Download:
pdf |
pdfFor Your Information (FYI) User
Guide – Primary Authorized Official
Environmental Protection Agency
Office of Pollution Prevention and Toxics
Manage Toxic Substances
OMB Control No. 2070-0046
EPA ICR No. 0794.17
Expiration Date: 10/31/2022
Table of Contents
1
Introduction ........................................................................................................................ 1
1.1
Overview ...................................................................................................................... 1
1.2
Labeling Confidential Information ................................................................................. 2
2
System Requirements: ....................................................................................................... 3
2.1
Supported Browsers ..................................................................................................... 3
2.2
Screen Resolution ........................................................................................................ 3
3
Primary Authorized Official Functions ................................................................................. 4
3.1
Log into FYI application ................................................................................................ 4
3.2
Home Screen Navigation .............................................................................................. 5
3.3
User Management ........................................................................................................ 6
3.4
Create New Submission ............................................................................................... 8
3.4.1
FYI Submissions Screen......................................................................................... 8
3.4.2
Create Passphrase Screen ................................................................................... 10
3.4.3
Enter Passphrase Screen ..................................................................................... 11
3.4.4
Navigation Tree .................................................................................................... 12
3.4.5
Action Bar ............................................................................................................. 14
3.4.6
Technical Contact Information Screen .................................................................. 16
3.4.7
Submitting on Behalf Of Company Screen ............................................................ 19
3.4.8
Submitting on Behalf of Consortium Screen .......................................................... 21
3.4.9
Chemical Identification Screen.............................................................................. 22
3.4.10
Document Management Screen ........................................................................... 29
4
Validate ............................................................................................................................ 34
5
Submit to EPA via CDX .................................................................................................... 36
5.1
Submitting Official Information Screen ........................................................................ 36
5.2
Submission Process: Validation Screen ..................................................................... 37
5.3
CROMERR Certification Screen ................................................................................. 38
5.4
CROMERR Login Screen ........................................................................................... 39
5.5
CROMERR Security Question Screen ........................................................................ 40
5.6
Submit to CDX Screen................................................................................................ 41
5.7
CROMERR Submission Screen ................................................................................. 42
6
Download Copy of Record ................................................................................................ 44
7
Create an Amendment ..................................................................................................... 47
8
Resources ........................................................................................................................ 49
FYI Submission User Guide
Primary Authorized Official
i
Appendix A. Definitions, Acronyms, and Abbreviations ............................................................. 50
Appendix B. Submission Types, Effects, and Endpoints ........................................................... 51
FYI Submission User Guide
Primary Authorized Official
ii
List of Exhibits
Exhibit 3-1: Chemical Information Submission System Screen ................................................... 5
Exhibit 3-2: FYI Home Screen ..................................................................................................... 6
Exhibit 3-3: User Management Screen ........................................................................................ 8
Exhibit 3-4: FYI Submissions Screen ........................................................................................ 10
Exhibit 3-5: Create Passphrase Screen..................................................................................... 11
Exhibit 3-6: Enter Passphrase Screen ....................................................................................... 12
Exhibit 3-7: Navigation Prompt .................................................................................................. 13
Exhibit 3-8: Navigation Tree ...................................................................................................... 14
Exhibit 3-9: Action Bar – Validate .............................................................................................. 15
Exhibit 3-10: Action Bar – Save ................................................................................................. 15
Exhibit 3-11: Action Bar – Preview ............................................................................................ 15
Exhibit 3-12: Action Bar – Submit .............................................................................................. 15
Exhibit 3-13: Action Bar – Help Links ........................................................................................ 16
Exhibit 3-14: Technical Contact Information Screen .................................................................. 18
Exhibit 3-15: Submitting on Behalf of Company Screen ............................................................ 20
Exhibit 3-16: Submitting on Behalf of Consortium Screen ......................................................... 22
Exhibit 3-17: Chemical Identification Screen: Submission Is for a Mixture ................................. 24
Exhibit 3-18: Chemical Identification Screen: Submission Is Not For a Mixture ......................... 25
Exhibit 3-19: Search Substance Registry Services Pop-Up Window ......................................... 26
Exhibit 3-20: Chemical Not Found in Substance Registry Services Search Pop-Up Window .... 28
Exhibit 3-21: Chemical Identification Screen (Populated with chemical not found in SRS Search)29
Exhibit 3-22: Document Management Screen ........................................................................... 30
Exhibit 3-23: Document Management Pop-Up Window ............................................................. 32
Exhibit 3-24: Document Management Screen (Populated) ........................................................ 33
Exhibit 4-1: FYI Submission Validation Pop-Up Window ........................................................... 35
Exhibit 5-1: Submitting Official Information Screen.................................................................... 36
Exhibit 5-2: Submission Process: Validation Screen ................................................................. 37
Exhibit 5-3: Submission Process: PDF Generation Screen ....................................................... 38
Exhibit 5-4: CROMERR Certification Screen ............................................................................. 39
Exhibit 5-5: CROMERR Login Screen ....................................................................................... 40
Exhibit 5-6: CROMERR Security Question Screen .................................................................... 41
Exhibit 5-7: Submit to CDX Screen ........................................................................................... 42
Exhibit 5-8: CROMERR Submission Screen ............................................................................. 43
Exhibit 6-1: Download Copy of Record Screen.......................................................................... 45
Exhibit 6-2: Download Prompt Pop-up Window ......................................................................... 45
Exhibit 7-1: FYI Submissions – Amendment ............................................................................. 47
Exhibit 7-2: Unlock Prompt Message ........................................................................................ 48
FYI Submission User Guide
Primary Authorized Official
iii
Exhibit 8-1: Resources Screen .................................................................................................. 49
FYI Submission User Guide
Primary Authorized Official
iv
1
Introduction
1.1
Overview
This document presents the user guide for the Office of Pollution Prevention and Toxics (OPPT)
For Your Information (FYI) application submission process. This document is the user guide for
the Primary Authorized Official (AO) user of the FYI tool. General information on FYIs is
available on the TSCA Section 8(e) website available at http://www.epa.gov/oppt/tsca8e/.
Information on CDX registration, including user roles that apply to completing a FYI
Submission Notice, is available at http://cdx.epa.gov/About/UserGuide
FYI submissions are from a classification system established by the Environmental Protection
Agency (EPA) to distinguish voluntary submissions from substantial risk notices, also known as
Section 8(e) Notices, which are formally submitted to EPA under TSCA Section 8(e). The FYI
classification was created by EPA to capture submissions by people and organizations not
subject to the reporting requirements, but who desire to inform EPA of potential toxic substances
that may pose a risk to human health or to the environment.
EPA has received FYI submissions covering a wide variety of chemical substances and mixtures
from chemical companies, trade associations, unions, public interest groups, civic associations,
private citizens, academic institutions, state and other federal agencies, as well as similar
organizations and agencies in foreign countries. These submissions contain information on
human exposure, epidemiology, toxicity test results, monitoring studies, environmental fate, and
other information that may be important to risk assessment.
Sometimes FYIs are submitted when a manufacturer, importer, or processor is not sure the
information they have gathered supports a conclusion of substantial risk. FYI submissions are
often submitted to the Agency when a person or company that is not required to submit would
like to bring a chemical’s risk information to EPA’s attention. Chemical companies, trade
associations, public interest groups, and academic institutions are among those who submit FYIs.
The FYI application is an electronic, web-based tool provided by EPA for the submission of FYI
data. As a Primary AO, you can create or modify an FYI submission as well as submit to EPA
via the Central Data Exchange (CDX). You can also create FYI amendments and download the
Copy of Record (CoR).
This electronic application is optional for the production and submission of these filings.
Potential users may find that the use of this application saves time, burden and, because it is in an
electronic format, provides easy access to reporting forms. Potential users are reminded to
carefully read and follow application instructions. Persons who wish to use this application must
address all provisions in the application including those relating to indexing information (i.e.,
company name, address, chemical name, etc.) and those related to Confidential Business
Information (CBI) submissions, including the requirement for the submission of sanitized or
redacted filings.
If data is claimed as CBI, it will not be made available to the public unless EPA determines that
the information is not entitled to confidential treatment in accordance with the Agency
confidentiality regulations at 40 Code of Federal Regulations (CFR) part 2, subpart B.
For questions concerning the FYI software requirements, please contact the CDX Help Desk at
helpdesk@epacdx.net or call 1-888-890-1995 between the hours of 8am – 6pm Eastern Standard
FYI Submission User Guide
Primary Authorized Official
1
Time (EST). For Toxic Substances Control Act (TSCA) FYI submissions, please contact the
TSCA Hotline at TSCA-Hotline@epamail.epa.gov or call 202-554-1404.
1.2
Labeling Confidential Information
This user guide presents instructions and screenshots for the ‘FYI Submission’ electronic
application as if you were logged in as a Primary AO. As a Primary AO, you are able to create,
modify, delete, and submit an FYI. The user may claim certain information as Confidential
Business Information (CBI). If the data is claimed as CBI, it will be treated in accordance with
the Agency confidentiality regulations at 40 CFR part 2, subpart B.
This TSCA ‘FYI Submission’ electronic application is optional for the production and
submission of these filings. The paper option for filing will continue to be allowed. Persons who
wish to use this application must address all provisions in the application, including those
relating to indexing information (i.e., company name, address, chemical name etc.) and those
related to CBI submissions, including the requirement for the submission of sanitized or redacted
filings. Please note that certain CBI claims will not be accepted if you choose to use this
electronic application for TSCA FYI Submission. For example, chemical name and/or chemical
identity, if the chemical is listed on the public portion of the TSCA Inventory, may not be
claimed as CBI in a submission using this application. Similarly, the user must enter a nonconfidential study title, because it may not be claimed as CBI. EPA does not expect that such
information, if evaluated under procedures at 40 CFR part 2, subpart B, would generally be
found entitled to confidential treatment.
If the user believes that these or other data elements must be treated as CBI, then the user may
use the paper option to file the FYI Submission and assert CBI claims. If the user claims an
uploaded document as CBI, a sanitized document must be provided.
The following fields can be claimed as CBI within the ‘FYI Submission’ application:
Technical Contact Information
Submitting on Behalf of Company information
Submitting on Behalf of Consortium information
A single chemical substance that is not on the public TSCA Inventory
The chemical substances comprising a mixture
The percent concentrations of individual chemical substances in a mixture
Any document uploaded within the ‘Document Management’ pop-up window
Submitting Official Information
Paperwork Reduction Act
This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et
seq. (OMB Control No. 2070-0046). Responses to this collection of information are mandatory for certain
persons, as specified at 15 USC 2607(e). An agency may not conduct or sponsor, and a person is not required
to respond to, a collection of information unless it displays a currently valid OMB control number. The public
reporting and recordkeeping burden for this collection of information is estimated to be 50 hours per response.
Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and
any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S.
Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include
the OMB control number in any correspondence. Do not send the completed form to this address.
FYI Submission User Guide
Primary Authorized Official
2
2
System Requirements:
In order to use the FYI application the following are required:
An e-mail account
A supported web browser (see Section Error! Reference source not found. below) with
Java Script enabled.
Internet access
Adobe Acrobat Reader 5.0 or higher
CDX username and password
2.1
Supported Browsers
One of the following supported browsers is required to access the FYI application:
Internet Explorer 7 or above
Go to the following link to download:
http://windows.microsoft.com/en-US/internet-explorer/downloads/ie
Mozilla Firefox 3.5 or above
Go to the following link to download:
http://www.mozilla.com/en-US/firefox/all-older.html
Safari 4 or above
Go to the following link to download:
http://support.apple.com/kb/dl877
Google Chrome
Go to the following link to download:
http://www.google.com/chrome
2.2
Screen Resolution
Screen resolution should be set to 1024 x 768 or greater.
FYI Submission User Guide
Primary Authorized Official
3
3
Primary Authorized Official Functions
This section describes how to:
Access the application
Navigate the FYI ‘Home’ screen
Assign Supports to complete an FYI submission
Start and complete an FYI submission
Submit to EPA via CDX
Download the Copy of Record
Create an amendment
The Primary AO is the person legally responsible for the submission of FYI data for the
reporting company. The AO is typically a senior official for the reporting company and may be
the supervisor of the person (or persons) completing the submission.
As a Primary AO, you can create a new submission and assign Supports to edit and complete a
submission on your behalf. You are responsible for submitting all the required information and
are legally responsible for the information submitted to EPA within each FYI submission.
You can save the submission at any point during the data entry process. The save functionality
will allow you to return to that same submission at any point in the future. You can print the
document at any point; however, the ‘Not For Submission’ watermark will be placed on the
portable document format (PDF) document.
3.1
Log into FYI application
After you create an account in CDX and click the ‘Primary Authorized Official’ link under the
Chemical Safety and Pesticide Programs (CSPP) program service, you will be taken to the
‘Chemical Information Submission System’ screen.
Note: Information on CDX registration, including user roles that apply to completing a FYI
Submission, is available at http://cdx.epa.gov/About/UserGuide
Exhibit 3-1 shows a screen capture of the ‘Chemical Information Submission System’ screen:
FYI Submission User Guide
Primary Authorized Official
4
Exhibit 3-1: Chemical Information Submission System Screen
Navigation: Select ‘TSCA FYI Submission’ from the drop-down menu and click the ‘OK’
button to navigate to the FYI ‘Home’ screen.
3.2
Home Screen Navigation
You can access the FYI ‘Home’ screen by selecting ‘FYI Submission’ from the ‘Chemical
Information Submission System’ screen drop-down menu and by clicking the ‘OK’ button.
The FYI ‘Home’ screen is the first screen within the FYI application. It provides you with links
and tabs to access the ‘FYI’ submissions, ‘User Management,’ and ‘Resources’ screens. To
navigate to any of these screens, click the screen link (in blue text), or click the screen tab
(located within the application header). The links and tabs provide the same functionality.
Submissions: Click the ‘Submissions’ link or tab to navigate to the ‘FYI’ submissions
screen. You can create or modify an FYI submission using the ‘FYI’ submissions screen.
For additional details about the ‘FYI’ submissions screen, please refer to Section 3.4.1.
User Management: Click the ‘User Management’ link or tab to navigate to the ‘User
Management’ screen. You can manage the access rights of Supports per submission using
the ‘User Management’ screen. For additional details about the ‘User Management’ screen,
please refer to Section 3.3.
FYI Submission User Guide
Primary Authorized Official
5
Resources: Click the ‘Resources’ link or tab to navigate to the ‘Resources’ screen. You
can view the FYI user guide, as well as useful links for further usability instruction on the
‘Resources’ screen. For additional details about the ‘Resources’ screen, please refer to
Section 8.
Exhibit 3-2 shows a screen capture for the FYI ‘Home’ screen:
Exhibit 3-2: FYI Home Screen
Navigation: Click the ‘User Management’ link or tab to access the ‘User Management’ screen
and assign Supports.
3.3
User Management
You can access the ‘User Management’ screen by clicking the ‘User Management’ link or tab
from the FYI ‘Home’ screen.
On the ‘User Management’ screen, you can assign your Supports to fill out FYI submissions.
You have the ability to assign access to one or more Supports to modify any of the FYI
submissions you have created. In order to grant a Support access to an FYI submission, you must
create a new submission and assign a passphrase to that submission. You can also assign
different Supports to fill out each FYI submission.
FYI Submission User Guide
Primary Authorized Official
6
FYI Submission: Submissions will not be available in this menu until one has been created.
Select a submission from the drop-down menu to begin assigning Supports. Once a submission
has been selected, the ‘Assign Users’ group box will update to display only the Supports who
have identified you as their AO during CDX registration.
Assign Users: This box shows all the Supports you can assign to complete an FYI submission
for the submission selected. To move Supports from the ‘Unassigned’ group box to the
‘Assigned’ group box, highlight the individual or multiple Supports and click the ‘add >>’
button.
Unassigned: This box contains the registered Supports who have identified you as their
AO that can be assigned to access and edit the selected submission. To highlight multiple
Supports hold down the key on your keyboard while clicking each Support. To
highlight multiple consecutive Supports, hold down the key on your keyboard
while clicking the first and last Support.
Assigned: This box contains the registered Supports who have been given permission, by
you, to access and edit the selected submission. To move Supports from the ‘Assigned’
group box to the ‘Unassigned’ group box, highlight individual or multiple Supports and
click the ‘<< remove’ button. To highlight multiple Supports hold down the key on
your keyboard and click each Support. To highlight multiple consecutive Supports hold
down the key on your keyboard and click the first and last Support.
When you have finished assigning Supports, click the ‘Save’ button to save the assignments.
Exhibit 3-3 shows a screen capture of the ‘User Management’ screen:
FYI Submission User Guide
Primary Authorized Official
7
Exhibit 3-3: User Management Screen
Navigation: Click the ‘Submissions’ tab located within the application header to navigate to the
‘FYI’ submissions screen.
3.4
Create New Submission
As a Primary AO, you can start a new submission and assign your Supports to complete
identified submissions.
3.4.1
FYI Submissions Screen
You can access the ‘FYI’ submissions screen by clicking the ‘Submissions’ link from the FYI
‘Home’ screen, or by clicking the tab located within the application header.
Only one FYI submission is created per case number. Case numbers are only generated upon
submission. Each column within the table of the ‘FYI’ submissions screen can be sorted by
clicking the column headers.
Start a New Submission: To create a new FYI submission, click the ‘Start New Submission’
button. You will be required to create a passphrase that will be associated with that particular
submission. Make sure to create a passphrase that you will remember, as it cannot be retrieved or
reset.
Edit a Submission: To modify an existing FYI submission, click the submission alias link for a
submission that has a status of ‘In Progress.’ You will be required to enter the passphrase
associated with that particular submission to access and continue editing the submission.
FYI Submission User Guide
Primary Authorized Official
8
Submitted Submission: To edit an already submitted FYI submission (i.e., to create an
amendment), you must first unlock the particular submission by clicking the lock icon ( )
under the ‘Action’ column. You will be required to enter the passphrase associated with that
particular submission to gain access and amend the submission. All submitted changes will be
considered an amendment. Refer to Section 7 for further instructions on creating an amendment.
The ‘FYI’ submissions screen displays the following columns:
Submission Alias: Displays the submission alias provided by the user within the
‘Technical Contact Information’ screen. The ‘Submission Alias’ column will display a time
stamp unless the user defines a unique submission alias on the ‘Technical Contact
Information’ screen. The purpose of the submission alias is to help identify each FYI
submission.
Case Number: Displays the case number for the submission. The case number is generated
upon submission. The ‘Case Number’ column will display as blank until the FYI
submission has been submitted successfully.
Status: Displays the status of the FYI submission. The column will display as ‘In Progress’
or ‘Submitted.’
Modify Date: Displays the date the submission was last modified.
Submission Date: Displays the date you completed the submission to EPA. This date is
populated only after you submit.
Copy of Record: Click the ’Copy of Record’ icon ( ) to continue the download copy of
record process. The ’Copy of Record’ icon ( ) is displayed only after you submit to EPA
via CDX. The ’Copy of Record’ icon ( ) is confirmation that your submission has been
successfully received by EPA. Note that the ’Copy of Record’ icon ( ) may take 15-20
minutes to display on the ‘FYI’ submissions screen. Refer to Section 6 for further
instructions on downloading the copy of record.
Action: Displays a ‘Delete’ icon ( ) for all submissions with a status of ‘In Progress.’
Displays a ‘Lock’ icon ( ) for all submissions that have been submitted. Only an AO can
unlock a submission by clicking the ‘Unlocked’ icon ( ).
Export Options: Displays ‘CSV,’ ‘Excel,’ ‘XML,’ and ‘PDF’ links for you to export the
‘FYI’ submissions screen in one of the specified formats as an Excel spreadsheet, CommaSeparated Values (CSV), Extensible Markup Language (XML), or Portable Document
Format (PDF).
Exhibit 3-4 shows the screen capture for the ‘FYI’ submissions screen:
FYI Submission User Guide
Primary Authorized Official
9
Exhibit 3-4: FYI Submissions Screen
Navigation: Click the ‘Start New Submission’ button to navigate to the ‘Create Passphrase’
screen.
3.4.2
Create Passphrase Screen
To start a new FYI submission, click the ‘Start New Submission’ button on the ‘FYI’
submissions screen. The ‘Create Passphrase’ screen allows you to create a passphrase and
associate that passphrase with your submission.
New Passphrase: To associate a passphrase with a submission, enter a passphrase that is at least
8 characters in length, and no more than 20 characters in length. To protect your account, your
passphrase should contain a combination of letters and numbers. The passphrase you create may
include spaces, but should not contain special characters (for example, +, and *). You can
associate the same passphrase with multiple submissions.
You will be responsible for remembering the passphrase and distributing it to only authorized
Supports for the submission. If you forget the passphrase, you will not be able to access the FYI
submission to print, submit, or make changes. If a user loses or forgets the passphrase, a user
must create a new submission and passphrase. For security reasons, the system administrator
does not have access to the passphrase and will not be able to retrieve it or reset it to a new one.
Exhibit 3-5 shows a screen capture of the ‘Create Passphrase’ screen:
FYI Submission User Guide
Primary Authorized Official
10
Exhibit 3-5: Create Passphrase Screen
Navigation: Create a passphrase and click the ‘Next’ button to navigate to the ‘Technical
Contact Information’ screen.
3.4.3
Enter Passphrase Screen
To edit a submission click the ‘Submission Alias’ link for a submission with a status of ‘In
Progress’ on the ‘FYI’ submissions screen. The ‘Enter Passphrase’ screen allows you to enter the
passphrase associated with the submission.
Enter Passphrase: Enter the passphrase that you originally created and associated with the
submission.
Exhibit 3-6 shows a screen capture of the ‘Enter Passphrase’ screen:
FYI Submission User Guide
Primary Authorized Official
11
Exhibit 3-6: Enter Passphrase Screen
Navigation: Enter the passphrase that you originally created and associated with the submission
and click the ‘Next’ button to navigate to the ‘Technical Contact Information’ screen.
3.4.4
Navigation Tree
The navigation tree is located on the left hand side of each screen. You can perform the
following functions using the navigation tree:
Collapse and Expand folders: Each section of the submission falls under a collapsible
folder within the navigation tree, which allows you to save space or easily view items in the
navigation tree. When a folder is expanded, you can click the minus sign (-), the folder icon
( ), or the folder title link to collapse that section of the navigation tree. When a folder is
collapsed, you can click the plus sign (+), the folder icon ( ), or the folder title link to
expand that section of the navigation tree. When you place your cursor over a folder title
link, it will highlight in red.
Open and Close the Navigation Tree: To provide more visual form space, a navigation
arrow ( ) that opens and closes the navigation tree is located to the right of the navigation
tree. Click the arrow ( ) to close the navigation tree and increase the space of the form
content. Likewise, click the arrow ( ) on the closed navigation tree to open the navigation
tree.
Navigate between screens: You can use the navigation tree to navigate between the
various screens within the application. Each screen of the submission is denoted with a
form icon ( ). You can click the form icon ( ) or the screen title link to navigate to the
selected screen. You are required to save all information entered on a particular screen
before navigating to the next screen or all entered information will be lost. A prompt will
appear after you click a link in the navigation tree indicating, ‘Are you sure you want to
FYI Submission User Guide
Primary Authorized Official
12
leave the current page? Any unsaved changes will be lost.’ If you click the ‘OK’ button,
you will be taken to the requested screen without saving any of the data in the previous
screen. If you click the ‘Cancel’ button, the prompt will close and you will not be taken to
the requested screen.
Add Chemical: You can click the ‘Add Chemical’ button located at the bottom of the
navigation tree to add another chemical report within a single submission. Clicking the
‘Add Chemical’ button will generate another chemical report folder containing a ‘Chemical
Information’ screen and a ‘Document Management’ screen. The system provides a
‘Remove’ icon ( ) that allows you to remove any unwanted chemical report folders.
Exhibit 3-7 shows a screen capture of the navigation prompt window:
Exhibit 3-7: Navigation Prompt
Exhibit 3-8 shows the screen capture of the navigation tree:
FYI Submission User Guide
Primary Authorized Official
13
Exhibit 3-8: Navigation Tree
3.4.5
Action Bar
The action bar is located at the bottom of each screen. You can perform the following functions
using the action bar:
Validate: You can click the ‘Validate’ icon ( ) at any stage of completing an FYI
submission. An ‘FYI Validation’ pop-up window is generated when you click the
‘Validate’ icon ( ). The ‘FYI Validation’ pop-up window displays a report of all
validation errors that failed validation. Refer to Section 4 for more information on
validating a submission.
The following exhibits Exhibit 3-9, Exhibit 3-10, Exhibit 3-11, and Exhibit 3-12 show the screen
captures for the action bar:
FYI Submission User Guide
Primary Authorized Official
14
Exhibit 3-9: Action Bar – Validate
Save: You can click the ‘Save’ icon ( ) at any stage of completing an FYI submission.
After you click the ‘Save’ icon ( ), the data entered on the screen will save. The ‘Save’
function does not validate any entered data.
Exhibit 3-10: Action Bar – Save
Preview: You can click the ‘Preview’ icon ( ) at any stage of completing an FYI
submission to preview the submission. After you click the ‘Preview’ icon ( ), a
watermarked PDF version of the submission will generate.
Exhibit 3-11: Action Bar – Preview
Submit: You can click the ‘Submit’ icon ( ) to submit the FYI submission after you or
the Support have completed all required sections of the FYI submission process. After you
click the ‘Submit’ icon ( ), the validation process is initiated. Refer to Section 4 for
further instructions on validation errors. You can continue the submission process only
after clearing all validation errors. Refer to Section 5 for more information on submitting
an FYI submission.
Exhibit 3-12: Action Bar – Submit
Help Links: You can click any of the ‘Help’ links, located at the bottom of each screen, at
any stage of completing an FYI submission.
If you click the ‘CDX Homepage’ link, you will be taken to the CDX Homepage.
If you click the ‘MyCDX Homepage’ link, you will be taken to the CDX Login screen.
If you click the ‘EPA Homepage’ link, you will be taken to the EPA Homepage.
FYI Submission User Guide
Primary Authorized Official
15
If you click the ‘Terms and Conditions’ link, you will be taken to the CDX Terms and
Conditions screen.
If you click the ‘Privacy Notice’ link, you will be taken to the CDX Privacy and Security
Notice screen.
Exhibit 3-13 shows the screen capture of the action bar ‘Help’ links:
Exhibit 3-13: Action Bar – Help Links
3.4.6
Technical Contact Information Screen
You can access the ‘Technical Contact Information’ screen by clicking the ‘Start New
Submission’ button on the ‘FYI’ submissions screen and creating a new passphrase, or by
accessing an FYI submission that is in progress and entering the passphrase associated with the
selected submission.
The ‘Technical Contact Information’ screen allows you to submit on behalf of another company
or submit on behalf of a consortium. To identify if you are submitting on behalf of another
entity, the system provides the radio button for ‘This is a submission on behalf of a consortium.’
To identify if you are submitting on behalf of another company, the system provides the radio
button ‘This is a submission on behalf of another company.’ The system will not allow you to
select more than one radio button per submission.
If you are submitting on behalf of another company, select the ‘This is a submission on behalf of
another company’ radio button. This functionality has been implemented to accommodate a
company that may use an agent or another individual to complete the submission. If this radio
button is selected, you can enter the contact information for the manufacturing or processing
establishment on whose behalf the submission is being made into the ‘Submitting on Behalf Of
Company’ screen upon clicking the ‘Next’ button. If the radio button for ‘This is a submission
on behalf of a consortium’ is selected, you are taken to the ‘Submitting on Behalf of Consortium’
screen upon clicking the ‘Next’ button.
The following fields are displayed on the ‘Technical Contact Information’ screen:
CBI: Checking this checkbox will claim the technical contact information as CBI.
Submission Alias: This field is auto-populated with a time stamp and displays on the ‘FYI’
submissions screen within the ‘Submission Alias’ column. This field is editable should you
choose to provide your own submission alias.
N/A: Selecting the ‘N/A’ radio button allows you to signify that you are neither making a
submission on behalf of a consortium nor making a submission on behalf of another
company.
This is a submission on behalf of a consortium: Selecting the ‘This is a submission on
behalf of a consortium’ radio button allows you to identify yourself as an individual
submitting on behalf of a consortium.
This is a submission on behalf of another company: Selecting the ‘This is a submission
on behalf of another company’ radio button allows you to identify yourself as an individual
submitting on behalf of another company.
FYI Submission User Guide
Primary Authorized Official
16
Copy CDX Registration: Clicking the ‘Copy CDX Registration’ button will automatically
populate the fields with your contact information provided during CDX registration.
Prefix: Displays all optional prefixes. If applicable, select the appropriate prefix. If you
have clicked the ‘Copy CDX Registration’ button, the fields populate with information
entered during CDX registration.
First Name: Enter the technical contact’s first name. If you have clicked the ‘Copy CDX
Registration’ button, the fields populate with information entered during CDX registration.
This is a required field.
Middle Initial: Enter the technical contact’s middle initial. If you have clicked the ‘Copy
CDX Registration’ button, the fields populate with information entered during CDX
registration.
Last Name: Enter the technical contact’s last name. If you have clicked the ‘Copy CDX
Registration’ button, the fields populate with information entered during CDX registration.
This is a required field.
Suffix: Displays all optional suffixes. If applicable, select the appropriate suffix. If you
have clicked the ‘Copy CDX Registration’ button, the fields populate with information
entered during CDX registration.
Company Name: Enter the technical contact’s company name. If you have clicked the
‘Copy CDX Registration’ button, the fields populate with information entered during CDX
registration. This is a required field.
Phone Number: Enter the technical contact’s daytime phone number; US or international.
If you have clicked the ‘Copy CDX Registration’ button, the fields populate with
information entered during CDX registration. This is a required field.
Email Address: Enter the technical contact’s email address. The email address must
follow the standard email address format: john.doe@abc.com. If you have clicked the
‘Copy CDX Registration’ button, the fields populate with information entered during CDX
registration. This is a required field.
Mailing Address 1: Enter the first line of the technical contact’s mailing address. If you
have clicked the ‘Copy CDX Registration’ button, the fields populate with information
entered during CDX registration. This is a required field.
Mailing Address 2: Enter the second line of the technical contact’s mailing address. If you
have clicked the ‘Copy CDX Registration’ button, the fields populate with information
entered during CDX registration.
City: Enter the city of the technical contact’s mailing address. If you have clicked the
‘Copy CDX Registration’ button, the fields populate with information entered during CDX
registration. This is a required field.
State: Enter the state of the technical contact’s mailing address. If you have clicked the
‘Copy CDX Registration’ button, the fields populate with information entered during CDX
registration. This is a required field if the ‘Country’ field is ‘United States.’
Postal Code: Enter the postal code of the technical contact’s mailing address. If you have
clicked the ‘Copy CDX Registration’ button, the fields populate with information entered
during CDX registration. This is a required field.
FYI Submission User Guide
Primary Authorized Official
17
Country: Displays all available countries. Select the country of the technical contact’s
mailing address. If you have clicked the ‘Copy CDX Registration’ button, the fields
populate with information entered during CDX registration. This is a required field.
Exhibit 3-14 shows the screen capture for the ‘Technical Contact Information’ screen:
Exhibit 3-14: Technical Contact Information Screen
Navigation: Click the ‘Next’ button to navigate to the ‘Chemical Identification’ screen if you are
not submitting on behalf of a consortium or another company. You can also access this screen by
clicking the ‘Chemical Identification’ link within the navigation tree. If you are submitting on
behalf of another company, you are taken to the ‘Submitting on Behalf Of Company’ screen.
Click the ‘Submitting On Behalf of Company’ link within the navigation tree to access this
screen. If you are submitting on behalf of a consortium, you are taken to the ‘Submitting on
FYI Submission User Guide
Primary Authorized Official
18
Behalf of Consortium’ screen. You can also access this screen by clicking the ‘Submitting On
Behalf of Consortium’ link within the navigation tree.
3.4.7
Submitting on Behalf Of Company Screen
You can access the ‘Submitting on Behalf Of Company’ screen by selecting the ‘This is a
submission on behalf of another company’ radio button and clicking the ‘Next’ button from the
‘Technical Contact Information’ screen. You can also access this screen by clicking the
‘Submitting on Behalf of Company’ link within the navigation tree.
The ‘Submitting on Behalf Of Company’ screen presents you with a list of fields that allows you
to input the contact information for the manufacturing or processing establishment on whose
behalf the submission is being made.
The following fields are displayed on the ‘Submitting on Behalf of Company’ screen:
CBI: Checking this checkbox will claim the ‘Submitting on Behalf of Company’
information as CBI.
Prefix: The ‘Prefix’ drop-down menu displays all optional prefixes. If applicable, select
the appropriate prefix.
First Name: Enter the first name of the manufacturing or processing establishment
contact for which the submission is being made. This is a required field.
Middle Initial: Enter the middle initial of the manufacturing or processing establishment
contact for which the submission is being made.
Last Name: Enter the last name of the manufacturing or processing establishment contact
for which the submission is being made. This is a required field.
Suffix: The ‘Suffix’ drop-down menu displays all optional suffixes and captures the suffix
of the manufacturing or processing establishment contact for which the submission is
being made. If applicable, select the appropriate suffix.
Company Name: Enter the company name of the manufacturing or processing
establishment. This is a required field.
Phone Number: Enter the daytime telephone number of the manufacturing or processing
establishment contact for whom the submission is being made; US or international. This
field does not accept dashes. This is a required field.
Email Address: Enter the email address of the manufacturing or processing establishment
contact for which the submission is being made. The email address must follow the
standard email address format: john.doe@abc.com. This is a required field.
Mailing Address 1: Enter the first line of the mailing address of the manufacturing or
processing establishment contact. This is a required field.
Mailing Address 2: Enter the second line of the mailing address of the manufacturing or
processing establishment contact.
City: Enter the city of the mailing address of the manufacturing or processing
establishment contact. This is a required field.
FYI Submission User Guide
Primary Authorized Official
19
State: Enter the state of the mailing address of the manufacturing or processing
establishment contact. This is a required field if the ‘Country’ field is defined as ‘United
States.’
Postal Code: Enter the postal code of the mailing address of the manufacturing or
processing establishment contact. This is a required field.
Country: Enter the country of the mailing address of the manufacturing or processing
establishment contact. This is a required field.
Exhibit 3-15 shows the screen capture of the ‘Submitting on Behalf of Company’ screen:
Exhibit 3-15: Submitting on Behalf of Company Screen
Navigation: Click the ‘Next’ button to navigate to the ‘Chemical Identification’ screen. You can
also access this screen by clicking the ‘Chemical Identification’ link within the navigation tree.
FYI Submission User Guide
Primary Authorized Official
20
3.4.8
Submitting on Behalf of Consortium Screen
You can access the ‘Submitting on Behalf of Consortium’ screen by selecting the ‘This is a
submission on behalf of a consortium’ radio button and by clicking the ‘Next’ button from the
‘Technical Contact Information’ screen. You can also access this screen by clicking the
‘Submitting on Behalf of Consortium’ link within the navigation tree.
The ‘Submitting on Behalf of Consortium’ screen allows you to enter contact information for
each consortium member. The system provides you with the ability to identify the consortium
name. The contact information of the logged in user will pre-populate the first consortium field
set; this information is editable. To add a consortium member, click the ‘Add’ button to display
fields that can be populated and saved. You can click the ‘Save’ button for each consortium
member added to capture all information entered on the screen. A minimum of two consortium
members must be added to pass validation.
The following fields are displayed on the ‘Submitting on Behalf of Consortium’ screen:
CBI: Checking this checkbox will claim the ‘Submitting on Behalf of Consortium’
information as CBI.
Consortium Name: Enter the name of the consortium.
Prefix: The ‘Prefix’ drop-down menu displays all optional prefixes and captures the
consortium member contact’s prefix. If applicable, select the appropriate prefix.
First Name: Enter the consortium member contact’s first name. This field is required.
Middle Initial: Enter the consortium member contact’s middle initial.
Last Name: Enter the consortium member contact’s last name. This field is required.
Suffix: The ‘Suffix’ drop-down menu displays all optional suffixes and captures the
consortium member contact’s suffix.
Company Name: Enter the consortium member contact’s company name. This field is
required.
Phone Number: Enter the consortium member contact’s day time telephone number; US
or international. This field does not accept dashes. This field is required.
Email Address: Enter the consortium member contact’s email address. The email address
must follow the standard email address format: john.doe@abc.com. This field is required.
Mailing Address 1: Enter the first line of the consortium member contact’s mailing
address. This field is required.
Mailing Address 2: Enter the second line of the consortium member contact’s mailing
address.
City: Enter the city of the consortium member contact’s mailing address. This is a
required field.
State: Enter the state of the consortium member contact’s mailing address. This field is
required only if the country field is set to ‘United States.’
Postal Code: Enter the postal code of the consortium member contact’s mailing address.
This field is required.
FYI Submission User Guide
Primary Authorized Official
21
Country: Enter the country of the mailing address of the consortium contact. This is a
required field.
Exhibit 3-16 shows the screen captures for the ‘Submitting on Behalf of Consortium’ screen:
Exhibit 3-16: Submitting on Behalf of Consortium Screen
Navigation: Click the ‘Next’ button to navigate to the ‘Chemical Identification’ screen. You can
also access this screen by clicking the ‘Chemical Identification’ link within the navigation tree.
3.4.9
Chemical Identification Screen
You can access the ‘Chemical Identification’ screen by clicking the ‘Next’ button from the
‘Submitting on Behalf Of Company’ screen (if you selected the ‘This is a submission on behalf
of another company’ radio button), by clicking the ‘Next’ button from the ‘Submitting on
Behalf of Consortium’ screen (if you selected the ‘This is a submission on behalf of a
FYI Submission User Guide
Primary Authorized Official
22
consortium’ radio button), or by clicking the ‘Next’ button from the ‘Technical Contact
Information’ screen (if you selected the ‘N/A’ radio button). You can also access this screen by
clicking the ‘Chemical Identification’ link within the navigation tree.
The ‘Chemical Identification’ screen provides a ‘Chemical Alias’ field to help distinguish
between chemical reports when there is more than one chemical report. If you provide a
chemical alias, the chemical alias will display within the navigation tree. If you do not provide a
chemical alias, ‘Chemical Report’ will remain as the title of each chemical report folder.
To access Substance Registry Services (SRS) you will identify if you are reporting for a mixture
by selecting the ‘Yes’ or ‘No’ radio button for ‘Is this a submission for a mixture?.’ If you
identify you are submitting for a mixture, the system provides a ‘Please provide the mixture,
compound, or product name’ optional text box. The mixture name text box does not appear if
you select ‘No’ for ‘Is this a submission for a mixture?’.
The following fields are displayed on the ‘Chemical Identification’ screen:
Chemical Alias: The chemical alias is used to help distinguish between chemical reports
within the navigation tree when there is more than one. A chemical alias can be created for
each chemical report folder. If a chemical alias is not identified, ‘Chemical Report’ will
remain as the chemical report folder title within the navigation tree.
This is a submission for a mixture: Selecting the ‘Yes’ radio button captures if you are
reporting for a mixture.
Please check this checkbox if the mixture is CBI: Clicking this checkbox will claim the
entire chemical mixture as CBI. Checking the CBI checkbox will disable all individual
chemical CBI checkboxes.
Please provide the mixture, compound, or product name: Enter the mixture,
compound, or product’s name.
Add: Clicking the ‘Add’ button will generate a chemical substance field set.
Search SRS: Clicking the ‘Search SRS’ button will generate a pop-up window to perform
an SRS search. Refer to Section 3.4.9.1 for further details.
Chemical Identifying Number: Displays the chemical identifying number for the
specified chemical substance.
Chemical Name: Displays the chemical name of the specified substance.
Synonym: Displays the chemical synonym(s) identified by the user. Clicking the ‘Add’
icon ( ) will allow you to enter up to three synonyms for the identified chemical
substance. Click the ‘Delete’ icon ( ) to delete a synonym.
Mixture (%): Enter the percent composition of each chemical within a mixture. This
displays only when you have identified the submission is for a mixture.
Mixture % CBI: Checking this checkbox will claim all mixture percent information as
CBI.
Exhibit 3-17 shows the screen capture of the ‘Chemical Identification’ screen for a user reporting
for a mixture:
FYI Submission User Guide
Primary Authorized Official
23
Exhibit 3-17: Chemical Identification Screen: Submission Is for a Mixture
CBI: Checking the CBI checkbox will claim the chemical as CBI. The CBI checkbox only
appears if the chemical is not found on the TSCA inventory list.
This is a submission for a mixture: Selecting the ‘No’ radio button captures that the user
is not reporting for a mixture.
Search SRS: Clicking the ‘Search SRS’ button will generate a pop-up window to perform
an SRS search. Refer to Section 3.4.9.1 for further details.
Chemical Identifier: Displays the chemical identifying number for the specified chemical
substance.
Chemical Name: Displays the chemical name of the specified substance.
FYI Submission User Guide
Primary Authorized Official
24
Synonym: Displays the chemical synonym(s) identified by the user. Clicking the ‘Add’
icon ( ) will allow you to enter up to three synonyms for the identified chemical
substance. Click the ‘Delete’ icon ( ) to delete a synonym.
Exhibit 3-18: shows the screen capture for the ‘Chemical Identification’ screen for reporting for
a single chemical substance:
Exhibit 3-18: Chemical Identification Screen: Submission Is Not For a Mixture
Navigation: Click the ‘Next’ button to navigate to the ‘Document Management’ screen. You can
also access this screen by clicking the ‘Document Management’ link within the navigation tree.
3.4.9.1
Search Substance Registry Services
Click the ‘Search SRS’ button to generate the ‘Substance Registry Services’ pop-up window.
You can search for the chemical(s) being reported by the ‘Chemical Abstract Service Registry
Number (CASRN),’ ‘CA Index Name or Other Synonym,’ ‘Accession Number,’ or ‘Generic
Name.’ After you have searched for and selected a chemical and clicked the ‘OK’ button, the
selected chemical information will populate the ‘Chemical Identification’ screen. See Section
Error! Reference source not found. below if you don’t know the CAS or Accession Number.
CASRN: Enter the CASRN of the chemical.
CA Index Name or Other Synonym: Enter the CA Index Name or Other Synonym of
the chemical. Displays the following search options: ‘Contains,’ ‘Begins With,’ and
‘Matches Exactly.’
Accession Number: Enter the accession number of the chemical. Displays the following
search options: ‘Contains,’ ‘Begins With,’ and ‘Matches Exactly.’
FYI Submission User Guide
Primary Authorized Official
25
Generic Name: Enter the generic name of the chemical. Displays the following search
options: ‘Contains,’ ‘Begins With,’ and ‘Matches Exactly.’
Exhibit 3-19 shows the screen capture for the ‘Search Substance Registry Services’ pop-up
window:
Exhibit 3-19: Search Substance Registry Services Pop-Up Window
Navigation: Click the ‘X’ button in the upper-right hand corner of the ‘SRS Search’ window to
close the ‘Substance Registry Services Search’ pop-up window and return to the ‘Chemical
Identification’ screen.
3.4.9.2
Chemical Not Found in Substance Registry Services
You can access the ‘Chemical Not Found in Substance Registry Services’ screen by entering
known information into the SRS window and performing a search. If there are no results, a
message will be returned stating ‘There were no results returned.’ If you are sure the chemical
does not exist in SRS, please click the ‘Create New Chemical’ button to enter the chemical
information. Clicking the ‘Create New Chemical’ button on the ‘Search Substance Registry
Services’ screen takes you to the ‘Chemical Not Found in Substance Registry Services’ screen.
FYI Submission User Guide
Primary Authorized Official
26
Click the ‘Cancel’ button to go back to the ‘Search Substance Registry Services’ screen. When
entering information into the ‘Chemical Not Found in Substance Registry Services’ screen at
least one of the following four fields is required; ‘Accession Number,’ ‘CASRN,’
‘Premanufacture Notice (PMN) Number,’ or ‘International Union of Pure and Applied
Chemistry (IUPAC) Name’
If you do not know the accession number, CASRN, PMN number, or IUPAC number, check the
‘Unknown’ checkbox. Once you check the ‘Unknown’ checkbox, the above mentioned fields are
disabled and you are only required to enter a chemical name (or descriptor).
Unknown: Checking the ‘Unknown’ checkbox disables the ‘Accession Number,’
‘CASRN,’ ‘PMN Number,’ and ‘IUPAC Name’ fields and requires you to enter the
chemical name in the ‘Chemical Name (descriptor)’ field.
Accession Number: If known, enter the accession number of the chemical.
CASRN: If known, enter the CASRN of the chemical.
PMN Number: If known, enter the PMN number of the chemical.
IUPAC Name: If known, enter the IUPAC name of the chemical.
Chemical Name (descriptor): Enter the chemical name/descriptor of the chemical being
reported. This is a required field when the ‘Unknown’ checkbox is checked.
Exhibit 3-20 shows the screen capture for the ‘Chemical Not Found in Substance Registry
Services’ pop-up window:
FYI Submission User Guide
Primary Authorized Official
27
Exhibit 3-20: Chemical Not Found in Substance Registry Services Search Pop-Up
Window
Navigation: Click the ‘OK’ button to populate the entered information and navigate to the
‘Chemical Identification’ screen. Click the ‘Cancel’ button to navigate to the ‘Search Substance
Registry Services’ screen.
The following fields are displayed on the ‘Chemical Identification’ screen if a chemical is not
found in SRS Search:
CBI: Checking this checkbox will claim the chemical identity as CBI.
Chemical Identifier: Displays which identifier you used to label the chemical. The
chemical identifier will vary depending on the data entered in the ‘Chemical Not Found In
Substance Registry Services’ screen.
Chemical Name (descriptor): Displays the chemical name (or descriptor) of the chemical
being reported entered in the ‘Chemical Not Found In Substance Registry Services’
screen.
FYI Submission User Guide
Primary Authorized Official
28
Synonym: Enter the chemical synonym(s).. Clicking the ‘Add’ icon ( ) will allow you
to enter up to three synonyms for the identified chemical substance. Click the ‘Delete’
icon ( ) to delete a synonym.
Exhibit 3-21 shows the screen captures for the ‘Chemical Identification’ screen when it is
populated with a chemical not found in SRS Search:
Exhibit 3-21: Chemical Identification Screen (Populated with chemical not found in SRS
Search)
Navigation: Click the ‘Next’ button to navigate to the ‘Document Management’ screen.
3.4.10
Document Management Screen
You can access the ‘Document Management’ screen by clicking the ‘Next’ button from the
‘Chemical Identification’ screen. You can also access this screen by clicking the ‘Document
Management’ link within the navigation tree.
The ‘Document Management’ screen allows you to upload documents related to FYI
submissions. To add FYI submissions, click the ‘Add Document’ button. Clicking the ‘Add
Document’ button generates the ‘Document Management’ pop-up window.
The ‘Document Management’ pop-up window allows you to attach the submission types: ‘Initial
Submission,’ ‘Follow-up Submission, and ‘Final Report Submission.’
FYI Submission User Guide
Primary Authorized Official
29
The ‘Document Management’ table displays the ‘Report Study Title’ of the document, the
document type, the date the document was attached, and the CBI status of the document. The
system allows you to delete unwanted documents by clicking the ‘Delete’ icon ( ) located
under the ‘Action’ column. Clicking the report study title link generates the ‘Document
Management’ pop-up window. This allows you to view and edit the attached documents.
Add Document: Clicking the ‘Add Document’ button generates the ‘Document
Management’ pop-up window.
Report Study Title: Displays the file name and file extension of the attached file. Clicking
the file name link displays the ‘Document Management’ pop-up window and allows you to
view and edit the attached document.
Submission Type: Displays the submission type chosen in the ‘Document Management’
pop-up window.
Attachment Date: Displays the date the document was attached.
CBI: Displays ‘N’ or ‘Y’ depending on if the CBI checkbox was checked.
Action: Clicking the ‘Delete’ icon ( ) will delete the specified row and all contents
within. A warning message displays to confirm the deletion of the document.
Exhibit 3-22 shows the screen capture of the ‘Document Management’ screen:
Exhibit 3-22: Document Management Screen
The ‘Document Management’ pop-up window allows you to browse for a document from your
hard drive and attach one document at a time. You must enter a report study title and attach one
document. Clicking the ‘Browse’ button will generate the ‘File Upload’ window on your hard
drive. Select the document you wish to attach and click the ‘Open’ button. If a document is
marked as ‘CBI’ then a sanitized copy of the document must be attached. To save the attached
FYI Submission User Guide
Primary Authorized Official
30
document to the ‘Document Management’ screen, click the ‘OK’ button within the ‘Document
Management’ pop-up window.
Report Study Title: Enter the report study title that is unique to this chemical report. This
field is required. This study title must be non-confidential.
CBI: Checking the ‘CBI’ checkbox will claim the uploaded document as CBI.
Submission Type: Allows you to select the submission type for the attachments. Displays
the following options: ‘Initial Submission,’ ‘Follow-up Submission,’ and ‘Final
Submission.’
Original Document: Clicking the ‘Browse’ button will generate the ‘File Upload’
window for you to search for a particular file on your hard drive.
CBI: Checking the ‘CBI’ checkbox will claim the uploaded summary/abstract document
as CBI.
Summary/Abstract: Displays ‘Yes’ and ‘No’ radio buttons. If you select the ‘Yes’ radio
button a document upload will generate. Click the ‘Browse’ button to generate the ‘File
Upload’ window for you to search for a particular file on your hard drive.
Effects: Allows you to select the effect specific to the chemical report. Displays the
following options: ‘Health Effects,’ ‘Environmental Fate,’ ‘Ecotoxicity,’ and ‘Physical
Chemical Properties.’
Endpoints: Allows you to select an endpoint that is specific to the chemical report. The
endpoints will be specific to the effect chosen from the ‘Effects’ drop-down menu. If no
effect is chosen, no endpoints will display.
Refer to Error! Reference source not found. for a complete list of values that are found within
each of the drop-down menus on the ‘Document Management’ pop-up window. If you have
multiple documents that share the same effects and/or endpoints, you must upload each
individual document separately and select values from the drop-down menus.
Exhibit 3-23 shows the screen capture of the ‘Document Management’ pop-up window:
FYI Submission User Guide
Primary Authorized Official
31
Exhibit 3-23: Document Management Pop-Up Window
Navigation: Upload all required documentation and click the ‘OK’ button to save all data to the
‘Document Management’ table.
Exhibit 3-24 shows the screen capture for the ‘Document Management’ screen when a document
is uploaded:
FYI Submission User Guide
Primary Authorized Official
32
Exhibit 3-24: Document Management Screen (Populated)
Navigation: Once all data has been entered, click the ‘Submit’ button located in the action bar to
begin the submission process. .
FYI Submission User Guide
Primary Authorized Official
33
4
Validate
You can click the ‘Validate’ icon ( ) at any stage of completing an FYI submission. The ‘FYI
Submission Validation’ pop-up window is displayed when you click the ‘Validate’ icon ( ) in
the action bar. The ‘FYI Submission Validation’ pop-up window displays a report of all
validation errors. During the validation process, the application validates each screen of the FYI
submission to find missing and invalid data. For example, if a document is claimed as CBI a
sanitized version of the document must be uploaded. If a sanitized version if not uploaded, you
will be unable to complete the submission.
Validation Errors: Errors are denoted by an ‘Error’ icon ( ) and can be fixed by clicking the
error link. The links will display the Screen Title Name (e.g., Chemical Identification) and the
associated error. For example, if you claimed an uploaded document as CBI and have not
attached a sanitized copy prior to validation, the system would display a validation error similar
to ‘Document Management:
You have uploaded a CBI document. A sanitized copy is
required.’ After you click a link, the main application screen will display the screen where the
error occurred so you can easily fix the error. Once you have fixed the error, click the ‘Validate’
icon ( ) again to refresh the ‘FYI Submission Validation’ pop-up window. If the information
you fixed passes validation, the error will be removed from the ‘FYI Submission Validation’
pop-up window. You must fix all validation errors in order to successfully submit to EPA via
CDX.
Warning Messages: Warnings are denoted by a ‘Warning’ icon ( ) and can be fixed by
clicking the warning link. The links will display the Screen Title and the associated warning.
After you click a link, the main application screen will display the section where the warning
occurred so you can easily fix the warning. Once you have fixed the warning(s), click the
‘Validate’ icon ( ) again to refresh the ‘FYI Submission Validation’ pop-up window. If the
information you fixed passes validation, the warning will be removed from the ‘FYI Submission
Validation’ pop-up window. You can pass validation and continue to submit a form to CDX with
active warning messages.
You can close the ‘FYI Validation’ pop-up window by clicking the ‘X’ button located at the top
right of the screen.
FYI Submission User Guide
Primary Authorized Official
34
Exhibit 4-1 shows the screen captures for the ‘FYI Submission Validation’ pop-up window:
Exhibit 4-1: FYI Submission Validation Pop-Up Window
FYI Submission User Guide
Primary Authorized Official
35
5
Submit to EPA via CDX
As the Primary AO, you have the ability to sign and submit FYI submissions to EPA. Any
assigned Supports for your submissions do not have access rights to submit to EPA via CDX.
Once you complete all required information and correct all items failing validation, the system
will allow you to successfully submit.
5.1
Submitting Official Information Screen
Click the ‘Submit’ icon ( ) that is located in the bottom action bar of the FYI application to
access the ‘Submitting Official Information’ screen. This screen is only displayed to the Primary
AO upon submission.
After clicking the ‘Submit’ icon ( ), the system requires you to review your contact
information provided during CDX registration. The system also requires you to identify your job
title.
Exhibit 5-1 shows the screen capture of the ‘Submitting Official Information’ screen:
Exhibit 5-1: Submitting Official Information Screen
Navigation: Click the ‘Next’ button to continue with the submission process and proceed to the
‘Submission Process: Validation’ screen.
FYI Submission User Guide
Primary Authorized Official
36
5.2
Submission Process: Validation Screen
You can access the ‘Submission Process: Validation’ screen by clicking the ‘Next’ button on the
‘Submitting Official Information’ screen.
The ‘Submission Process: Validation’ screen will validate the information entered within the FYI
submission.
Exhibit 5-2 shows the screen capture of the ‘Submission Process: Validation’ screen:
Exhibit 5-2: Submission Process: Validation Screen
After the FYI being submitted is verified, a PDF is generated for the user to view.
Exhibit 5-3 shows the screen capture of the ‘Submission Process: PDF Generation’ screen:
FYI Submission User Guide
Primary Authorized Official
37
Exhibit 5-3: Submission Process: PDF Generation Screen
Navigation: Click the ‘Continue’ button to continue the submission process and proceed to the
‘Cross-Media Electronic Reporting Regulation (CROMERR) Certification’ screen. Click the
‘View PDF’ button to view a copy of the FYI submission.
5.3
CROMERR Certification Screen
Click the ‘Continue’ button on the ‘Submission Process: PDF Generation’ screen to access the
‘Cross-Media Electronic Reporting Regulation (CROMERR) Certification’ screen.
After clicking the ‘Continue’ button on the ‘Submission Process: PDF Generation’ screen, the
system requires you to certify that the submission is CROMERR compliant. By clicking the ‘I
Certify’ button on the ‘CROMERR Certification’ screen; you authenticate all of the information
entered in the submission. Clicking the ‘Cancel’ button will allow you to navigate back to the
FYI application.
Exhibit 5-4 shows the screen capture for the ‘CROMERR Certification’ screen:
FYI Submission User Guide
Primary Authorized Official
38
Exhibit 5-4: CROMERR Certification Screen
Navigation: Click the ‘I Certify’ button to continue with your submission and proceed to the
‘CROMERR Login’ screen.
5.4
CROMERR Login Screen
You can access the ‘CROMERR Login’ screen by clicking the ‘I Certify’ button on the
‘CROMERR Certification’ screen.
To submit the FYI submission, log in to CDX using the credentials you provided during CDX
registration:
Please login with your CDX password: Enter your CDX registration password.
Exhibit 5-5 shows the screen capture of the ‘CROMERR Login’ screen:
FYI Submission User Guide
Primary Authorized Official
39
Exhibit 5-5: CROMERR Login Screen
Navigation: Enter your CDX registration password and click the ‘Next’ button to navigate to the
‘CROMERR Security Question’ screen.
5.5
CROMERR Security Question Screen
You can access the ‘CROMERR Security Question’ screen by entering your CDX registration
password and by clicking the ‘Next’ button on the ‘CROMERR Login’ screen.
The ‘CROMERR Security Question’ screen randomly selects and displays one of the five
CROMERR eSIG-PIN questions you answered on the ‘20-5-1 Question’ screen during CDX
registration.
eSIG-PIN Authorization Code: Provide one of the five secret answers to the questions that
were pulled from the list of 20 CDX security questions.
Exhibit 5-6 shows the screen capture of the ‘CROMERR Security Question’ screen:
FYI Submission User Guide
Primary Authorized Official
40
Exhibit 5-6: CROMERR Security Question Screen
Navigation: Answer the security question and click the ‘Next’ button to navigate to the ‘Submit
to CDX’ screen.
5.6
Submit to CDX Screen
You can access the ‘Submit to CDX’ screen after answering the 20-5-1 security question and by
clicking the ‘Next’ button on the ‘CROMERR Security Question’ screen.
On the ‘Submit to CDX’ screen, you will see a certification message. Read the message and
acknowledge by clicking the ‘Confirm’ button. Once you have clicked the ‘Confirm’ button,
your submission will be submitted to EPA via CDX.
Exhibit 5-7 shows the screen capture of the ‘Submit to CDX’ screen:
FYI Submission User Guide
Primary Authorized Official
41
Exhibit 5-7: Submit to CDX Screen
Navigation: Click the ‘Confirm’ button to navigate to the ‘CROMERR Submission’ screen.
5.7
CROMERR Submission Screen
You can access the ‘CROMERR Submission’ screen by acknowledging the certification to
submit to EPA via CDX by clicking the ‘Confirm’ button on the ‘Submit to CDX’ screen.
On the ‘CROMERR Submission’ screen, you will see a message indicating the submission has
been successfully submitted to EPA via CDX.
Exhibit 5-8 shows the screen capture of the ‘CROMERR Submission’ screen:
FYI Submission User Guide
Primary Authorized Official
42
Exhibit 5-8: CROMERR Submission Screen
Navigation: Click the ‘Finish’ button to navigate to the FYI ‘Home’ screen. Then click the
‘Submissions’ link or tab to find your locked submission. The ‘FYI’ submissions screen will
display the submission with a lock icon ( ) under the ‘Action’ column and will display a status
of ‘Submitted.’
FYI Submission User Guide
Primary Authorized Official
43
6
Download Copy of Record
To download a copy of record, navigate to the ‘FYI’ submissions screen and locate a submission
for which you have successfully completed a submission and which has a status of ‘Submitted.’
Note that if you have just submitted to EPA via CDX, the ’Copy of Record’ icon ( ) may take
15-20 minutes to display. Also, you must refresh the ‘FYI’ submissions screen by clicking your
browser’s refresh button for the ’Copy of Record’ icon ( ) to display.
After you click the ’Copy of Record’ icon ( ), enter the passphrase associated with the
submission on the ‘Enter Passphrase’ screen, and click the ‘OK’ button. If your login was
successful, you will be taken to the ‘CROMERR Login’ screen. The ‘CROMERR Login’ screen
requires you to enter your CDX registration password. Once you enter your CDX registration
password and click the ‘Next’ button, you will be taken to the ‘CROMERR Security Question’
screen. The ‘CROMERR Security Question’ screen randomly selects and displays one of the five
CROMERR eSIG-PIN questions that you answered on the 20-5-1 Question screen during CDX
registration. Answer the CROMERR Security Question and click the ‘OK’ button. If your
answer was successful, you will be taken to the ‘Download Copy of Record’ screen.
The ‘Download Copy of Record’ screen displays the ‘File Name,’ ‘File Type,’ ‘File Size,’ and
‘Actions’ columns in a table format. You can click the ‘Actions’ button to download a PDF
version of the submitted FYI submission or a XML version of the FYI submission. When you
click the ’Copy of Record’ icon ( ), the system will allow you to view or download the
individual files that were uploaded during the submission process.
Exhibit 6-1 shows the screen capture of the ‘Download Copy of Record’ screen:
FYI Submission User Guide
Primary Authorized Official
44
Exhibit 6-1: Download Copy of Record Screen
Exhibit 6-2 shows a screen capture of the download prompt pop-up window:
Exhibit 6-2: Download Prompt Pop-up Window
FYI Submission User Guide
Primary Authorized Official
45
If you click the copy of record icon, you will download the zip file of the FYI submission that
contains the following:
A PDF version of the FYI submission
An XML version of the FYI submission
FYI Submission User Guide
Primary Authorized Official
46
7
Create an Amendment
To amend a submitted FYI submission, navigate to the ‘FYI’ submissions screen and locate a
submission that has a status of ‘Submitted.’ In addition to displaying a status of ‘Submitted’
under the ‘Status’ column, the ‘Lock’ icon ( ) will be displayed under the ‘Action’ column.
Click the ‘Lock’ icon ( ) under the ‘Action’ column to start an amendment.
Exhibit 7-1 shows the screen capture of the ‘FYI’ submissions screen:
Exhibit 7-1: FYI Submissions – Amendment
Navigation: After clicking the ‘Lock’ icon ( ), you will receive a prompt to confirm the unlock
process. Once your submission is unlocked, you will have the ability to update the information
within your document. If you do not want to continue with the amendment, click the ‘Cancel’
button to cancel the amendment process and return to the ‘FYI’ submissions screen. Click the
‘OK’ button to close the prompt and continue with the amendment process.
Exhibit 7-2 shows the screen capture of the ‘Unlock Prompt’ message:
FYI Submission User Guide
Primary Authorized Official
47
Exhibit 7-2: Unlock Prompt Message
After you click the ‘OK’ button, you will be taken to the ‘Enter Passphrase’ screen. You must
enter the passphrase originally associated with the submission to start the amendment process.
After you enter the passphrase and click the ‘Next’ button, you will be taken to the ‘Technical
Contact Information’ screen.
After a submission has been unlocked, the ‘FYI’ submissions screen will display a status of ‘In
Progress’ under the ‘Status’ column, and the ‘Unlocked’ icon ( ) will display under the
‘Action’ column; however, you will not see these changes until you navigate back to the ‘FYI’
submissions screen.
FYI Submission User Guide
Primary Authorized Official
48
8
Resources
You can access the ‘Resources’ screen by clicking the ‘Resources’ link on the FYI ‘Home’
screen or by clicking the ‘Resources’ tab located at the top of the screen at any time during the
submission process. The ‘Resources’ screen provides you with a link to the FYI user guide as
well as additional helpful links. Click the ‘User Guide’ link to access the FYI user guide
document.
Toxic Substances Control Act (TSCA) Section 8(e) Notices and FYI Submissions: If you
click this link, a new internet browser window will generate displaying EPA’s TSCA Section
8(e) Notices screen.
CDX Home: If you click this link, a new internet browser window will generate displaying the
CDX Homepage.
TSCA Chemical Substances Inventory: If you click this link, a new internet browser window
for EPA's TSCA Chemical Substances Inventory screen will be displayed.
Exhibit 8-1: Resources Screen
shows the screen capture of the ‘Resources’ screen:
Exhibit 8-1: Resources Screen
FYI Submission User Guide
Primary Authorized Official
49
Appendix A. Definitions, Acronyms, and Abbreviations
The following table displays all the definitions, acronyms, and abbreviations used in this
document and their full name.
Definitions, Acronyms, and Abbreviations
Acronym
Full Name
AO
Authorized Official
CA
Chemical Abstract
CASRN
Chemical Abstract Service Registry Number
CBI
Confidential Business Information
CDX
CoR
Central Data Exchange
Copy of Record
CROMERR
Cross-Media Electronic Reporting Regulation Security System
CSPP
Submissions for Chemical Safety and Pesticide Programs
CSV
Comma-Separated Values
EPA
Environmental Protection Agency
EST
Eastern Standard Time
FIFRA
Federal Insecticide, Fungicide, and Rodenticide Act
IUPAC
International Union of Pure and Applied Chemistry
OPPT
Office of Pollution Prevention and Toxics
PDF
Portable Document Format
PMN
Premanufacture Notices
SRS
Substance Registry Services
TSCA
Toxic Substances Control Act
UVCB
Unknown or Variable Composition or Complex Reaction Product or Biological Material
XML
Extensible Markup Language
FYI Submission User Guide
Primary Authorized Official
50
Appendix B. Submission Types, Effects, and Endpoints
The following appendix displays all possible options within each drop-down menu on the
‘Document Management’ pop-up window.
First Dropdown:
Title: Submission Type
Contains the following values
o Initial Submission
o Follow-Up Submission
o Final Submission
Second Dropdown
Title: Summary/Abstract Submission
Contains the following values
o Yes
o No
Third Dropdown
Title: Effects
Contains the following values
o Health Effect
o Ecotoxicity
o Environmental Fate
o Physical-Chemical Properties
Fourth Dropdown
Title: Endpoints
Contains the following values
o For Health Effect (shows when Health Effect is selected from third dropdown)
Basic Toxic kinetics
Dermal Absorption
Acute Toxicity: oral
Acute Toxicity: inhalation
Acute Toxicity: dermal
Acute Toxicity: other routes
Skin irritation/corrosion
Eye irritation
Skin sensitization
Respiratory sensitization
Repeated Dose toxicity: oral
Repeated Dose toxicity: inhalation
FYI Submission User Guide
Primary Authorized Official
51
Repeated Dose Toxicity: dermal
Repeated Dose Toxicity: other routes
Genetic Toxicity in vitro
Genetic Toxicity in vivo
Carcinogenicity
Toxicity to Reproduction
Developmental Toxicity/teratogenicity
Toxicity to reproduction: other studies
Neurotoxicity
Immunotoxicity
Specific investigations: other studies
Health surveillance data
Epidemiological data
Direct observations: clinical cases, poisoning incidents and other
Sensitization data (humans)
Exposure related observations in humans: other data
Toxic effects on livestock and pets
Additional toxicological information
Other
o For Ecotoxicity (shows when Ecotoxicity is selected from third dropdown)
Short-term toxicity to fish
Long-term toxicity to fish
Short-term toxicity to aquatic invertebrates
Long-term toxicity to aquatic invertebrates
Toxicity to aquatic algae and cyanobacteria
Toxicity to aquatic plants other than algae
Toxicity to microorganisms
Toxicity to other aquatic organisms
Sediment toxicity
Toxicity to soil macroorganisms except arthropods
Toxicity to terrestrial arthropods
Toxicity to terrestrial plants
Toxicity to soil microorganisms
Toxicity to birds
Toxicity to other above-ground organisms
Biological effects monitoring
Biotransformation and kinetics
Additional ecotoxicological information
Other
FYI Submission User Guide
Primary Authorized Official
52
o For Environmental Fate (shows when Environmental Fate is selected from third
dropdown)
Photo transformation in air
Hydrolysis
Photo transformation in water
Photo transformation in soil
Biodegradation in water: screening test
Biodegradation in water and sediment: simulation tests
Biodegradation in soil
Mode of degradation in actual use
Bioaccumulation: aquatic/sediment
Bioaccumulation: terrestrial
Adsorption/desorption
Henry's Law constant
Distribution Modeling
Other Distribution Data
Monitoring Data
Field Studies
Additional Information on Environmental Fate and Behavior
Other
o For Physical-Chemical Properties (shows when Physical-Chemical Properties is
selected from third dropdown)
Appearance/Physical
Melting Point
Boiling Point
Density
Particle size distribution
Vapor Pressure
Partition Coefficient
Water Solubility
Solubility in Organic Solvent
Surface Tension
Flash Point
Auto Flammability
Flammability
Explosiveness
Oxidizing Properties
Oxidation Reduction Potential
Stability in organic solvents and identity of relevant degradation products
Storage stability and reactivity towards container material
FYI Submission User Guide
Primary Authorized Official
53
FYI Submission User Guide
Primary Authorized Official
Stability: thermal, sunlight, metals
pH
Dissociation constant
Viscosity
Additional physic-chemical information
Other
54
File Type | application/pdf |
Author | Mulvey, Sarah E (CGI Federal) |
File Modified | 2022-09-22 |
File Created | 2013-10-28 |