Assumptions no longer used |
|
|
Old assumptions retained |
|
|
New assumptions |
|
|
|
|
|
General Assumptions |
2023 numbers |
2015-2017 numbers |
# beneficial use respondents |
0 |
72 |
% existing and new CCR units aquifer demonstration |
50% |
50% |
% existing and new CCR units wetland demonstration |
50% |
50% |
# landfills affected by fault area location restriction |
4 |
2 |
# surface impoundments affected by fault area location restriction |
138 |
7 |
# landfills affected by seismic zone location restriction |
4 |
9 |
# surface impoundments affected by seismic zone location restriction |
150 |
4 |
# landfills affected by unstable area location restriction |
4 |
9 |
# surface impoundments affected by unstable area location restriction |
138 |
12 |
% new CCR landfills with alternative composite liner |
0% |
0% |
% CCR surface impoundments that are incised CCR units |
23% |
20% |
% units that will activate EAP |
1% |
1% |
% units subject to 40 CFR 257.73(c) through (e) |
55% |
65% |
% units identify structural stability deficiencies during periodic assessment |
0% |
0% |
% amend CCR fugitive dust control plan |
0% |
0% |
% amend run-on and run-off control system plan |
0% |
0% |
% amend the inflow design flood control system plan |
0% |
0% |
% surface impoundments subject to periodic structural stability assessment |
0% |
0% |
% surface impoundments for which deficiency is identified during an inspection |
1% |
1% |
% landfills for which deficiency is identified during an inspection |
1% |
1% |
% alternative monitoring frequency for repeated sampling and analysis for constituents listed in Appendix III |
5% |
5% |
% statistically significant increase over background levels for one or more of the constituents listed in Appendix III |
87% |
10% |
% statistically significant increase over background levels for one or more of the constituents listed in Appendix III caused by a source other than the CCR unit |
23% |
50% |
% alternative monitoring frequency for repeated sampling and analysis for constituents listed in Appendix IV |
1% |
5% |
% units will return to detection monitoring |
0% |
5% |
% statistically significant increase over groundwater protection levels for one or more of the constituents listed in Appendix IV |
42% |
5% |
% notify all persons who own the land or reside on the land that directly overlies any part of the plume of contamination if contaminants have migrated off-site |
42% |
0% |
% demonstrate that a source other than the CCR unit caused the contamination, or that the statistically significant increase resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality |
7% |
0% |
# inactive surface impoundments |
129 |
111 |
# States will develop Solid Waste Management Plan |
2 |
48 |
% of CCR surface impoundments that have high or significant hazards |
43% |
NA |
# units required to perform alternative source demonstration |
30.81% |
NA |
% of units that complete assessment monitoring |
64% |
NA |
# States with 5 or more facilities |
27 |
NA |
% of States with 5 or more facilities will submit application for CCR program approval |
75% |
NA |
% of closing units located at plants with at least 2 units |
50% |
NA |
Facility Universe |
|
|
|
|
|
|
|
|
|
Respondent Type |
Total |
Annual |
|
|
coal-fired electric utility plants: 2023-2026 |
302 |
101 |
|
|
coal-fired electric utility plants: 2015-2017 |
414 |
138 |
|
|
|
|
|
|
|
CCR Units - 2023-2025 |
|
|
|
|
Current Universe. 2018 existing surface impoundments and landfills were updated in October 2018; other counts were calculated using the January 2018 universe. |
|
|
|
|
Category |
2023 |
2024 |
2025 |
Average |
Landfills – Existing |
226 |
226 |
226 |
226 |
Landfills – New |
21 |
2.625 |
2.625 |
9 |
Impoundments - Existing |
522 |
522 |
522 |
522 |
Impoundments - New |
10 |
1.25 |
1.25 |
4 |
Total |
779 |
752 |
752 |
761 |
|
|
|
|
|
Detailed universe from January 2018. Used to develop current counts for October 2018 ICR. |
|
|
|
|
Category |
2018 |
2019 |
2020 |
Average |
Landfills – Existing |
283 |
283 |
283 |
283 |
Landfills – New |
2 |
0 |
23 |
8 |
Impoundments - Existing |
610 |
608 |
343 |
520 |
Impoundments - Existing Disposal |
111 |
109 |
59 |
93 |
Impoundmens - Existing Storage |
499 |
499 |
284 |
427 |
Impoundments - New |
1 |
0 |
228 |
76 |
Impoundments - New Disposal |
1 |
0 |
13 |
5 |
Impoundments - New Storage |
0 |
0 |
215 |
72 |
Total |
896 |
891 |
877 |
888 |
|
|
|
|
|
2015-2017 ICR Universe |
|
|
|
|
Category |
2015 |
2016 |
2017 |
Average |
Landfills – Existing |
286 |
284 |
282 |
284 |
Landfills – New |
2 |
3 |
3 |
3 |
Impoundments - Existing |
633 |
628 |
613 |
625 |
Impoundments - New |
0 |
4 |
18 |
7 |
Total |
921 |
919 |
916 |
919 |
|
|
|
|
|
Reference for 2018-2020: Remand rule RIA, Page2-1 |
|
|
|
|
|
|
|
|
|
As of 2015: RIA CHAPTER 9 |
414 |
facilities |
|
|
|
204 |
facilities with active landfills |
|
|
|
286 |
active landfills |
|
|
|
117 |
facilities with disposal impoundments |
|
|
|
117 |
disposal impoundments. |
|
|
|
204 |
facilities with storage impoundments |
|
|
|
519 |
active storage impoundments |
|
|
|
|
|
|
|
|
totals |
|
|
|
|
414 |
total facilities |
|
|
|
286 |
Total landfills |
|
|
|
636 |
total impoundments |
|
|
|
|
|
|
|
Changes 2015 - 2017 |
402 |
Facilities |
|
|
Closure of 12 plants |
283 |
Landfills |
|
|
|
111 |
Disposal impoundments |
|
|
|
499 |
Storagee impoundments |
|
|
|
|
|
|
|
New Units |
LF |
Exhibit 4-O 2015 RIA |
|
|
|
SI |
Exhibit 4-L 2015 RIA |
|
|
|
SI - Storage |
Exhibit 4-M 2015 RIA |
|
|
|
|
|
|
|
Category |
2018 |
2019 |
2020 |
Average |
Landfills – Existing |
283 |
283 |
283 |
283 |
Landfills – New |
2 |
0 |
23 |
8 |
Impoundments - Existing Disposal |
111 |
109 |
59 |
93 |
Impoundmens - Net Storage |
499 |
499 |
284 |
427 |
Impoundments - New Disposal |
1 |
0 |
13 |
5 |
Impoundments - New Storage |
0 |
0 |
215 |
72 |
Total |
896 |
891 |
877 |
888 |
Owners and Operators of CCR Units |
|
|
|
(Note: changes here WILL be reflected in the column headings of the tables.) |
|
|
|
|
|
|
|
Labor Category |
Occupation code |
May 2023 Mean Hourly Ratea |
Fringe Benefits Rateb |
Overhead Ratec |
Fringe/Overhead Multiplier |
Employment Cost Index Adjustment to 2023 Levels d |
2023 Loaded Rate |
Legal |
23-1011 |
$78.74 |
33.3% |
12% |
1.78 |
1.000 |
$140.50 |
Managerial |
11-0000 |
$63.08 |
33.3% |
12% |
1.78 |
1.000 |
$112.56 |
Technical |
17-3026 |
$30.52 |
33.3% |
12% |
1.78 |
1.000 |
$54.46 |
Clerical |
43-9061 |
$19.78 |
33.3% |
12% |
1.78 |
1.000 |
$35.29 |
a Mean hourly rates from U.S. Bureau of Labor Statistics (BLS)’s May 2023 National Industry-Specific Occupational Employment and Wage Estimates cross all industry sectors, at: http://www.bls.gov/oes/current/oes_nat.htm. |
|
|
|
b Applied “All goods-producing” industry group fringe benefits percentage of 33.3% from “Table 6. Private industry, by major industry group” of the US Bureau of Labor Statistics (BLS) “Employer Costs for Employee Compensation” (ECEC), June 2018 at https://www.bls.gov/news.release/ecec.t06.htm. |
|
|
|
c In absence of data specific to industry, applied 12% Federal civilian overhead cost factor from Figure C1 of the REVISED February 2008 OMB Circular A-76 at http://www.whitehouse.gov/omb/circulars_a076_a76_incl_tech_correction/. |
|
|
|
d Not necessary because 2023 hourly rates available. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
State Government Agencies and Tribal Authorities |
|
|
|
(Note: changes here WILL be reflected in the column headings of the tables.) |
|
|
|
|
|
|
|
Labor Category |
Occupation code |
May 2023 Mean Hourly Ratea |
Fringe Benefits Rateb |
Overhead Ratec |
Fringe/Overhead Multiplier d |
Employment Cost Index Adjustment to 2023 Levels e |
2023 Loaded Rate |
Legal |
23-1011 |
$49.71 |
37.6% |
12% |
1.97 |
1.0000 |
$97.87 |
Managerial |
11-0000 |
$48.35 |
37.6% |
12% |
1.97 |
1.0000 |
$95.19 |
Technical |
19-4091 |
$28.36 |
37.6% |
12% |
1.97 |
1.0000 |
$55.84 |
Clerical |
43-9061 |
$18.91 |
37.6% |
12% |
1.97 |
1.0000 |
$37.23 |
a U.S. Bureau of Labor Statistics (BLS)’s May 2023 National Industry-Specific Occupational Employment and Wage Estimates for NAICS 999200 – State Government (OES Designation), at: http://www.bls.gov/oes/current/naics4_999200.htm#b17-0000 |
|
|
|
b Applied 37.6% fringe benefits percentage from “Table 3. State and local government, by major occupational and industry group” of the US Bureau of Labor Statistics (BLS) “Employer Costs for Employee Compensation” (ECEC), June 2018 at https://www.bls.gov/news.release/ecec.t03.htm. |
|
|
|
c In absence of data specific to state governments, applied 12% Federal civilian overhead cost factor from Figure C1 of the REVISED February 2008 OMB Circular A-76 http://www.whitehouse.gov/omb/circulars_a076_a76_incl_tech_correction/. |
|
|
|
d Not necessary because 2023 hourly rates available. |
|
|
|
|
|
|
|
|
|
|
|
Agency |
|
|
|
Labor Category |
GS Code |
January 2023 Base Rate a |
Overhead Rate |
2023 Loaded Rate |
|
|
|
Legal |
GS-15, Step 5 |
63.82 |
1.6 |
$102.11 |
|
|
|
Managerial |
GS-15, Step 1 |
56.31 |
1.6 |
$90.10 |
|
|
|
Technical |
GS-13, Step 1 |
40.51 |
1.6 |
$64.82 |
|
|
|
Clerical |
GS-06, Step 1 |
17.28 |
1.6 |
$27.65 |
|
|
|
a Office of Policy and Management (OPM) 2023 General Schedule (Base) Hourly Rate Pay Table. |
|
|
|
Item |
2023 Cost |
Data Source |
Generic cost for engineer certification |
$461.00 |
Based on cost of $340 in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Development EAP - surface impoundment |
$1,355.00 |
Based on cost of $1,000 in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Development/Amendment of Fugitive Dust Control Plan |
$6,773.00 |
Based on cost of $1,000 in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Documentation on the design, installation, development, and decommissioning of any monitoring wells, piezometers and other measurement, sampling, and analytical devices |
$126,404.00 |
Based on cost of $93,316 in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Development of sampling and analysis program |
$20,319.00 |
Based on cost of $15,000 in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Report describing selected remedy |
$121,452.00 |
Based on cost of $89,660 (90,000 -340) in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Closure and post-closure plan |
$16,878.00 |
Based on cost of $12,460 (12,800 -340) in RIA, 2011 dollars.
Bureau of Labor Statistics, "Historical Consumer Price Index for All Urban Consumers (CPI-U): U. S. city average, all items, by month." September 2018. Available online at: https://www.bls.gov/cpi/tables/supplemental-files/historical-cpi-u-202307.pdf, last accessed on September 6, 2023. All items, December 2011=225.672 and July 2023=305.691. |
Standard Envelope (4 1/8" x 9 1/2") |
$0.06 |
Based on cost from Staples' Web site: Standard Business Envelopes with Gummed Closure, 500/Box for $27.99 (https://www.staples.com/Staples-Gummed-10-Envelope-4-1-8-x-9-1-2-White-500-Box-187013NB/product_187013, last accessed on September 6, 2023) |
First Class Postage (1 ounce) |
$0.66 |
U.S. Postal Service (https://www.usps.com/business/prices.htm?, last accessed on September 6, 2023) |
Certified Mail Service |
$4.35 |
U.S. Postal Service (https://www.usps.com/ship/insurance-extra-services.htm, last accessed on September 6, 2023) |
|
EXHIBIT CCR-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Beneficial use of CCR |
|
|
|
|
|
|
|
|
|
|
|
Prepare and keep demonstration required under 40 CFR 257.53 |
2.00 |
2.00 |
35.00 |
1.00 |
40.00 |
$2,447.51 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Reading the Regulations |
|
|
|
|
|
|
|
|
|
|
|
Read the regulations |
0.50 |
2.00 |
2.50 |
0.00 |
5.00 |
$431.52 |
$0.00 |
$0.00 |
101 |
505.00 |
$43,583.52 |
|
$0.00 |
$0.00 |
$43,583.52 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
101.00 |
505.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Location Restrictions |
|
|
|
|
|
|
|
|
|
|
|
Placement above the Uppermost Aquifer (40 CFR 257.60) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.60(a) |
0.00 |
0.00 |
2.00 |
0.25 |
2.25 |
$117.74 |
$0.00 |
$0.00 |
13 |
29.25 |
$1,530.62 |
|
$0.00 |
$0.00 |
$1,530.62 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
29.25 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.60(b) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Wetlands (40 CFR 257.61) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.61(a) |
0.00 |
0.25 |
1.00 |
0.75 |
2.00 |
$109.07 |
$0.00 |
$0.00 |
13 |
26.00 |
$1,417.91 |
|
$0.00 |
$0.00 |
$1,417.91 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
26.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.61(b) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Fault Areas (40 CFR 257.62) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.62(a) |
0.00 |
0.25 |
1.00 |
0.75 |
2.00 |
$109.07 |
$0.00 |
$0.00 |
13 |
26.00 |
$1,417.91 |
|
$0.00 |
$0.00 |
$1,417.91 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
26.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.62(b) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Seismic Impact Zones (40 CFR 257.63) |
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.63(a) |
0.00 |
0.25 |
1.00 |
0.75 |
2.00 |
$109.07 |
$0.00 |
$0.00 |
13 |
26.00 |
$1,417.91 |
|
$0.00 |
$0.00 |
$1,417.91 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
26.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.63(b) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Unstable Areas (40 CFR 257.64) |
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.64(a) |
0.00 |
0.25 |
1.00 |
0.75 |
2.00 |
$109.07 |
$0.00 |
$0.00 |
13 |
26.00 |
$1,417.91 |
|
$0.00 |
$0.00 |
$1,417.91 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
26.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.64(c) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
865.75 |
$92,517.73 |
|
$0.00 |
$29,965.00 |
$62,552.73 |
|
|
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
231.00 |
865.75 |
$0.00 |
$29,965.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
7,048.00 |
3,693.86 |
0.00 |
17,324.19 |
|
10,755.00 |
161,750.39 |
0.00 |
15,494,102.00 |
|
3,375.00 |
1,113.75 |
0.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Burden per Response |
|
7.86 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Annual Reporting Burden per Respondent |
|
12.23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Annual Recordkeeping Burden per Respondent |
|
535.60 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Annual Third Party Disclosure Burden per Respondent |
|
3.69 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Design Criteria |
|
|
|
|
|
|
|
|
|
|
|
Liner Design Criteria for New CCR Landfills and Any Lateral Expansion of a CCR Landfill (40 CFR 257.70) |
|
|
|
|
|
|
|
|
|
|
|
Obtain certification required under 40 CFR 257.70(c)(2) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.70(e) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
9 |
31.50 |
$5,778.27 |
|
$0.00 |
$4,149.00 |
$1,629.27 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
31.50 |
$0.00 |
$4,149.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.70(f) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
9 |
31.50 |
$5,778.27 |
|
$0.00 |
$4,149.00 |
$1,629.27 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
31.50 |
$0.00 |
$4,149.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Liner Design Criteria for Existing CCR Surface Impoundments (40 CFR 257.71) |
|
|
|
|
|
|
|
|
|
|
|
Document liner type under 40 CFR 257.71(a) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.71(b) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Liner Design Criteria for New CCR Surface Impoundments and Any Lateral Expansion of a CCR Surface Impoundment (40 CFR 257.72) |
|
|
|
|
|
|
|
|
|
|
|
Obtain certification required under 40 CFR 257.72(c) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
4 |
14.00 |
$2,568.12 |
|
$0.00 |
$1,844.00 |
$724.12 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
14.00 |
$0.00 |
$1,844.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.72(d) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
4 |
14.00 |
$2,568.12 |
|
$0.00 |
$1,844.00 |
$724.12 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
14.00 |
$0.00 |
$1,844.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Structural Integrity Criteria for Existing CCR Surface Impoundments (40 CFR 257.73) |
|
|
|
|
|
|
|
|
|
|
|
Place on or immediately adjacent to the CCR unit a permanent identification marker showing the identification number of the CCR unit, as required under 40 CFR 257.73(a)(1) |
0.00 |
0.00 |
0.25 |
0.00 |
0.25 |
$13.62 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Document the initial and periodic hazard potential classification assessments of the CCR unit, as required under 40 CFR 257.73(a)(2) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.73(a)(2)(ii) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare a written EAP, as required under 40 CFR 257.73(a)(3) |
0.00 |
4.00 |
30.00 |
5.00 |
39.00 |
$2,260.49 |
$0.00 |
$1,355.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare documentation on an annual face-to-face meeting or exercise between representatives of the owner/operator of the CCR unit and the local emergency responders, as required under 40 CFR 257.73(a)(3)(i)(E) |
0.00 |
0.25 |
0.50 |
0.25 |
1.00 |
$64.19 |
$0.00 |
$0.00 |
175 |
175.00 |
$11,233.25 |
|
$0.00 |
$0.00 |
$11,233.25 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
175.00 |
175.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend the EAP, as required under 40 CFR 257.73(a)(3)(ii) |
0.00 |
1.00 |
8.00 |
1.00 |
10.00 |
$583.53 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.73(a)(3)(iv)) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare documentation required under 40 CFR 257.73(a)(3)(v) |
0.00 |
0.50 |
3.00 |
0.50 |
4.00 |
$237.31 |
$0.00 |
$0.00 |
4 |
16.00 |
$949.24 |
|
$0.00 |
$0.00 |
$949.24 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
16.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Compile history of construction, as required under 40 CFR 257.73(c) |
0.00 |
0.50 |
20.00 |
3.00 |
23.50 |
$1,251.35 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Conduct and document initial and periodic structural stability assessments, as required under 40 CFR 257.73(d) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare action plan required under 40 CFR 257.73(d)(2) |
0.00 |
1.00 |
8.00 |
1.00 |
10.00 |
$583.53 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.73(d)(3) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Conduct and document initial and periodic safety factor assessments for each CCR unit, as required under 40 CFR 257.73(e) |
0.00 |
4.00 |
6.00 |
2.00 |
12.00 |
$847.58 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.73(e)(2) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-2 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Design Criteria |
|
|
|
|
|
|
|
|
|
|
|
Structural Integrity Criteria for New CCR Surface Impoundments and Any Lateral Expansion of a CCR Surface Impoundment (40 CFR 257.74) |
|
|
|
|
|
|
|
|
|
|
|
Place on or immediately adjacent to the CCR unit a permanent identification marker showing the identification number of the CCR unit, as required under 40 CFR 257.74(a)(1) |
0.00 |
0.00 |
0.25 |
0.00 |
0.25 |
$13.62 |
$0.00 |
$0.00 |
3 |
0.75 |
$40.86 |
|
$0.00 |
$0.00 |
$40.86 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
0.75 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Document the initial and periodic hazard potential classification assessments of the CCR unit, as required under 40 CFR 257.74(a)(2) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
3 |
60.00 |
$3,269.37 |
|
$0.00 |
$0.00 |
$3,269.37 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
60.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.74(a)(2)(ii) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
3 |
10.50 |
$1,926.09 |
|
$0.00 |
$1,383.00 |
$543.09 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
10.50 |
$0.00 |
$1,383.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare a written EAP, as required under 40 CFR 257.74(a)(3) |
0.00 |
4.00 |
30.00 |
5.00 |
39.00 |
$2,260.49 |
$0.00 |
$1,355.00 |
3 |
117.00 |
$10,846.47 |
|
$0.00 |
$4,065.00 |
$6,781.47 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
117.00 |
$0.00 |
$4,065.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare documentation on an annual face-to-face meeting or exercise between representatives of the owner/operator of the CCR unit and the local emergency responders, as required under 40 CFR 257.74(a)(3)(i)(E) |
0.00 |
0.25 |
0.50 |
0.25 |
1.00 |
$64.19 |
$0.00 |
$0.00 |
1 |
1.00 |
$64.19 |
|
$0.00 |
$0.00 |
$64.19 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
1.00 |
1.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend the EAP, as required under 40 CFR 257.74(a)(3)(ii) |
0.00 |
1.00 |
8.00 |
1.00 |
10.00 |
$181.03 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.74(a)(3)(iv)) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
3 |
10.50 |
$1,926.09 |
|
$0.00 |
$1,383.00 |
$543.09 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
10.50 |
$0.00 |
$1,383.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare documentation required under 40 CFR 257.74(a)(3)(v) |
0.00 |
0.50 |
3.00 |
0.50 |
4.00 |
$237.31 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Compile the design and construction plans for the CCR unit, as required under 40 CFR 257.74(c) |
0.00 |
0.50 |
20.00 |
3.00 |
23.50 |
$1,251.35 |
$0.00 |
$0.00 |
2 |
47.00 |
$2,502.70 |
|
$0.00 |
$0.00 |
$2,502.70 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
47.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Conduct and document initial and periodic structural stability assessments, as required under 40 CFR 257.74(d) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
2 |
40.00 |
$2,179.58 |
|
$0.00 |
$0.00 |
$2,179.58 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
40.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare action plan required under 40 CFR 257.74(d)(2) |
0.00 |
1.00 |
8.00 |
1.00 |
10.00 |
$583.53 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.74(d)(3) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
2 |
7.00 |
$1,284.06 |
|
$0.00 |
$922.00 |
$362.06 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
7.00 |
$0.00 |
$922.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Conduct and document initial and periodic safety factor assessments for each CCR unit, as required under 40 CFR 257.74(e) |
0.00 |
4.00 |
6.00 |
2.00 |
12.00 |
$847.58 |
$0.00 |
$0.00 |
2 |
24.00 |
$1,695.16 |
|
$0.00 |
$0.00 |
$1,695.16 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
24.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.74(e)(2) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
2 |
7.00 |
$1,284.06 |
|
$0.00 |
$922.00 |
$362.06 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
7.00 |
$0.00 |
$922.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
606.75 |
$55,893.90 |
|
$0.00 |
$20,661.00 |
$35,232.90 |
|
|
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
231.00 |
606.75 |
$0.00 |
$20,661.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Operating Criteria |
|
|
|
|
|
|
|
|
|
|
|
Air Criteria (40 CFR 257.80) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepare CCR fugitive dust control plan required under 40 CFR 257.80(b) |
0.00 |
0.00 |
8.00 |
0.50 |
8.50 |
$453.33 |
$0.00 |
$6,773.00 |
13 |
110.50 |
$93,942.29 |
|
$0.00 |
$88,049.00 |
$5,893.29 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
110.50 |
$0.00 |
$88,049.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend CCR fugitive dust control plan, as required under 40 CFR 257.80(b)(6) |
0.00 |
0.00 |
8.00 |
0.50 |
8.50 |
$453.33 |
$0.00 |
$6,773.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.80(b)(7) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare annual CCR fugitive dust control report required under 40 CFR 257.80(c) |
0.00 |
0.50 |
6.50 |
1.00 |
8.00 |
$445.56 |
$0.00 |
$0.00 |
770 |
6,160.00 |
$343,081.20 |
|
$0.00 |
$0.00 |
$343,081.20 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
770.00 |
6,160.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Run-On and Run-Off Controls for CCR Landfills (40 CFR 257.81) |
|
|
|
|
|
|
|
|
|
|
|
Prepare initial and periodic run-on and run-off control system plans required under 40 CFR 257.81(c) |
0.00 |
2.00 |
10.00 |
4.00 |
16.00 |
$910.88 |
$0.00 |
$0.00 |
9 |
144.00 |
$8,197.92 |
|
$0.00 |
$0.00 |
$8,197.92 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
144.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend run-on and run-off control system plans, as required under 40 CFR 257.81(c)(2) |
0.00 |
2.00 |
10.00 |
4.00 |
16.00 |
$910.88 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.81(c)(5) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
9 |
31.50 |
$5,778.27 |
|
$0.00 |
$4,149.00 |
$1,629.27 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
31.50 |
$0.00 |
$4,149.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Hydrologic and Hydraulic Capacity Requirements for CCR Surface Impoundments (40 CFR 257.82) |
|
|
|
|
|
|
|
|
|
|
|
Prepare initial and periodic inflow design flood control system plans required under 40 CFR 257.82(c) |
0.00 |
2.00 |
10.00 |
4.00 |
16.00 |
$910.88 |
$0.00 |
$0.00 |
4 |
64.00 |
$3,643.52 |
|
$0.00 |
$0.00 |
$3,643.52 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
64.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend the inflow design flood control system plan, as required under 40 CFR 257.82(c)(2) |
0.00 |
2.00 |
10.00 |
4.00 |
16.00 |
$910.88 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.82(c)(5) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
4 |
14.00 |
$2,568.12 |
|
$0.00 |
$1,844.00 |
$724.12 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
14.00 |
$0.00 |
$1,844.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Inspection Requirements for CCR Surface Impoundments (40 CFR 257.83) |
|
|
|
Recordkeeping |
|
|
|
|
|
|
|
Conduct inspections required under 40 CFR 257.83(a) |
0.00 |
13.00 |
52.00 |
0.00 |
65.00 |
$4,295.20 |
$0.00 |
$0.00 |
526 |
34,190.00 |
$2,259,275.20 |
|
$0.00 |
$0.00 |
$2,259,275.20 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
526.00 |
34,190.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Conduct inspections required under 40 CFR 257.83(b)(1) |
0.00 |
13.00 |
52.00 |
0.00 |
65.00 |
$4,295.20 |
$0.00 |
$0.00 |
289 |
18,785.00 |
$1,241,312.80 |
|
$0.00 |
$0.00 |
$1,241,312.80 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
289.00 |
18,785.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Develop inspection report required under 40 CFR 257.83(b)(2) |
0.00 |
0.00 |
72.50 |
0.00 |
72.50 |
$3,948.35 |
$0.00 |
$0.00 |
289 |
20,952.50 |
$1,141,073.15 |
|
$0.00 |
$0.00 |
$1,141,073.15 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
289.00 |
20,952.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Develop and implement action plan to remedy structural weakness or disrupting condition, as required under 40 CFR 257.83(b)(5) |
0.00 |
2.00 |
10.00 |
4.00 |
16.00 |
$910.88 |
$0.00 |
$0.00 |
5 |
80.00 |
$4,554.40 |
|
$0.00 |
$0.00 |
$4,554.40 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
5.00 |
80.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Inspection Requirements for CCR Landfills (40 CFR 257.84) |
|
|
|
|
|
|
|
|
|
|
|
Conduct inspections required under 40 CFR 257.84(a) |
0.00 |
13.00 |
52.00 |
0.00 |
65.00 |
$4,295.20 |
$0.00 |
$0.00 |
235 |
15,275.00 |
$1,009,372.00 |
|
$0.00 |
$0.00 |
$1,009,372.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
235.00 |
15,275.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Conduct inspections required under 40 CFR 257.84(b)(1) |
0.00 |
13.00 |
52.00 |
0.00 |
65.00 |
$4,295.20 |
$0.00 |
$0.00 |
235 |
15,275.00 |
$1,009,372.00 |
|
$0.00 |
$0.00 |
$1,009,372.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
235.00 |
15,275.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Develop inspection report required under 40 CFR 257.84(b)(2) |
0.00 |
0.00 |
72.50 |
0.00 |
72.50 |
$3,948.35 |
$0.00 |
$0.00 |
235 |
17,037.50 |
$927,862.25 |
|
$0.00 |
$0.00 |
$927,862.25 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
235.00 |
17,037.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Develop and implement action plan to remedy structural weakness or disrupting condition, as required under 40 CFR 257.84(b)(5) |
0.00 |
2.00 |
10.00 |
4.00 |
16.00 |
$910.88 |
$0.00 |
$0.00 |
2 |
32.00 |
$1,821.76 |
|
$0.00 |
$0.00 |
$1,821.76 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
32.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
128,196.50 |
$8,060,201.27 |
|
$0.00 |
$100,035.00 |
$7,960,166.27 |
|
|
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2,638.00 |
128,196.50 |
$0.00 |
$100,035.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Groundwater Monitoring and Corrective Action |
|
|
|
|
|
|
|
|
|
|
|
Applicability (40 CFR 257.90) |
|
|
|
|
|
|
|
|
|
|
|
Develop annual groundwater monitoring and corrective action report required under 40 CFR 257.90(e) |
0.00 |
0.50 |
6.50 |
1.00 |
8.00 |
$445.56 |
$0.00 |
$0.00 |
770 |
6,160.00 |
$343,081.20 |
|
$0.00 |
$0.00 |
$343,081.20 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
770.00 |
6,160.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Groundwater Monitoring Systems (40 CFR 257.91) |
|
|
|
|
|
|
|
|
|
|
|
Document and include in the operating record the design, installation, development, and decommissioning of any monitoring wells, piezometers and other measurement, sampling, and analytical devices, as required under 40 CFR 257.91(e)(1) |
0.00 |
10.00 |
211.00 |
12.70 |
233.70 |
$13,064.84 |
$0.00 |
$106,085.00 |
13 |
3,038.10 |
$1,548,947.92 |
|
$0.00 |
$1,379,105.00 |
$169,842.92 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
3,038.10 |
$0.00 |
$1,379,105.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.91(f) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Groundwater Sampling and Analysis Requirements (40 CFR 257.93) |
|
|
|
|
|
|
|
|
|
|
|
Develop sampling and analysis program |
0.00 |
0.00 |
40.00 |
0.00 |
40.00 |
$2,178.40 |
$0.00 |
$20,319.00 |
13 |
520.00 |
$292,466.20 |
|
$0.00 |
$264,147.00 |
$28,319.20 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
520.00 |
$0.00 |
$264,147.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.93(f)(6) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Detection Monitoring Program (40 CFR 257.94) |
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.94(d)(1)-(2) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
13 |
260.00 |
$14,167.27 |
|
$0.00 |
$0.00 |
$14,167.27 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
260.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.94(d)(3) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare demonstration required under 40 CFR 257.94(e)(2) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
234 |
4,680.00 |
$255,010.86 |
|
$0.00 |
$0.00 |
$255,010.86 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
234.00 |
4,680.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.94(e)(2) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
234 |
819.00 |
$150,235.02 |
|
$0.00 |
$107,874.00 |
$42,361.02 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
234.00 |
819.00 |
$0.00 |
$107,874.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.94(e)(3) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
242 |
121.00 |
$13,619.76 |
|
$0.00 |
$0.00 |
$13,619.76 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
242.00 |
121.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Assessment Monitoring Program (40 CFR 257.95) |
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.95(c)(1)-(2) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
12 |
240.00 |
$13,077.48 |
|
$0.00 |
$0.00 |
$13,077.48 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
12.00 |
240.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.95(c)(3) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
12 |
42.00 |
$7,704.36 |
|
$0.00 |
$5,532.00 |
$2,172.36 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
12.00 |
42.00 |
$0.00 |
$5,532.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Compile results of the Appendix III and Appendix IV constituent concentrations required under 40 CFR 257.95(d)(1) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
485 |
242.50 |
$27,295.80 |
|
$0.00 |
$0.00 |
$27,295.80 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
485.00 |
242.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.95(e) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
12 |
6.00 |
$675.36 |
|
$0.00 |
$0.00 |
$675.36 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
12.00 |
6.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.95(g) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
12 |
6.00 |
$675.36 |
|
$0.00 |
$0.00 |
$675.36 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
12.00 |
6.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.95(g)(2) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
5 |
2.50 |
$281.40 |
|
$0.00 |
$0.00 |
$281.40 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
5.00 |
2.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare demonstration required under 40 CFR 257.95(g)(3)(ii) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
1 |
20.00 |
$1,089.79 |
|
$0.00 |
$0.00 |
$1,089.79 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
1.00 |
20.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Develop report that includes the factual or evidentiary basis for any conclusions in the demonstration required under 40 CFR 257.95(g)(3)(ii) |
0.00 |
0.50 |
6.50 |
1.00 |
8.00 |
$445.56 |
$0.00 |
$0.00 |
1 |
8.00 |
$445.56 |
|
$0.00 |
$0.00 |
$445.56 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
1.00 |
8.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.95(g)(3)(ii) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
1 |
3.50 |
$642.03 |
|
$0.00 |
$461.00 |
$181.03 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
1.00 |
3.50 |
$0.00 |
$461.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.95(g)(5) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
107 |
53.50 |
$6,021.96 |
|
$0.00 |
$0.00 |
$6,021.96 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
53.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-4 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Groundwater Monitoring and Corrective Action |
|
|
|
|
|
|
|
|
|
|
|
Assessment of Corrective Measures (40 CFR 257.96) |
|
|
|
|
|
|
|
|
|
|
|
Prepare demonstration required under 40 CFR 257.96(a) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
107 |
2,140.00 |
$116,607.53 |
|
$0.00 |
$0.00 |
$116,607.53 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
2,140.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.96(a) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
107 |
374.50 |
$68,697.21 |
|
$0.00 |
$49,327.00 |
$19,370.21 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
374.50 |
$0.00 |
$49,327.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Complete assessment of corrective measures required under 40 CFR 257.96(d) |
|
|
|
|
0.00 |
$0.00 |
$0.00 |
$0.00 |
107 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
107.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Discuss the results of the corrective measures assessment prior to the selection of remedy in a public meeting with interested and affected parties, as required under 40 CFR 257.96(e) |
2.00 |
4.00 |
10.00 |
0.00 |
16.00 |
$1,275.84 |
$0.00 |
$0.00 |
107 |
1,712.00 |
$136,514.88 |
|
$0.00 |
$0.00 |
$136,514.88 |
|
Reporting |
|
107.00 |
1,712.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Selection of Remedy (40 CFR 257.97) |
|
|
|
|
|
|
|
|
|
|
|
Prepare semi-annual report describing the progress in selecting and designing the remedy |
0.00 |
12.00 |
24.00 |
4.00 |
40.00 |
$2,798.92 |
$0.00 |
$0.00 |
107 |
4,280.00 |
$299,484.44 |
|
$0.00 |
$0.00 |
$299,484.44 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
4,280.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare report on selected remedy |
0.00 |
7.50 |
50.00 |
5.75 |
63.25 |
$3,770.12 |
$0.00 |
$121,452.00 |
107 |
6,767.75 |
$13,398,766.84 |
|
$0.00 |
$12,995,364.00 |
$403,402.84 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
6,767.75 |
$0.00 |
$12,995,364.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.97(a) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
107 |
374.50 |
$68,697.21 |
|
$0.00 |
$49,327.00 |
$19,370.21 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
374.50 |
$0.00 |
$49,327.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Implementation of the Corrective Action Program (40 CFR 257.98) |
|
|
|
|
|
|
|
|
|
|
|
Prepare notification required under 40 CFR 257.98(e) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.98(e) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
32,007.35 |
$16,789,244.61 |
|
$0.00 |
$14,869,116.00 |
$1,920,128.61 |
|
|
|
214.00 |
1,712.00 |
$0.00 |
$0.00 |
|
2,741.00 |
30,295.35 |
$0.00 |
$14,869,116.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Closure and Post-Closure Care |
|
|
|
|
|
|
|
|
|
|
|
Closure of CCR Landfills and CCR Surface Impoundments (40 CFR 257.101) |
|
|
|
|
|
|
|
|
|
|
|
Include statement in the notification required under 40 CFR 257.102(g) that the CCR surface impoundment is closing under the requirements of 40 CFR 257.101(a)(1), as required under 40 CFR 257.101(a)(2) |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
$0.00 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Include statement in the notification required under 40 CFR 257.102(g) that the CCR surface impoundment is closing under the requirements of 40 CFR 257.101(b)(1) or (b)(2), as required under 40 CFR 257.101(b)(3) |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
$0.00 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Include statement in the notification required under 40 CFR 257.102(g) that the CCR surface impoundment is closing under the requirements of 40 CFR 257.101(c)(1), as required under 40 CFR 257.101(c)(2) |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
$0.00 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Include statement in the notification required under 40 CFR 257.102(g) that the CCR landfill is closing under the requirements of 40 CFR 257.101(d)(1), as required under 40 CFR 257.101(d)(2) |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
$0.00 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Criteria for Conducting Closure of CCR Landfills and CCR Surface Impoundments (40 CFR 257.102) |
|
|
|
|
|
|
|
|
|
|
|
Prepare written closure plan required under 40 CFR 257.102(b) |
0.00 |
4.00 |
40.00 |
10.00 |
54.00 |
$2,981.54 |
$0.00 |
$16,878.00 |
13 |
702.00 |
$258,174.02 |
|
$0.00 |
$219,414.00 |
$38,760.02 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
702.00 |
$0.00 |
$219,414.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend written closure plan required under 40 CFR 257.102(b)(3) |
0.00 |
2.00 |
20.00 |
5.00 |
27.00 |
$1,490.77 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.102(b)(4) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.102(d)(3)(iii) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
17 |
59.50 |
$10,914.51 |
|
$0.00 |
$7,837.00 |
$3,077.51 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
59.50 |
$0.00 |
$7,837.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide written documentation that the CCR unit will continue to accept wastes or will start removing CCR for the purpose of beneficial use, as required under 40 CFR 257.102(e)(2)(ii) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare demonstration required under 40 CFR 257.102(f)(2) |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.102(f)(3) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
17 |
59.50 |
$10,914.51 |
|
$0.00 |
$7,837.00 |
$3,077.51 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
59.50 |
$0.00 |
$7,837.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.102(g) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.102(h) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
17 |
8.50 |
$956.76 |
|
$0.00 |
$0.00 |
$956.76 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
8.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.102(h) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
17 |
59.50 |
$10,914.51 |
|
$0.00 |
$7,837.00 |
$3,077.51 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
59.50 |
$0.00 |
$7,837.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.102(i) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
17 |
8.50 |
$956.76 |
|
$0.00 |
$0.00 |
$956.76 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
8.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-5 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Closure and Post-Closure Care |
|
|
|
|
|
|
|
|
|
|
|
Alternative Closure Requirements (40 CFR 257.103) |
|
|
|
|
|
|
|
|
|
|
|
Obtain certification required under 40 CFR 257.103(a)(1) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Document that there is no alternative CCR disposal capacity |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.103(b)(1) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Document the permanent cessation of a coal-fired boiler(s) by a certain date |
0.00 |
1.00 |
16.00 |
3.00 |
20.00 |
$1,089.79 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.103(c)(1) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare periodic progress reports required by 40 CFR 257.103(a)(1)(iii) or (b)(1)(iii) |
0.00 |
0.50 |
6.50 |
1.00 |
8.00 |
$445.56 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.103(c)(3) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Post-Closure Care Requirements (40 CFR 257.104) |
|
|
|
|
|
|
|
|
|
|
|
Prepare written post-closure plan, as required under 40 CFR 257.104(d) |
0.00 |
4.00 |
40.00 |
10.00 |
54.00 |
$2,981.54 |
$0.00 |
$16,878.00 |
13 |
702.00 |
$258,174.02 |
|
$0.00 |
$219,414.00 |
$38,760.02 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
702.00 |
$0.00 |
$219,414.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Amend written post-closure plan, as required under 40 CFR 257.104(d)(3) |
0.00 |
2.00 |
20.00 |
5.00 |
27.00 |
$1,490.77 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.104(d)(4) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
13 |
45.50 |
$8,346.39 |
|
$0.00 |
$5,993.00 |
$2,353.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
45.50 |
$0.00 |
$5,993.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare notification required under 40 CFR 257.104(e) |
0.00 |
0.50 |
0.00 |
0.00 |
0.50 |
$56.28 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Obtain certification required under 40 CFR 257.104(e) |
0.00 |
0.00 |
3.00 |
0.50 |
3.50 |
$181.03 |
$0.00 |
$461.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
1,690.50 |
$567,697.87 |
|
$0.00 |
$474,325.00 |
$93,372.87 |
|
|
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
137.00 |
1,690.50 |
$0.00 |
$474,325.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Requirements (40 CFR 257.105) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location Restrictions |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the demonstrations required under 40 CFR 257.60(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the demonstrations required under 40 CFR 257.61(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the demonstrations required under 40 CFR 257.62(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the demonstrations required under 40 CFR 257.63(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the demonstrations required under 40 CFR 257.64(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Design Criteria |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the certification required under 40 CFR 257.70(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
9 |
0.18 |
$6.39 |
|
$0.00 |
$0.00 |
$6.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
0.18 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the certification required under 40 CFR 257.70(f) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
9 |
0.18 |
$6.39 |
|
$0.00 |
$0.00 |
$6.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
0.18 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the documentation required under 40 CFR 257.71(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the certifications required under 40 CFR 257.72(c) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
4 |
0.08 |
$2.84 |
|
$0.00 |
$0.00 |
$2.84 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
0.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the certifications required under 40 CFR 257.72(d) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
4 |
0.08 |
$2.84 |
|
$0.00 |
$0.00 |
$2.84 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
0.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the documentation required under 40 CFR 257.73(a)(1) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the documentation required under 40 CFR 257.74(a)(1) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
3 |
0.06 |
$2.13 |
|
$0.00 |
$0.00 |
$2.13 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
0.06 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic hazard potential classification assessments required under 40 CFR 257.73(a)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic hazard potential classification assessments required under 40 CFR 257.74(a)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
3 |
0.06 |
$2.13 |
|
$0.00 |
$0.00 |
$2.13 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
0.06 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the EAP, and any amendment of the EAP, required under 40 CFR 257.73(a)(3) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the EAP, and any amendment of the EAP, required under 40 CFR 257.74(a)(3) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
3 |
0.06 |
$2.13 |
|
$0.00 |
$0.00 |
$2.13 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
0.06 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Requirements (40 CFR 257.105) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place documentation required under 40 257.73(a)(3)(i)(E) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
175 |
3.50 |
$124.25 |
|
$0.00 |
$0.00 |
$124.25 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
175.00 |
3.50 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 257.74(a)(3)(i)(E) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
1 |
0.02 |
$0.71 |
|
$0.00 |
$0.00 |
$0.71 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
1.00 |
0.02 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 CFR 257.73(a)(3)(v) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
4 |
0.08 |
$2.84 |
|
$0.00 |
$0.00 |
$2.84 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
0.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 CFR 257.74(a)(3)(v) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the history of construction, and any revisions of it, required under 40 CFR 257.73(c) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic structural stability assessments required under 40 CFR 257.73(d) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic structural stability assessments required under 40 CFR 257.74(d) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
2 |
0.04 |
$1.42 |
|
$0.00 |
$0.00 |
$1.42 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
0.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the action plan to remedy structural stability deficiencies required under 40 CFR 257.73(d)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the action plan to remedy structural stability deficiencies required under 40 CFR 257.74(d)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic safety factor assessments required under 40 CFR 257.73(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic safety factor assessments required under 40 CFR 257.74(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
2 |
0.04 |
$1.42 |
|
$0.00 |
$0.00 |
$1.42 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
0.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Requirements (40 CFR 257.105) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Criteria |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the CCR fugitive dust control plan, and any subsequent amendment of the plan, required under 40 CFR 257.80(b) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the annual CCR fugitive dust control report required under 40 CFR 257.80(c) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
770 |
15.40 |
$546.70 |
|
$0.00 |
$0.00 |
$546.70 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
770.00 |
15.40 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic run-on and run-off control system plans required under 40 CFR 257.81(c) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
9 |
0.18 |
$6.39 |
|
$0.00 |
$0.00 |
$6.39 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
0.18 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic inflow design flood control system plan required under 40 CFR 257.82(c) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
4 |
0.08 |
$2.84 |
|
$0.00 |
$0.00 |
$2.84 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
0.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 CFR 257.83(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
526 |
10.52 |
$373.46 |
|
$0.00 |
$0.00 |
$373.46 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
526.00 |
10.52 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the periodic inspection report required under 40 CFR 257.83(b)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
289 |
5.78 |
$205.19 |
|
$0.00 |
$0.00 |
$205.19 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
289.00 |
5.78 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the action plan required under 40 CFR 257.83(b)(5) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
5 |
0.10 |
$3.55 |
|
$0.00 |
$0.00 |
$3.55 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
5.00 |
0.10 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 CFR 257.84(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
235 |
4.70 |
$166.85 |
|
$0.00 |
$0.00 |
$166.85 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
235.00 |
4.70 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the periodic inspection report required under 40 CFR 257.84(b)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
235 |
4.70 |
$166.85 |
|
$0.00 |
$0.00 |
$166.85 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
235.00 |
4.70 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Requirements (40 CFR 257.105) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Groundwater Monitoring and Corrective Action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the annual groundwater monitoring and corrective action report required under 40 CFR 257.90(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
770 |
15.40 |
$546.70 |
|
$0.00 |
$0.00 |
$546.70 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
770.00 |
15.40 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 CFR 257.91(e)(1) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the groundwater monitoring system certification required under 40 CFR 257.91(f) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the selection of a statistical method certification required under 40 CFR 257.93(f)(6) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.94(e)(3) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
242 |
4.84 |
$171.82 |
|
$0.00 |
$0.00 |
$171.82 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
242.00 |
4.84 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the documentation required under 40 CFR 257.95(d)(1) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
485 |
9.70 |
$344.35 |
|
$0.00 |
$0.00 |
$344.35 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
485.00 |
9.70 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.94(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
242 |
4.84 |
$171.82 |
|
$0.00 |
$0.00 |
$171.82 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
242.00 |
4.84 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notifications required under 40 CFR 257.94(g) and (g)(2) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
17 |
0.34 |
$12.07 |
|
$0.00 |
$0.00 |
$12.07 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
0.34 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.95(g)(5) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
107 |
2.14 |
$75.97 |
|
$0.00 |
$0.00 |
$75.97 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
2.14 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the completed assessment of corrective measures required under 40 CFR 257.96(d) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
107 |
2.14 |
$75.97 |
|
$0.00 |
$0.00 |
$75.97 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
2.14 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place documentation required under 40 CFR 257.96(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
107 |
2.14 |
$75.97 |
|
$0.00 |
$0.00 |
$75.97 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
2.14 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the semi-annual reports describing the progress in selecting and designing the remedy required under 40 CFR 257.97(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
107 |
2.14 |
$75.97 |
|
$0.00 |
$0.00 |
$75.97 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
2.14 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the selection of remedy report required under 40 CFR 257.97(a) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
107 |
2.14 |
$75.97 |
|
$0.00 |
$0.00 |
$75.97 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
2.14 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.98(e) in the facility’s operating record |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Requirements (40 CFR 257.105) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Closure and Post-Closure Care |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the written closure plan, and any amendment of the plan, required under 40 CFR 257.102(b) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the written demonstration(s) required under 40 CFR 257.102(e)(2)(ii) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the written demonstration(s) required under 40 CFR 257.102(f)(2) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the certification required under 40 CFR 257.102(f)(3) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
17 |
0.34 |
$12.07 |
|
$0.00 |
$0.00 |
$12.07 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
0.34 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.102(g) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.102(h) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
17 |
0.34 |
$12.07 |
|
$0.00 |
$0.00 |
$12.07 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
0.34 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.102(i) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
17 |
0.34 |
$12.07 |
|
$0.00 |
$0.00 |
$12.07 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
0.34 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.103(c)(1) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the annual progress reports required under 40 CFR 257.103(c)(2) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the written post-closure plan, and any amendment of the plan, required under 40 CFR 257.104(d) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
13 |
0.26 |
$9.23 |
|
$0.00 |
$0.00 |
$9.23 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
0.26 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.104(e) in the facility’s operating record. |
0.00 |
0.00 |
0.00 |
0.02 |
0.02 |
$0.71 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Location Restrictions |
|
|
|
|
|
|
|
|
|
|
|
Provide notification that each demonstration specified under 40 CFR 257.105(e) has been placed in the operating record and on the owner or operator’s publicly accessible internet site |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
65 |
32.50 |
$1,788.15 |
|
$0.00 |
$329.55 |
$1,458.60 |
|
Reporting |
|
65.00 |
32.50 |
$0.00 |
$329.55 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Design Criteria |
|
|
|
|
|
|
|
|
|
|
|
Provide notification of the availability of the design certification specified under 40 CFR 257.105(f)(1) or (f)(3) and copy of the alternative composite liner design, if applicable. |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
26 |
13.00 |
$715.26 |
|
$0.00 |
$131.82 |
$583.44 |
|
Reporting |
|
26.00 |
13.00 |
$0.00 |
$131.82 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the construction certification specified under 40 CFR 257.105(f)(1) or (f)(3). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
26 |
13.00 |
$715.26 |
|
$0.00 |
$131.82 |
$583.44 |
|
Reporting |
|
26.00 |
13.00 |
$0.00 |
$131.82 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the documentation of liner type specified under 40 CFR 257.105(f)(2). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic hazard potential classification assessments specified under 40 CFR 257.105(f)(5). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
3 |
1.50 |
$82.53 |
|
$0.00 |
$15.21 |
$67.32 |
|
Reporting |
|
3.00 |
1.50 |
$0.00 |
$15.21 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the EAP, and any revisions of the EAP, specified under 40 CFR 257.105(f)(6). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
3 |
1.50 |
$82.53 |
|
$0.00 |
$15.21 |
$67.32 |
|
Reporting |
|
3.00 |
1.50 |
$0.00 |
$15.21 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of documentation specified under 40 CFR 257.105(f)(7). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
176 |
88.00 |
$4,841.76 |
|
$0.00 |
$892.32 |
$3,949.44 |
|
Reporting |
|
176.00 |
88.00 |
$0.00 |
$892.32 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of documentation specified under 40 CFR 257.105(f)(8). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
4 |
2.00 |
$110.04 |
|
$0.00 |
$20.28 |
$89.76 |
|
Reporting |
|
4.00 |
2.00 |
$0.00 |
$20.28 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the history of construction, and any revision of it, specified under 40 CFR 257.105(f)(9). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic structural stability assessments specified under 40 CFR 257.105(f)(10). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
2 |
1.00 |
$55.02 |
|
$0.00 |
$10.14 |
$44.88 |
|
Reporting |
|
2.00 |
1.00 |
$0.00 |
$10.14 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the action plan to remedy structural stability deficiencies specified under 40 CFR 257.105(f)(11). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic safety factor assessments specified under 40 CFR 257.105(f)(12). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the design and construction plans, and any revision of them, specified under 40 CFR 257.105(f)(13). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
2 |
1.00 |
$55.02 |
|
$0.00 |
$10.14 |
$44.88 |
|
Reporting |
|
2.00 |
1.00 |
$0.00 |
$10.14 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Operating Criteria |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide notification of the availability of the CCR fugitive dust control plan, or any subsequent amendment of the plan, specified under 40 CFR 257.105(g)(1). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
13 |
6.50 |
$357.63 |
|
$0.00 |
$65.91 |
$291.72 |
|
Reporting |
|
13.00 |
6.50 |
$0.00 |
$65.91 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the annual CCR fugitive dust control report specified under 40 CFR 257.105(g)(2). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
770 |
385.00 |
$21,182.70 |
|
$0.00 |
$3,903.90 |
$17,278.80 |
|
Reporting |
|
770.00 |
385.00 |
$0.00 |
$3,903.90 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic run-on and run-off control system plans specified under 40 CFR 257.105(g)(3). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
9 |
4.50 |
$247.59 |
|
$0.00 |
$45.63 |
$201.96 |
|
Reporting |
|
9.00 |
4.50 |
$0.00 |
$45.63 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic inflow design flood control system plans specified under 40 CFR 257.105(g)(4). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
4 |
2.00 |
$110.04 |
|
$0.00 |
$20.28 |
$89.76 |
|
Reporting |
|
4.00 |
2.00 |
$0.00 |
$20.28 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the periodic inspection reports specified under 40 CFR 257.105(g)(6). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
289 |
144.50 |
$7,950.39 |
|
$0.00 |
$1,465.23 |
$6,485.16 |
|
Reporting |
|
289.00 |
144.50 |
$0.00 |
$1,465.23 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the action plan specified under 40 CFR 257.105(g)(7). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
5 |
2.50 |
$137.55 |
|
$0.00 |
$25.35 |
$112.20 |
|
Reporting |
|
5.00 |
2.50 |
$0.00 |
$25.35 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the periodic inspection reports specified under 40 CFR 257.105(g)(9). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
235 |
117.50 |
$6,464.85 |
|
$0.00 |
$1,191.45 |
$5,273.40 |
|
Reporting |
|
235.00 |
117.50 |
$0.00 |
$1,191.45 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Groundwater Monitoring and Corrective Action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide notification of the availability of the annual groundwater monitoring and corrective action report specified under 40 CFR 257.105(h)(1). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
770 |
385.00 |
$21,182.70 |
|
$0.00 |
$3,903.90 |
$17,278.80 |
|
Reporting |
|
770.00 |
385.00 |
$0.00 |
$3,903.90 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the certification specified under 40 CFR 257.105(h)(3). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
13 |
6.50 |
$357.63 |
|
$0.00 |
$65.91 |
$291.72 |
|
Reporting |
|
13.00 |
6.50 |
$0.00 |
$65.91 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the certification specified under 40 CFR 257.105(h)(4). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
13 |
6.50 |
$357.63 |
|
$0.00 |
$65.91 |
$291.72 |
|
Reporting |
|
13.00 |
6.50 |
$0.00 |
$65.91 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification that an assessment monitoring programs has been established specified under 40 CFR 257.105(h)(5). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
242 |
121.00 |
$6,657.42 |
|
$0.00 |
$1,226.94 |
$5,430.48 |
|
Reporting |
|
242.00 |
121.00 |
$0.00 |
$1,226.94 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification that the CCR unit is returning to a detection monitoring program specified under 40 CFR 257.105(h)(7) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
242 |
121.00 |
$6,657.42 |
|
$0.00 |
$1,226.94 |
$5,430.48 |
|
Reporting |
|
242.00 |
121.00 |
$0.00 |
$1,226.94 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification that one or more constituents in Appendix IV to this part have been detected at statistically significant levels above the groundwater protection standard and the notifications to land owners specified under 40 CFR 257.105(h)(8). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
17 |
8.50 |
$467.67 |
|
$0.00 |
$86.19 |
$381.48 |
|
Reporting |
|
17.00 |
8.50 |
$0.00 |
$86.19 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification that an assessment of corrective measures has been initiated specified under 40 CFR 257.105(h)(9) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
107 |
53.50 |
$2,943.57 |
|
$0.00 |
$542.49 |
$2,401.08 |
|
Reporting |
|
107.00 |
53.50 |
$0.00 |
$542.49 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of assessment of corrective measures specified under 40 CFR 257.105(h)(10). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
107 |
53.50 |
$2,943.57 |
|
$0.00 |
$542.49 |
$2,401.08 |
|
Reporting |
|
107.00 |
53.50 |
$0.00 |
$542.49 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the semi-annual report describing the progress in selecting and designing the remedy specified under 40 CFR 257.105(h)(12) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
107 |
53.50 |
$2,943.57 |
|
$0.00 |
$542.49 |
$2,401.08 |
|
Reporting |
|
107.00 |
53.50 |
$0.00 |
$542.49 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the selection of remedy report specified under 40 CFR 257.105(h)(12). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
107 |
53.50 |
$2,943.57 |
|
$0.00 |
$542.49 |
$2,401.08 |
|
Reporting |
|
107.00 |
53.50 |
$0.00 |
$542.49 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the completion of the remedy specified under 40 CFR 257.105(h)(13). |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Closure and Post-Closure Care |
|
|
|
|
|
|
|
|
|
|
|
Provide notification of the availability of the written closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(4) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
13 |
6.50 |
$357.63 |
|
$0.00 |
$65.91 |
$291.72 |
|
Reporting |
|
13.00 |
6.50 |
$0.00 |
$65.91 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the demonstration(s) specified under 40 CFR 257.105(i)(5) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the demonstration(s) specified under 40 CFR 257.105(i)(6) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of intent to close a CCR unit specified under 40 CFR 257.105(i)(7) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of completion of closure of a CCR unit specified under 40 CFR 257.105(i)(8) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
17 |
8.50 |
$467.67 |
|
$0.00 |
$86.19 |
$381.48 |
|
Reporting |
|
17.00 |
8.50 |
$0.00 |
$86.19 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the deed notation as required by 40 CFR 257.105(i)(9) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
17 |
8.50 |
$467.67 |
|
$0.00 |
$86.19 |
$381.48 |
|
Reporting |
|
17.00 |
8.50 |
$0.00 |
$86.19 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of intent to comply with the alternative closure requirements specified under 40 CFR 257.105(i)(10) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the annual progress reports under the alternative closure requirements required under 40 CFR 257.105(i)(11) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the written post-closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(12) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
13 |
6.50 |
$357.63 |
|
$0.00 |
$65.91 |
$291.72 |
|
Reporting |
|
13.00 |
6.50 |
$0.00 |
$65.91 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of completion of post-closure care specified under 40 CFR 257.105(i)(13) |
0.00 |
0.00 |
0.25 |
0.25 |
0.50 |
$22.44 |
$0.00 |
$5.07 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Publicly Accessible Internet Site Requirements (40 CFR 257.107) |
|
|
|
|
|
|
|
|
|
|
|
Develop Internet Site |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Develop publicly accessible internet site (CCR website) containing the information specified at 40 CFR 257.107 |
0.00 |
2.00 |
10.00 |
0.00 |
12.00 |
$769.72 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Location Restrictions |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place each demonstration specified under 40 CFR 257.105(e) on the owner or operator’s CCR website |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
26 |
8.58 |
$467.22 |
|
$0.00 |
$0.00 |
$467.22 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
26.00 |
8.58 |
$0.00 |
$0.00 |
|
Design Criteria |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the certification required under 40 CFR 257.105(f)(1) or (f)(3) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
26 |
8.58 |
$467.22 |
|
$0.00 |
$0.00 |
$467.22 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
26.00 |
8.58 |
$0.00 |
$0.00 |
|
Place the certification specified under 40 CFR 257.105(f)(1) or (f)(3) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
26 |
8.58 |
$467.22 |
|
$0.00 |
$0.00 |
$467.22 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
26.00 |
8.58 |
$0.00 |
$0.00 |
|
Place he documentation specified under 40 CFR 257.105(f)(2) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic hazard potential classification assessments specified under 40 CFR 257.105(f)(5) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the EAP specified under 40 CFR 257.105(f)(6) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
3 |
0.99 |
$53.91 |
|
$0.00 |
$0.00 |
$53.91 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
3.00 |
0.99 |
$0.00 |
$0.00 |
|
Place documentation specified under 40 CFR 257.105(f)(7) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
176 |
58.08 |
$3,162.72 |
|
$0.00 |
$0.00 |
$3,162.72 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
176.00 |
58.08 |
$0.00 |
$0.00 |
|
Place documentation specified under 40 CFR 257.105(f)(8) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
4 |
1.32 |
$71.88 |
|
$0.00 |
$0.00 |
$71.88 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
1.32 |
$0.00 |
$0.00 |
|
Place the history of construction, and any revisions of it, specified under 40 CFR 257.105(f)(9) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic structural stability assessments specified under 40 CFR 257.105(f)(10) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
2 |
0.66 |
$35.94 |
|
$0.00 |
$0.00 |
$35.94 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
0.66 |
$0.00 |
$0.00 |
|
Place the action plan to remedy structural stability deficiencies specified under 40 CFR 257.105(f)(11) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the initial and periodic safety factor assessments specified under 40 CFR 257.105(f)(12) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the design and construction plans, and any revisions of them, specified under 40 CFR 257.105(f)(13) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
2 |
0.66 |
$35.94 |
|
$0.00 |
$0.00 |
$35.94 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
2.00 |
0.66 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Publicly Accessible Internet Site Requirements (40 CFR 257.107) |
|
|
|
|
|
|
|
|
|
|
|
Operating Criteria |
|
|
|
|
|
|
|
|
|
|
|
Place the CCR fugitive dust control plan, or any subsequent amendment of the plan, specified under 40 CFR 257.105(g)(1) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
13 |
4.29 |
$233.61 |
|
$0.00 |
$0.00 |
$233.61 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
4.29 |
$0.00 |
$0.00 |
|
Place the annual CCR fugitive dust control report specified under 40 CFR 257.105(g)(2) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
770 |
254.10 |
$13,836.90 |
|
$0.00 |
$0.00 |
$13,836.90 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
770.00 |
254.10 |
$0.00 |
$0.00 |
|
Place the initial and periodic run-on and run-off control system plans specified under 40 CFR 257.105(g)(3) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
9 |
2.97 |
$161.73 |
|
$0.00 |
$0.00 |
$161.73 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
9.00 |
2.97 |
$0.00 |
$0.00 |
|
Place the initial and periodic inflow design flood control system plans specified under 40 CFR 257.105(g)(4) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
4 |
1.32 |
$71.88 |
|
$0.00 |
$0.00 |
$71.88 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
4.00 |
1.32 |
$0.00 |
$0.00 |
|
Place the periodic inspection reports specified under 40 CFR 257.105(g)(6) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
289 |
95.37 |
$5,193.33 |
|
$0.00 |
$0.00 |
$5,193.33 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
289.00 |
95.37 |
$0.00 |
$0.00 |
|
Place the action plan specified under 40 CFR 257.105(g)(7) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
5 |
1.65 |
$89.85 |
|
$0.00 |
$0.00 |
$89.85 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
5.00 |
1.65 |
$0.00 |
$0.00 |
|
Place the periodic inspection reports specified under 40 CFR 257.105(g)(9) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
235 |
77.55 |
$4,222.95 |
|
$0.00 |
$0.00 |
$4,222.95 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
235.00 |
77.55 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Publicly Accessible Internet Site Requirements (40 CFR 257.107) |
|
|
|
|
|
|
|
|
|
|
|
Groundwater Monitoring and Corrective Action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the annual groundwater monitoring and corrective action report specified under 40 CFR 257.105(h)(1) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
770 |
254.10 |
$13,836.90 |
|
$0.00 |
$0.00 |
$13,836.90 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
770.00 |
254.10 |
$0.00 |
$0.00 |
|
Place the certification specified under 40 CFR 257.105(h)(3) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
13 |
4.29 |
$233.61 |
|
$0.00 |
$0.00 |
$233.61 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
4.29 |
$0.00 |
$0.00 |
|
Place the certification specified under 40 CFR 257.105(h)(4) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
13 |
4.29 |
$233.61 |
|
$0.00 |
$0.00 |
$233.61 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
4.29 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(h)(5) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
242 |
79.86 |
$4,348.74 |
|
$0.00 |
$0.00 |
$4,348.74 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
242.00 |
79.86 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(h)(7) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
242 |
79.86 |
$4,348.74 |
|
$0.00 |
$0.00 |
$4,348.74 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
242.00 |
79.86 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(h)(8) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
17 |
5.61 |
$305.49 |
|
$0.00 |
$0.00 |
$305.49 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
5.61 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(h)(9) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
107 |
35.31 |
$1,922.79 |
|
$0.00 |
$0.00 |
$1,922.79 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
35.31 |
$0.00 |
$0.00 |
|
Place the assessment of corrective measures specified under 40 CFR 257.105(h)(10) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
107 |
35.31 |
$1,922.79 |
|
$0.00 |
$0.00 |
$1,922.79 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
35.31 |
$0.00 |
$0.00 |
|
Place the semi-annual reports describing the progress in selecting and designing the remedy required under 40 CFR 257.105(h)(12) on the owner or operator’s CCR website |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
107 |
35.31 |
$1,922.79 |
|
$0.00 |
$0.00 |
$1,922.79 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
35.31 |
$0.00 |
$0.00 |
|
Place the selection of remedy report specified under 40 CFR 257.105(h)(12) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
107 |
35.31 |
$1,922.79 |
|
$0.00 |
$0.00 |
$1,922.79 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
107.00 |
35.31 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(h)(13) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-6 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - OWNERS AND OPERATORS OF CCR UNITS a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$140.50/ |
$112.56/ |
$54.46/ |
$35.29/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Publicly Accessible Internet Site Requirements (40 CFR 257.107) |
|
|
|
|
|
|
|
|
|
|
|
Closure and Post-Closure Care |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place the written closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(4) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
13 |
4.29 |
$233.61 |
|
$0.00 |
$0.00 |
$233.61 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
4.29 |
$0.00 |
$0.00 |
|
Place the demonstration(s) specified under 40 CFR 257.105(i)(5) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the demonstration(s) specified under 40 CFR 257.105(i)(6) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(i)(7) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(i)(8) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
17 |
5.61 |
$305.49 |
|
$0.00 |
$0.00 |
$305.49 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
5.61 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.105(i)(9) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
17 |
5.61 |
$305.49 |
|
$0.00 |
$0.00 |
$305.49 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
17.00 |
5.61 |
$0.00 |
$0.00 |
|
Place the notification required under 40 CFR 257.105(i)(10) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the annual progress reports required under 40 CFR 257.105(i)(11) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Place the written post-closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(12) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
13 |
4.29 |
$233.61 |
|
$0.00 |
$0.00 |
$233.61 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
13.00 |
4.29 |
$0.00 |
$0.00 |
|
Place the notification specified under 40 CFR 257.105(i)(13) on the owner or operator’s CCR website. |
0.00 |
0.00 |
0.33 |
0.00 |
0.33 |
$17.97 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Disclosure |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
2,917.79 |
$158,042.09 |
|
$0.00 |
$17,324.19 |
$140,717.90 |
|
|
|
3,417.00 |
1,708.50 |
$0.00 |
$17,324.19 |
|
4,777.00 |
95.54 |
$0.00 |
$0.00 |
|
3,375.00 |
1,113.75 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - STATE GOVERNMENT AGENCIES AND TRIBAL AUTHORITIES a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$97.87/ |
$95.19/ |
$55.84/ |
$37.23/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Location Restrictions |
|
|
|
|
|
|
|
|
|
|
|
Review notification that each demonstration specified under 40 CFR 257.105(e) has been placed in the operating record and on the owner or operator’s publicly accessible internet site |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
65 |
5.20 |
$290.55 |
|
$0.00 |
$0.00 |
$290.55 |
|
Reporting |
|
65.00 |
5.20 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Design Criteria |
|
|
|
|
|
|
|
|
|
|
|
Review notification of the availability of the design certification specified under 40 CFR 257.105(f)(1) or (f)(3) and copy of the alternative composite liner design, if applicable. |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
26 |
2.08 |
$116.22 |
|
$0.00 |
$0.00 |
$116.22 |
|
Reporting |
|
26.00 |
2.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the construction certification specified under 40 CFR 257.105(f)(1) or (f)(3). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
26 |
2.08 |
$116.22 |
|
$0.00 |
$0.00 |
$116.22 |
|
Reporting |
|
26.00 |
2.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the documentation of liner type specified under 40 CFR 257.105(f)(2). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the initial and periodic hazard potential classification assessments specified under 40 CFR 257.105(f)(5). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
3 |
0.24 |
$13.41 |
|
$0.00 |
$0.00 |
$13.41 |
|
Reporting |
|
3.00 |
0.24 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the EAP, and any revisions of the EAP, specified under 40 CFR 257.105(f)(6). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
3 |
0.24 |
$13.41 |
|
$0.00 |
$0.00 |
$13.41 |
|
Reporting |
|
3.00 |
0.24 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of documentation specified under 40 CFR 257.105(f)(7). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
176 |
14.08 |
$786.72 |
|
$0.00 |
$0.00 |
$786.72 |
|
Reporting |
|
176.00 |
14.08 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of documentation specified under 40 CFR 257.105(f)(8). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
4 |
0.32 |
$17.88 |
|
$0.00 |
$0.00 |
$17.88 |
|
Reporting |
|
4.00 |
0.32 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the history of construction, and any revision of it, specified under 40 CFR 257.105(f)(9). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the initial and periodic structural stability assessments specified under 40 CFR 257.105(f)(10). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
2 |
0.16 |
$8.94 |
|
$0.00 |
$0.00 |
$8.94 |
|
Reporting |
|
2.00 |
0.16 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the action plan to remedy structural stability deficiencies specified under 40 CFR 257.105(f)(11). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the initial and periodic safety factor assessments specified under 40 CFR 257.105(f)(12). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the design and construction plans, and any revision of them, specified under 40 CFR 257.105(f)(13). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
2 |
0.16 |
$8.94 |
|
$0.00 |
$0.00 |
$8.94 |
|
Reporting |
|
2.00 |
0.16 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-7 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - STATE GOVERNMENT AGENCIES AND TRIBAL AUTHORITIES a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$97.87/ |
$95.19/ |
$55.84/ |
$37.23/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Operating Criteria |
|
|
|
|
|
|
|
|
|
|
|
Provide notification of the availability of the CCR fugitive dust control plan, or any subsequent amendment of the plan, specified under 40 CFR 257.105(g)(1). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
13 |
1.04 |
$58.11 |
|
$0.00 |
$0.00 |
$58.11 |
|
Reporting |
|
13.00 |
1.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the annual CCR fugitive dust control report specified under 40 CFR 257.105(g)(2). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
770 |
61.60 |
$3,441.90 |
|
$0.00 |
$0.00 |
$3,441.90 |
|
Reporting |
|
770.00 |
61.60 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic run-on and run-off control system plans specified under 40 CFR 257.105(g)(3). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
9 |
0.72 |
$40.23 |
|
$0.00 |
$0.00 |
$40.23 |
|
Reporting |
|
9.00 |
0.72 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the initial and periodic inflow design flood control system plans specified under 40 CFR 257.105(g)(4). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
4 |
0.32 |
$17.88 |
|
$0.00 |
$0.00 |
$17.88 |
|
Reporting |
|
4.00 |
0.32 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the periodic inspection reports specified under 40 CFR 257.105(g)(6). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
289 |
23.12 |
$1,291.83 |
|
$0.00 |
$0.00 |
$1,291.83 |
|
Reporting |
|
289.00 |
23.12 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the action plan specified under 40 CFR 257.105(g)(7). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
5 |
0.40 |
$22.35 |
|
$0.00 |
$0.00 |
$22.35 |
|
Reporting |
|
5.00 |
0.40 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Provide notification of the availability of the periodic inspection reports specified under 40 CFR 257.105(g)(9). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
235 |
18.80 |
$1,050.45 |
|
$0.00 |
$0.00 |
$1,050.45 |
|
Reporting |
|
235.00 |
18.80 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-7 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - STATE GOVERNMENT AGENCIES AND TRIBAL AUTHORITIES a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$97.87/ |
$95.19/ |
$55.84/ |
$37.23/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Groundwater Monitoring and Corrective Action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review notification of the availability of the annual groundwater monitoring and corrective action report specified under 40 CFR 257.105(h)(1). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
770 |
61.60 |
$3,441.90 |
|
$0.00 |
$0.00 |
$3,441.90 |
|
Reporting |
|
770.00 |
61.60 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the certification specified under 40 CFR 257.105(h)(3). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
13 |
1.04 |
$58.11 |
|
$0.00 |
$0.00 |
$58.11 |
|
Reporting |
|
13.00 |
1.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the certification specified under 40 CFR 257.105(h)(4). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
13 |
1.04 |
$58.11 |
|
$0.00 |
$0.00 |
$58.11 |
|
Reporting |
|
13.00 |
1.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification that an assessment monitoring programs has been established specified under 40 CFR 257.105(h)(5). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
242 |
19.36 |
$1,081.74 |
|
$0.00 |
$0.00 |
$1,081.74 |
|
Reporting |
|
242.00 |
19.36 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification that the CCR unit is returning to a detection monitoring program specified under 40 CFR 257.105(h)(7) |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
242 |
19.36 |
$1,081.74 |
|
$0.00 |
$0.00 |
$1,081.74 |
|
Reporting |
|
242.00 |
19.36 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification that one or more constituents in Appendix IV to this part have been detected at statistically significant levels above the groundwater protection standard and the notifications to land owners specified under 40 CFR 257.105(h)(8). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
17 |
1.36 |
$75.99 |
|
$0.00 |
$0.00 |
$75.99 |
|
Reporting |
|
17.00 |
1.36 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification that an assessment of corrective measures has been initiated specified under 40 CFR 257.105(h)(9) |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
107 |
8.56 |
$478.29 |
|
$0.00 |
$0.00 |
$478.29 |
|
Reporting |
|
107.00 |
8.56 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of assessment of corrective measures specified under 40 CFR 257.105(h)(10). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
107 |
8.56 |
$478.29 |
|
$0.00 |
$0.00 |
$478.29 |
|
Reporting |
|
107.00 |
8.56 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the semi-annual report describing the progress in selecting and designing the remedy specified under 40 CFR 257.105(h)(12) |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
107 |
8.56 |
$478.29 |
|
$0.00 |
$0.00 |
$478.29 |
|
Reporting |
|
107.00 |
8.56 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the selection of remedy report specified under 40 CFR 257.105(h)(12). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
107 |
8.56 |
$478.29 |
|
$0.00 |
$0.00 |
$478.29 |
|
Reporting |
|
107.00 |
8.56 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the completion of the remedy specified under 40 CFR 257.105(h)(13). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-7 (continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - STATE GOVERNMENT AGENCIES AND TRIBAL AUTHORITIES a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$97.87/ |
$95.19/ |
$55.84/ |
$37.23/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Recordkeeping, Notification, and Posting of Information to the Internet |
|
|
|
|
|
|
|
|
|
|
|
Notification Requirements (40 CFR 257.106) |
|
|
|
|
|
|
|
|
|
|
|
Closure and Post-Closure Care |
|
|
|
|
|
|
|
|
|
|
|
Review notification of the availability of the written closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(4). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
13 |
1.04 |
$58.11 |
|
$0.00 |
$0.00 |
$58.11 |
|
Reporting |
|
13.00 |
1.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the demonstration(s) specified under 40 CFR 257.105(i)(5). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the demonstration(s) specified under 40 CFR 257.105(i)(6). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of intent to close a CCR unit specified under 40 CFR 257.105(i)(7). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of completion of closure of a CCR unit specified under 40 CFR 257.105(i)(8) |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
17 |
1.36 |
$75.99 |
|
$0.00 |
$0.00 |
$75.99 |
|
Reporting |
|
17.00 |
1.36 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the deed notation as required by 40 CFR 257.105(i)(9). (40 CFR 257.106(i)(9)) |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
17 |
1.36 |
$75.99 |
|
$0.00 |
$0.00 |
$75.99 |
|
Reporting |
|
17.00 |
1.36 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of intent to comply with the alternative closure requirements specified under 40 CFR 257.105(i)(10) |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the annual progress reports under the alternative closure requirements required under 40 CFR 257.105(i)(11). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the written post-closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(12). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
13 |
1.04 |
$58.11 |
|
$0.00 |
$0.00 |
$58.11 |
|
Reporting |
|
13.00 |
1.04 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Review notification of the availability of the written post-closure plan, and any amendment of the plan, specified under 40 CFR 257.105(i)(12). |
0.00 |
0.00 |
0.08 |
0.00 |
0.08 |
$4.47 |
$0.00 |
$0.00 |
0 |
0.00 |
$0.00 |
|
$0.00 |
$0.00 |
$0.00 |
|
Reporting |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
273.36 |
$15,273.99 |
|
$0.00 |
$0.00 |
$15,273.99 |
|
|
|
3,417.00 |
273.36 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-8a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL RESPONDENT HOUR AND COST BURDEN - STATE GOVERNMENT AGENCIES AND TRIBAL AUTHORITIES a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
Reporting |
|
Recordkeeping |
|
Third Party Disclosure |
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
Total |
Total |
|
|
|
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
Number |
Total |
Total |
Total |
|
|
$97.87/ |
$95.19/ |
$55.84/ |
$37.23/ |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
Capital Cost/ |
O&M Cost/ |
Total Labor |
|
Type of |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
Responses/ |
Hours/ |
Capital Cost/ |
O&M Cost/ |
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
Year |
Year |
Costs/Year |
|
Activity |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Year |
Year |
Year |
Year |
|
Solid Waste Management Plans |
|
|
|
|
|
|
|
|
|
|
|
Prepare solid waste management plan |
80.00 |
80.00 |
500.00 |
20.00 |
680.00 |
$44,109.40 |
$0.00 |
$0.00 |
1 |
680.00 |
$44,109.40 |
|
$0.00 |
$0.00 |
$44,109.40 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
1.00 |
680.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
Prepare state CCR permit program application |
120.00 |
95.00 |
600.00 |
20.00 |
835.00 |
$55,036.05 |
$0.00 |
$0.00 |
7 |
5,845.00 |
$385,252.35 |
|
$0.00 |
$0.00 |
$385,252.35 |
|
Recordkeeping |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
7.00 |
5,845.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
6,525.00 |
$429,361.75 |
|
$0.00 |
$0.00 |
$429,361.75 |
|
|
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
8.00 |
6,525.00 |
$0.00 |
$0.00 |
|
0.00 |
0.00 |
$0.00 |
$0.00 |
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT 8b |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED ANNUAL AGENCY HOUR AND COST BURDEN - AGENCY a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hours and Costs Per Respondent Per Activity |
Total Hours and Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Leg. |
Mgr. |
Tech. |
Cler. |
Respon. |
Labor |
Capital/ |
|
Number of |
Total |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$102.11 |
$90.10 |
$64.82 |
$27.65 |
Hours/ |
Cost/ |
Startup |
O&M |
Respon. |
Hours/ |
Cost/ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INFORMATION COLLECTION ACTIVITY |
Hour |
Hour |
Hour |
Hour |
Activity |
Activity |
Cost |
Cost |
Activities |
Year |
Year |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Solid Waste Management Plans |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review and approve solid waste management plan submitted by State |
12.00 |
32.00 |
80.00 |
5.00 |
129.00 |
$9,431.94 |
$0.00 |
$0.00 |
1 |
129.00 |
$9,431.94 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review and approve state CCR permit program application submitted by State |
38.00 |
47.00 |
120.00 |
5.00 |
210.00 |
$16,030.93 |
$0.00 |
$0.00 |
7 |
1,470.00 |
$112,216.50 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
Varies |
Varies |
Varies |
Varies |
Varies |
Varies |
$0.00 |
Varies |
Varies |
1,599.00 |
$121,648.44 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXHIBIT CCR-9 |
|
|
|
|
|
|
|
DISPOSAL OF COAL COMBUSTION RESIDUALS FROM ELECTRIC UTILITIES |
|
|
|
|
|
|
|
TOTAL ESTIMATED RESPONDENT HOUR AND COST BURDEN SUMMARY a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Annual Burden Hours |
Annual Labor Cost |
Annual Capital/ Startup Cost |
Annual O&M Cost |
Total Annual Cost |
|
Check |
Location Restrictions (Exhibit 1) |
865.75 |
$62,552.73 |
$0.00 |
$29,965.00 |
$92,517.73 |
|
$92,517.73 |
Design Criteria (Exhibit 2) |
606.75 |
$35,232.90 |
$0.00 |
$20,661.00 |
$55,893.90 |
|
$55,893.90 |
Operating Criteria (Exhibit 3) |
128,196.50 |
$7,960,166.27 |
$0.00 |
$100,035.00 |
$8,060,201.27 |
|
$8,060,201.27 |
Groundwater Monitoring and Corrective Action (Exhibit 4) |
32,007.35 |
$1,920,128.61 |
$0.00 |
$14,869,116.00 |
$16,789,244.61 |
|
$16,789,244.61 |
Closure and Post-Closure Care (Exhibit 5) |
1,690.50 |
$93,372.87 |
$0.00 |
$474,325.00 |
$567,697.87 |
|
$567,697.87 |
operators reporting |
163,366.85 |
10,071,453.38 |
0.00 |
15,494,102.00 |
25,565,555.38 |
|
|
Recordkeeping, Notification, and Posting of Information to the Internet - Owners and Operators of CCR Units (Exhibit 6) |
2,917.79 |
$140,717.90 |
$0.00 |
$17,324.19 |
$158,042.09 |
|
$158,042.09 |
operators subtotal |
166,284.64 |
10,212,171.28 |
0.00 |
15,511,426.19 |
25,723,597.47 |
|
|
Recordkeeping, Notification, and Posting of Information to the Internet - State Government Agencies and Tribal Authorities (Exhibit 7) |
273.36 |
$15,273.99 |
$0.00 |
$0.00 |
$15,273.99 |
|
$15,273.99 |
Solid Waste Management Plans (Exhibit 8a) |
6,525.00 |
$429,361.75 |
$0.00 |
$0.00 |
$429,361.75 |
|
$429,361.75 |
SLTs subtotal |
6,798.36 |
444,635.74 |
0.00 |
0.00 |
444,635.74 |
|
|
Total |
173,083 |
10,656,807 |
0 |
15,511,426 |
26,168,233 |
|
|
3-year Total |
519,249 |
$31,970,420 |
$0 |
$46,534,279 |
$78,504,699 |
|
|
a Exhibit includes rounding error. |
|
|
|
|
|
|
|