Download:
pdf |
pdflotter on DSK11XQN23PROD with NOTICES1
45196
Federal Register / Vol. 88, No. 134 / Friday, July 14, 2023 / Notices
contacts listed for Respondents in the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (http://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Comment Date: 5 p.m. Eastern Time
on August 4, 2023.
Dated: July 10, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–14997 Filed 7–13–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:54 Jul 13, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC23–11–000]
Commission Information Collection
Activities (FERC–510); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the proposed
extension of currently approved
information collection, FERC–510
(Application for Surrender of a
Hydropower License).
DATES: Comments on the collection of
information are due August 14, 2023.
ADDRESSES: Send written comments on
FERC–510 to OMB through
www.reginfo.gov/public/do/PRAMain,
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
1902–0068 (Application for Surrender
of a Hydropower License) in the subject
line. Your comments should be sent
within 30 days of publication of this
notice in the Federal Register.
Please submit copies of your
comments (identified by Docket No.
IC23–11–000 and the form) to the
Commission as noted below. Electronic
filing through https://www.ferc.gov, is
preferred.
Electronic Filing: Documents must be
filed in acceptable native applications
and print-to-PDF, but not in scanned or
picture format.
For those unable to file electronically,
comments may be filed by USPS mail or
by hand (including courier) delivery.
Mail via U.S. Postal Service only,
addressed to: Federal Energy Regulatory
Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Mail via any other service (including
courier delivery): Federal Energy
Regulatory Commission, Secretary of the
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Please reference the specific
collection number(s) and/or title(s) in
your comments.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at:
www.reginfo.gov/public/do/PRAMain.
SUMMARY:
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
Using the search function under the
‘‘Currently Under Review field,’’ select
Federal Energy Regulatory Commission;
click ‘‘submit’’ and select ‘‘comment’’ to
the right of the subject collection. FERC
submissions must be formatted and filed
in accordance with submission
guidelines at: https://www.ferc.gov. For
user assistance contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov and
telephone at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–510, Application for
Surrender of a Hydropower License.
OMB Control No.: 1902–0068.
Type of Request: Three-year extension
of the FERC–510 information collection
requirements with no changes to the
current reporting and recordkeeping
requirements.
Abstract: The purpose of FERC–510 is
to implement information collections
pursuant to sections 4(e), 6, and 13 of
the Federal Power Act (FPA) (16 U.S.C.
797(e), 799 and 806). Section 4(e) gives
the Commission authority to issue
licenses for the purposes of
constructing, operating and maintaining
dams, water conduits, reservoirs,
powerhouses, transmission lines or
other power project works necessary or
convenient for developing and
improving navigation, transmission and
utilization of power using bodies of
water over which Congress has
jurisdiction. Section 6 gives the
Commission the authority to prescribe
the conditions of licenses including the
revocation or surrender of the license.
Section 13 defines the Commission’s
authority to delegate time periods for
when a license must be terminated if
project construction has not begun.
Surrender of a license may be desired by
a licensee when a licensed project is
retired or not constructed or natural
catastrophes have damaged or destroyed
the project facilities.
FERC–510 is the application for the
surrender of a hydropower license.1 The
information is used by Commission staff
to determine the broad impact of such
surrender. The Commission will issue a
notice soliciting comments from the
public and other agencies and conduct
a review of the application before
1 18
E:\FR\FM\14JYN1.SGM
CFR 6.1–6.4.
14JYN1
Federal Register / Vol. 88, No. 134 / Friday, July 14, 2023 / Notices
issuing an order for Surrender of a
License. The order is the result of an
analysis of the information produced
(i.e., dam safety, public safety, and
environmental concerns, etc.), which is
examined to determine whether any
conditions must be satisfied before
granting the surrender. The order
implements the existing regulations and
is inclusive for surrender of all types of
hydropower licenses issued by FERC
and its predecessor, the Federal Power
Commission.
45197
Type of Respondent: Private or
Municipal Hydropower Licensees.
Estimate of Annual Burden: 2 The
Commission estimates the total annual
burden and cost 3 for this information
collection as follows:
FERC–510
Number of respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average burden
hrs. & cost
($) per response
Total annual burden
hrs. & total annual
cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
80 hrs.; $7,280 ......
560 hrs.; $50,960 ..
7 ....................................................................
7
$7,280
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: 2607–016.
c. Date filed: June 26, 2023.
d. Applicant: Spencer Mountain
Hydropower, LLC.
e. Name of Project: Spencer Mountain
Hydroelectric Project (Spencer
Mountain Project).
f. Location: On the South Fork
Catawba River, near the town of
Gastonia, in Gaston County, North
Carolina.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kevin
Edwards and Mrs. Amy Edwards,
Spencer Mountain Hydropower, LLC,
916 Comer Rd., Stoneville, NC 27048;
Phone at (336) 589–6138, or smhydro@
pht1.com.
i. FERC Contact: Michael Spencer at
(202) 502–6093, or michael.spencer@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: September 8, 2023.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at http://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Spencer Mountain Project
(P–2607–016).
m. The application is not ready for
environmental analysis at this time.
n. The Spencer Mountain Project
consists of the following existing
facilities: (1) a 12-foot-high, 636-footlong masonry and rubble dam with a
crest elevation of 634.7 feet mean sea
level (msl); (2) a 68-acre reservoir with
a storage capacity of 166 acre-feet; (3) a
58.9-foot-long canal headwork,
consisting of four 6-foot-wide gates; (4)
a 53.8-foot-long canal spillway
2 ‘‘Burden’’ is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For additional
information, refer to Title 5 Code of Federal
Regulations 1320.3. The number of respondents is
based on the average number of respondents over
the last three years.
3 The Commission staff thinks that the average
respondent for this collection is similarly situated
to the Commission, in terms of salary plus benefits.
The FERC 2022 average salary plus benefits for one
FERC full-time equivalent (FTE) is $188,922/year
(or $91.00/hour).
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility,
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–14989 Filed 7–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2607–016]
Spencer Mountain Hydropower, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
lotter on DSK11XQN23PROD with NOTICES1
1
VerDate Sep<11>2014
17:54 Jul 13, 2023
Jkt 259001
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
E:\FR\FM\14JYN1.SGM
14JYN1
File Type | application/pdf |
File Modified | 2023-07-14 |
File Created | 2023-07-14 |