Date

This collection of information is approved by OMB under the Paperwork
Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2070-0195). Responses
to this collection of information are mandatory (40 CFR 745). An agency may not
conduct or sponsor, and a person is not required to respond to, a collection of
information unless it displays a currently valid OMB control number. The public
reporting and recordkeeping burden for this collection of information is
estimated to range from 4.5 to 7 hours per response. Send comments on the
Agency’s need for this information, the accuracy of the provided burden
estimates and any suggested methods for minimizing respondent burden
including through the use of automated collection techniques to the Director,
Regulatory Support Division, U.S. Environmental Protection Agency (2821T),
1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control
number in any correspondence. Do not send the completed form to this
address.


File Typeapplication/pdf
File TitleSample Renovation Recordkeeping Checklist
SubjectRRP, renovation, repair and painting, checklist, post renovation
AuthorEPA/NPCD
File Modified2023-01-09
File Created2011-09-23

© 2024 OMB.report | Privacy Policy