Soc-qi/mf.1 Survey Of Construction Multifamily Buildings

Survey of Housing Starts, Sales, and Completions

Attachment B - SOC-QI MF.1

Survey of Housing Starts, Sales, and Completions

OMB: 0607-0110

Document [pdf]
Download: pdf | pdf
FORM SOC-QI/MF.1
(04-07-2021)

OMB No. 0607-0110: Approval Expires 03-31-2024
U.S. DEPARTMENT OF COMMERCE
U.S. CENSUS BUREAU

SURVEY OF CONSTRUCTION
MULTIFAMILY BUILDINGS

Title 13, United States Code (U.S.C.), Sections 131, 182, and 8(b), Title 12 U.S.C., Sections 1701z-1 and 1701z-2g, authorizes the Census Bureau to conduct this collection and
to request your voluntary assistance. The U.S. Census Bureau is required by Section 9 of Title 13 to keep your information confidential and can use your responses only to
produce statistics. The Census Bureau is not permitted to publicly release your responses in a way that could identify your business, organization, or institution. Per the Federal
Cybersecurity Enhancement Act of 2015, your data are protected from cybersecurity risks through screening of the systems that transmit your data. The eight-digit OMB
number is 0607-0110 and appears in the upper right corner of this page. Without this approval, we cannot conduct this survey. We estimate this survey will take an average of
5 minutes to complete an interview. More information about this estimate and an address where you may write with comments is in the letter that accompanies this form.

TO BE COMPLETED BY CENSUS FIELD REPRESENTATIVE
Address or location of building

Builder/Owner

SAMPLE FORM
Building permit number

PSU

Project Name
BPOID

Permit Month Day
Issued:

Year Block Lot

Serving post office, State, ZIP Code
RO

TO BE COMPLETED BY RESPONDENT
Month

START_DATE

Year

When did excavation start for the footings or
foundation of this building?

DEVELOPMENT
Will this building be in a development that is
age-restricted?

EXCOMP_DATE

Month

Year

1

Yes
No

2

When do you expect at least half of the units
to be available for occupancy?

MANUFACTURE
Month

COMP_DATE

Year

Will this building be –
1

When were half of the units in this building
available for occupancy?

2
3

Modular?
Panelized?
Site built?

BUILDINGS
FRAMING

Will this project be –
1

Detached Housing Unit

What primary material is being used for the structural
framing of this building?

2

Stacked Building

3

Side-by-Side Building

1

Wood

4

Mixture of Units Building

2

More than One Building - Skip to TOTAL_UNITS

3

Steel
Concrete/masonry other than insulated concrete forms

4

Insulated concrete forms or SIP

5

Other – Specify

5

BUILDING_UNITS
How many total housing units
will there be in this building?

TOTALSQFOOT
Skip to

TOTAL_UNITS
How many total housing units will these
buildings cover?

FLOORS

What will be the total square foot area of this building?
Of this total, what will be the residential square foot area
(excluding boiler rooms, garage space, etc.)?

FLOORS

How many total floors will be in this building,
excluding the basement?
How many floors will be residential?
IF_ATTACHED
Will any of the units be attached side-by-side
with no other units above or below?
1

Yes

2

No

SOC-QI/MF.1 PAGE 1, BLACK 100% TONE

How many units will have –
no separate bedrooms (efficiency)?

EFFICIENCY

one bedroom?

ONE_BEDROOMS

two bedrooms?

TWO_BEDROOMS

three or more bedrooms?

THREE_BEDROOMS

PLEASE CONTINUE ON REVERSE SIDE

SOC-QI/MF.1 PAGE 1, PANTONE YELLOW 102 - 100% and 40% TONE

PRIMARYSOURCE

How many units will have –
one bathroom?

ONE_BATHROOMS

one and a half bathrooms?

1_1/2 BATHROOMS

two bathrooms or more?

TWO_BATHROOMS

What principal energy source will be used for heating this
building?
1

7

Electricity
Natural Gas
Bottled or liquefied Gas (including propane)
Oil (including heating oil or kerosene)
Wood (including pellets)
Solar
Coal

8

Other – Specify

2

FIREPLACE

3

How many units will have a built-in fireplace?

6

LAUNDRY
What laundry facilities will this building have?
1
2

4
5

Individual washer/dryer connections in every unit
Shared laundry facilities

3

Both individual washer/dryer connections and
shared laundry facilities

4

No shared laundry facilities or individual
washer/dryer connections

AIRCONDITIONING
Will this building have air-conditioning?
1

Yes

2

No

OWNERSHIP

HEATSYS
What type of heating system will be used in this building?
Air-source heat pump
2

Will the units in this building be –
1

For rent?
For sale?

3

Ground-source heat pump

4

Forced-air furnace

5

Hot water or steam

6

Electric baseboard

7

Fireplace with insert

8

Solid stove

1

Within the Building

Liquid stove

2

Within the Complex

10

Passive Solar

3

Both

11

No heat

4

Other/None

12

Other - Specify

9

2

PARKING
Will this building be in a complex that has a parking garage?

Please visit our website at: www.census.gov/starts
NOTES:

PLEASE RETAIN THIS FORM FOR YOUR USE WHEN CONTACTED BY YOUR CENSUS REPRESENTATIVE
FORM SOC-QI/MF.1 (04-06-2018)

SOC-QI/MF.1 PAGE 2, BLACK 100% TONE

SOC-QI/MF.1 PAGE 2, PANTONE YELLOW 102 - 100% and 40% TONE


File Typeapplication/pdf
File Titleuntitled
File Modified2023-10-05
File Created2011-11-07

© 2024 OMB.report | Privacy Policy