pdfCHIPS for America Guide
July 21, 2023
Funding Opportunity – Commercial Fabrication Facilities
GUIDE: Statement of Interest
Submission of a statement of interest (SOI) is required to be eligible to submit a pre-application or an
application.
Submitting an SOI does not obligate a potential applicant to submit a pre-application or an application. SOIs are
not subject to merit review but will be used for internal planning purposes. The program office will use your SOI
to gauge overall interest in the program, assess the types of projects and applicants who are interested in these
funding streams, and estimate staffing for subsequent pre-applications and applications.
Your SOI must be submitted a minimum of 21 days prior to submitting a pre-application or full application. Refer
to the CHIPS Incentives Program—Commercial Fabrication Facilities Notice of Funding Opportunity (CHIPS-CFF
NOFO) Section IV.G. and the Frequently Asked Questions page on the CHIPS website for information on the SOI.
While the current NOFO only permits applications for the types of commercial fabrication facilities described in
the NOFO, submissions of SOIs for future CHIPS NOFOs on semiconductor materials or equipment for which
capital expenditures are less than $300 million and research and development facilities will be accepted at this
time. Potential applicants should not expect to receive any feedback on their SOI other than a message
confirming receipt. An organization may submit only one SOI for each expected application.
SOIs must contain the following information (submitted via the CHIPS Incentives Application Portal):
Potential Applicant Information
•
Potential Applicant Name: Provide the legal name of the entity potentially applying for CHIPS
Incentives.
•
Corporate Parent Name: Provide the legal name of the corporate parent of the entity potentially
applying for CHIPS Incentives.
•
Organization Website: Provide a URL address for the applying entity’s website (or corporate parent if
entity does not have a website).
•
Have you registered for SAM.gov?: Choose “Yes” or “No” from the dropdown menu to indicate whether
the potential applicant has applied for an account in the federal government’s System for Award
Management (SAM.gov). Potential applicants are strongly encouraged to begin the process of
registering for SAM.gov and obtaining a UEI as early as possible. While this process ordinarily takes
between three days and two weeks, in some circumstances it can take six or more months to complete
due to information verification requirements. CPO is unable to issue a CHIPS Incentive to an entity that
lacks a UEI.
1
CHIPS for America Guide
•
UEI # [Optional]: If the entity has already received a Unique Entity Identifier (UEI) via SAM.gov, enter the
number. If the entity has not yet received a UEI, leave this box blank.
•
Are there other entities (e.g., customers, suppliers, investors, advisors) you anticipate partnering with
in a meaningful way?: Choose “Yes”, “No”, or “Not Determined at this Time” from the dropdown menu
to indicate whether the potential applicant anticipates partnering with other entities.
o
•
Please describe any potential partners referred to above: (only if “yes” is selected) Provide a
description of the potential partners (maximum 1500 characters).
Contact Information: Provide details necessary to reach the potential applicant’s point of contact,
including
o
Title: The official title of the point of contact at the applying entity
o
Name: The full name of the point of contact
o
Email: A business email for the point of contact associated with the potential applicant
o
Phone: A day-time phone number for the point of contact
o
Mailing Address: A business mailing address to reach the point of contact to include:
▪
Street Address
▪
City
▪
State
▪
ZIP Code
▪
For foreign addresses, this will include equivalent information including Country
Project Information
•
Project(s) Description: Provide a description of the construction, expansion, or modernization activities
for each proposed facility at a single location, the resulting products that will be manufactured,
information on the scale, size, and capacity of production, and any known timelines (maximum 1500
characters).
•
Product End Market Application: Provide a description of the types of customers and end markets that
will be served by the technology being produced by each proposed facility.(maximum 500 characters).
•
Site location: Provide the City, State, and Zip Code where the proposed facility will be located. If the
location has not yet been determined, leave blank and mark “Not determined at this time.”
•
Project Type(s): Choose from the dropdown menu to indicate whether the project(s) proposes the
construction of a new facility, the expansion or modernization of an existing facility, or both. Refer to
section I.B.1. in the CHIPS-CFF NOFO for more information on Project Types.
•
Facility Type(s): Choose from the provided options to indicate the type(s) of facility or facilities proposed
for this project. Select all options that apply. Refer to section I.B.1. in the CHIPS-CFF NOFO for details on
each of the possible Facility Types.
2
CHIPS for America Guide
•
o
Leading-Edge Facilities that utilize the most advanced front-end fabrication processes for logic, 3D
NAND Flash, and Dynamic Random-Access Memory (DRAM) semiconductors.
o
Current-Generation Facilities that produce semiconductors based on 5 nm to 28 nm process
technologies, and include logic, analog, and mixed-signal devices.
o
Mature-Node Facilities that include logic and analog produced with process technologies above 28
nm, discrete semiconductors, optoelectronics, and sensors
o
Back-end Production Facilities for the assembly, testing, or packaging of semiconductors that have
completed the front-end fabrication process.
o
Wafer Manufacturing Facilities for the high-volume production of semiconductor wafers, including
wafers made from silicon, silicon carbide, and gallium nitride. These facilities are the sites of ingot
production and wafer slicing, lapping, polishing, cleaning and inspection.
o
Semiconductor Materials and Manufacturing Equipment Facilities (if project capital expenditures
are greater than or equal to $300 million included in this NOFO, otherwise included in future NOFO)
o
Semiconductor Materials Facilities for the manufacture or production, including growth or
extraction, of materials used to manufacture semiconductors, which are the chemicals, gases, raw
and intermediate materials, and other consumables used in semiconductor manufacturing.
o
Semiconductor Manufacturing Equipment Facilities for the physical production of specialized
equipment integral to the manufacturing of semiconductors and subsystems that enable or are
incorporated into the manufacturing equipment.
o
Research & Development Facilities (included in future NOFO)
o
Other: if “other” is selected for Facility Type, provide a description for the facility in the space
provided
If the project includes a Leading-Edge Facility, a Current-Generation Facility, a Mature-Node Facility, or a
Back-end Production Facility, a second question will appear for each selection regarding the technology
type of the facility.
o
o
If Leading-Edge Facilities is selected, choose one of the following Technology Type options. If
“Other” is selected, please specify the technology type:
▪
Logic (below 5nm processes)
▪
3D NAND Flash Memory (200 layers or above)
▪
Dynamic Random-Access Memory (DRAM) (half-pitch of 13nm and below)
▪
Other
If Current-Generation Facilities is selected, choose one of the following Technology Type options. If
“Other” is selected, please specify the technology type:
▪
Logic (between 5nm and 28nm processes)
3
CHIPS for America Guide
o
o
o
•
•
▪
Analog (between 5nm and 28nm processes)
▪
Mixed-Signal (between 5nm and 28nm processes)
▪
Other
If Mature-Node Facilities is selected, choose one of the following Technology Type options. If
“Other” is selected, please specify the technology type:
▪
Logic (above 28nm processes)
▪
Analog (above 28nm processes)
▪
Discrete semiconductors
▪
Optoelectronics
▪
Sensors
▪
Other
If Back-end Production Facilities is selected, choose one of the following Technology Type options. If
“Other” is selected, please specify the technology type:
▪
Advanced Packaging
▪
Other
If Semiconductor Materials and Manufacturing Equipment Facilities is selected, provide a
description of the primary materials or equipment that will be produced at the facility (max. 100
words)
Expected Total Capital Expenditures for all proposed projects:
o
Provide an estimated range of total capital expenditures for all proposed projects (provide minimum
and maximum). Total capital expenditures refers to expenses incurred in the construction or
improvement of physical assets, such as the costs of land, building and construction, equipment and
installation, physical improvements, and working capital during the construction phase. Potential
applicants should provide the estimated range on a best-effort basis; figures provided are expected
to be preliminary high-level estimates and should be refined with greater detail in future application
steps.
o
Potential applicants may optionally provide commentary on the estimated Total Capital
Expenditures for all proposed projects range, which could include a description of the key cost
drivers, an explanation if the range provided is large, or other supporting details; if the proposed
application is expected to include more than one project, information should be provided for each
project, to the extent feasible (maximum 500 characters).
Estimated peak monthly unit production capacity: provide an estimated number of units produced
when the facility reaches peak production. Specify what the units being produced are (e.g., wafers,
components).
o
If the facility will not have any production capacity, leave the box blank and select “Not Applicable.”
4
CHIPS for America Guide
CHIPS Application Information
•
Do you expect your next submission to be a pre-application or full application?: select either preapplication or full application depending on which the potential applicant plans to submit next.
Submitting a pre-application is recommended, with the exception of applications for leading-edge
facilities.
•
Expected Timeline for Next Submission: Estimate the date the potential applicant intends to submit a
Pre-Application or Full Application by selecting a Month and Year. The applicant will not be required to
submit their pre-application or Full Application at this date; this information is used for CPO to
appropriately prepare for reviews. The Pre-Application or Full Application must be submitted a
minimum of twenty-one days following the submission of the SOI.
•
Is there other information about the potential application that we should know? (optional): Provide
any relevant information about the project or application (maximum 1500 characters).