Eia-860m Monthly Update To Annual Electric Generator Report

Electric Power and Renewable Electricity Surveys

860M form_2022

OMB: 1905-0129

Document [pdf]
Download: pdf | pdf
FORM EIA-860M
MONTHLY UPDATE TO
ANNUAL ELECTRIC
GENERATOR REPORT

Approval: OMB No. 1905-0129
Approval Expires: xx/xx/xxxx
Burden: 0.31 Hours

NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply
may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions
and disclosure information, see the provisions stated on the last page of the instructions. Title 18 USC 1001 makes it a criminal
offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,
fictitious, or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1. IDENTIFICATION
1. What is the contact information for the preparer?

- The survey contact is the person that completes and submits the data.

First Name

Last Name

Title
Address
City

State

Zip Code

Phone

Ext

Fax

Cell Phone
Email
2. What is the contact information for the preparer’s supervisor?
First Name

Last Name

Title
Address
City

State

Zip Code

Phone

Ext

Fax

Cell Phone
Email
3. What is the contact information for this entity?
Entity Name
Entity ID
4. Enter the month and year that you are reporting for:

(MM/YYYY)

If you have a question about the data requested on this form, email EIA-860M@eia.gov (preferred) or contact one of the survey managers:
Suparna Ray, (202) 586-5077

Alex Mey, (202) 287-5868

1

Raymond Chen, (202) 287-6532

FORM EIA-860M
MONTHLY UPDATE TO
ANNUAL ELECTRIC
GENERATOR REPORT
Legal Name of Entity
Entity ID

Approval: OMB No. 1905-0129
Approval Expires: xx/xx/xxxx
Burden: 0.31
Hours

[Pre-printed]
State

[Pre-printed]

Reporting Month/Year

[Pre-printed]

[Pre-printed]

SCHEDULE 2. UPDATES TO PROPOSED NEW GENERATORS
1. Verify the plant identification number, plant name and state.

- If any of the information is incorrect or missing, provide the correct information in Schedule 4, Comments.

Plant Name

Plant ID

[Pre-printed]

[Pre-printed]

Plant State

[Pre-printed]

2. Verify that the pre-printed data in items 1-8 below are correct.
If data are correct, check the “Check if no change” box and complete Schedule 3, if applicable.
If any of the pre-printed data are incorrect or missing:
Provide the correct data in the “This Month’s Updates” column
- Enter the reason for change

Generator ID:

[Pre-printed]

Check if no change:
Last Data
Reported to EIA

Generator ID:
Check if no change:

This Month’s
Update

Last Data
Reported to EIA

1

Status Code

[Pre-printed]

[Pre-printed]

2

Prime Mover Code

[Pre-printed]

[Pre-printed]

3

Nameplate Capacity (MW)

[Pre-printed]

[Pre-printed]

4

Net Summer Capacity (MW)

[Pre-printed]

[Pre-printed]

5

Net Winter Capacity (MW)

[Pre-printed]

[Pre-printed]

6

Energy Source 1

[Pre-printed]

[Pre-printed]

7

Energy Source 2

[Pre-printed]

[Pre-printed]

8

Planned Current Effective Date

[Pre-printed]

[Pre-printed]

9

Reason for Change

- Select all that apply
- Explain “Other” in Schedule 4

[Pre-printed]
This Month’s
Update

Financial

Equipment

Financial

Equipment

Permitting

Other

Permitting

Other

2

Complete lines 3a to 3d only if the proposed new generator has become operational this month and it will be powered
by photovoltaic or concentrated solar thermal technology.
3a. Is the output from this generator part of a net metering agreement?
3b. If the output from this generator is part of a net metering agreement how much DC capacity (in MW) is part of the
net metering agreement (exclude known virtual net metering)?
3c. Is the output from this generator part of a known virtual net metering agreement?
3d. If the output from this generator is part of a known virtual net metering agreement how much DC capacity (in MW)
is part of the known virtual net metering agreement?

3

FORM EIA-860M
MONTHLY UPDATE TO
ANNUAL ELECTRIC
GENERATOR REPORT
Legal Name of Entity
Entity ID

Approval: OMB No. 1905-0129
Approval Expires: xx/xx/xxxx
Burden: 0.31 Hours

[Pre-printed]

[Pre-printed]

State

Reporting Month/Year

[Pre-printed]

[Pre-printed]

SCHEDULE 3. UPDATES TO PROPOSED CHANGES TO EXISTING GENERATORS
(Use Additional Pages if Necessary)
1. Verify the plant identification number, plant name and state.
- If any of the information is incorrect or missing, provide the correct information in Schedule 4, Comments

Plant Name

Plant ID

[Pre-printed]

[Pre-printed]

Plant State

[Pre-printed]

2. Verify that the pre-printed data in items 1-25 below are correct.
If data are correct, check the “Check if no change” box
If any of the pre-printed data are incorrect or missing: provide the correct data in the “This Month’s Updates” column. Enter the reason for change

Generator ID:

[Pre-printed]

Check if no change:
Last Data
Reported to
EIA

This Month’s
Update

Generator ID:

Check if no change:
Last Data
Reported to
EIA

Existing Information
1

Prime Mover Code (Existing)

[Pre-printed]

[Pre-printed]

2

Energy Source 1

[Pre-printed]

[Pre-printed]

3

Energy Source 2

[Pre-printed]

[Pre-printed]

4

Nameplate Capacity (MW)

[Pre-printed]

[Pre-printed]

5

Net Summer Capacity (MW)

[Pre-printed]

[Pre-printed]

6

Net Winter Capacity (MW)

[Pre-printed]

[Pre-printed]

Uprate
7

Is the Uprate Still Planned?

[Pre-printed]

[Pre-printed]

8

Planned Uprate Net Summer Capacity (MW)

[Pre-printed]

[Pre-printed]

9

Planned Uprate Net Winter Capacity (MW)

[Pre-printed]

[Pre-printed]

10

Planned Uprate Month/Year

[Pre-printed]

[Pre-printed]

Derate
11

Is the Derate Still Planned?

[Pre-printed]

[Pre-printed]

12

Planned Derate Net Summer Capacity (MW)

[Pre-printed]

[Pre-printed]

13

Planned Derate Net Winter Capacity (MW)

[Pre-printed]

[Pre-printed]

14

Planned Derate Month/Year

[Pre-printed]

[Pre-printed]

4

[Pre-printed]
This
Month’s
Update

FORM EIA-860M
MONTHLY UPDATE TO
ANNUAL ELECTRIC
GENERATOR REPORT

Approval: OMB No. 1905-0129
Approval Expires: xx/xx/xxxx
Burden: 0.31 Hours

New Net Capacity
15

New Net Summer Capacity
(item 5 + item 8 – item 12)

[Pre-printed]

[Pre-printed]

16

New Net Winter Capacity
(item 6 + item 9 – item 13)

[Pre-printed]

[Pre-printed]

Repowering
17

Is the Repowering Still Planned?

[Pre-printed]

[Pre-printed]

18

New Prime Mover Code

[Pre-printed]

[Pre-printed]

19

New Energy Source

[Pre-printed]

[Pre-printed]

20

Planned Repower Month/Year

[Pre-printed]

[Pre-printed]

Retirement
21

Is the Retirement Still Planned?

[Pre-printed]

[Pre-printed]

22

Planned Retirement Month/Year

[Pre-printed]

[Pre-printed]

Other Modifications
23

Are Other Modifications Still Planned?

[Pre-printed]

[Pre-printed]

24

Planned Modifications Month/Year

[Pre-printed]

[Pre-printed]

25

Reason for Change

- Check all that apply
- If “Other” explain in Schedule 4)

Financial

Equipment

Financial

Equipment

Permitting

Other

Permitting

Other

5

FORM EIA-860M
MONTHLY UPDATE TO
ANNUAL ELECTRIC
GENERATOR REPORT
Legal Name of Entity
Entity ID

State

Reporting Month/Year

SCHEDULE 4. COMMENTS
(Use Additional Pages if Necessary)
SCHEDULE
NUMBER

LINE
NUMBER

NOTES

A

B

C

6

Approval: OMB No. 1905-0129
Approval Expires: xx/xx/xxxx
Burden: 0.31 Hours


File Typeapplication/pdf
AuthorMJR
File Modified2022-11-15
File Created2022-05-23

© 2024 OMB.report | Privacy Policy