Download:
pdf |
pdfU.S. NUCLEAR REGULATORY COMMISSION
NRC FORM 327
(MM-YYYY)
10 CFR 74.31(c)(5),
74.33(c)(4),
74.43(c)(7),
and 74.59(f)(1)
SPECIAL NUCLEAR MATERIAL (SNM)
AND SOURCE MATERIAL (SM)
PHYSICAL INVENTORY SUMMARY REPORT
(Physical inventories of SM pertain only to uranium enrichment facilities.)
Instructions: See NUREG/BR-0096 for detailed instructions for completing this form:
http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/br0096/
A. Licensee Name
Estimated burden per response to comply with this mandatory collection request: 4 hours. This
information is submitted by fuel facility licensees to account for special nuclear material. Send
comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6
A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to
infocollects.resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory
Affairs, (3150-0139), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW,
Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or
sponsor, and a person is not required to respond to, a collection of information unless the document
requesting or requiring the collection displays a currently valid OMB control number.
B. Facility Location
C. Docket Number
F. Material Balance Report
G. Material Type
EXPIRES: (MM/DD/YYYY)
APPROVED BY OMB: NO. 3150-0139
D. SNM License Number
E. Plant Designation
Beginning Date (MM/DD/YYYY)
Ending Date (MM/DD/YYYY)
LEU
U-233
PU-238
Normal Uranium
HEU
Plutonium
Uranium in Cascades
Depleted Uranium
H. Licensee's Certifying Official (Typed or Printed Name and Title)
Signature
Date (MM/DD/YYYY)
LINE
NUMBER
GRAM ELEMENTS
(U or Pu)
DESCRIPTION
Grams Isotope
Isotope Code
* Indicate whether the entered values are positive or negative by use of appropriate "+" or "-" signs.
1
BEGINNING INVENTORY
(BI)
2
PLUS ADDITIONS TO INVENTORY
(A)
3
MINUS SHIPMENTS
(S)
4
MINUS MEASURED DISCARDS
5
MINUS ENDING INVENTORY
(EI)
*6
EQUALS INVENTORY DIFFERENCE
(ID)
*7
PLUS BIAS CORRECTION TO ID
(Net sum of all bias corrections pertaining to,
but not included in the above quantities)
(BC)
*8
PLUS SUM OF PRIOR PERIOD AJUSTMENTS
THAT AFFECT THE CURRENT PERIOD ID
(PPA)
9
EQUALS ADJUSTED INVENTORY DIFFERENCE
(AID)
(MD)
10a
STANDARD ERROR OF THE ID
(SEID)
10b
LIMIT OF ERROR OF THE ID
(LEID)
11a
ACTIVE INVENTORY
11b
THE LARGER OF "ADDITIONS TO PROCESS"
OR REMOVALS FROM PROCESS"
12a
SEID LIMIT
12b
LEID LIMIT
13
ID LIMIT
NRC FORM 327 (MM-YYYY)
(AI)
(ATP)
(RFP)
NOTE: ANY SPECIAL EXPLANATIONS OR COMMENTS TO THIS COMPLETED FORM SHOUD BE ATTACHED ON A CORPORATE LETTERHEAD.
File Type | application/pdf |
File Title | y:\wpo4\informs\forms\nrc327_1.wpf |
Author | dah1 |
File Modified | 2023-02-02 |
File Created | 2022-06-16 |