Burden Tables

0111t16.xlsx

NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal)

Burden Tables

OMB: 2060-0101

Document [xlsx]
Download: xlsx | pdf

Overview

# Respondents
# Responses
Respondent Burden
Agency Burden
Capital & O&M


Sheet 1: # Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports


(A) (B) (C) (D) (E)
Year Number of New Respondents 1 Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents No Longer Subject to the Rule Due to Closure 2 Number of Respondents





(E=A+B+C-D) ERG Notes:
1 38 9,715 0 10 9,743 Table updated to include new respondents since prev ICR. Existing respondents in Yr 3 of prev ICR = 9,715 (assumes 8,753 demo/reno; 400 milling, manufacturing, and fabrication; and 560 landfills). This ICR also reflects 2 additional existing respondents at asbestos converting sources.
2 38 9,743 0 10 9,771
3 38 9,771 0 10 9,799
Average 38 9,743 0 10 9,771
1 New respondents include sources with constructed, reconstructed, and modified affected facilities.
2 On average, ten asbestos-containing waste disposal sites are expected to close over the next three years and will no longer be subject to the rule.

Sheet 2: # Responses

Total Annual Responses

(A)
Information Collection Activity
(B)
Number of Respondents
(C)
Number of Responses
(D)
Number of Existing Respondents That Keep Records But Do Not Submit Reports
(E)
Total Annual Responses
E=(BxC)+D


Asbestos converting operations





Notification and application for construction 0 1 0 0

Report on sample analyses performed during initial 90 days of operation 0 1 0 0

Quarterly operations and monthly sample analysis report 2 4 0 8

Spraying operations





Notification of commencement of operations using materials containing >1% asbestos 0 1 0 0

Excepted waste shipment report 0 1 0 0

Demolition/renovation





Notification by U.S. mail of intent to demolish or renovate 8,781 9 0 79,029

Renotification due to change 8,781 2 0 17,562

Malfunction Reports for owners/operators of ACPRPS Using CTPS AWP 20 2 0 40

Excepted waste shipment report 8,781 3 0 26,343

Milling, manufacturing, and fabricating





Control device maintenance plan 40 1 0 40

Semiannual visible emissions report 400 2 0 800

Excepted waste shipment report 400 1 0 400

New source report 0 1 0 0

Asbestos-containing waste disposal sites





New source report 10 1 0 10

Waste generator reports 560 1 0 560

Waste disposal discrepancy report 560 1 0 560

Improperly contained waste report 560 2 0 1,120

Notification of excavation of asbestos materials 0 1 0 0

Facility closure report 10 1 0 10
ERG Review Notes:



Total 126,482
-prev renewal: 123,571 responses. Net increase due to decrease in electronic notifications.
N/A - Not Applicable

hrs/response: 2


Sheet 3: Respondent Burden

Table 1: Annual Respondent Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal)








Source Type Existing New Closures










Converting 2 0 0




Labor Rates: $122.20 $153.55 $61.51

Demo/Reno 8,781 28 0
Burden item A B C D E F G H





Person-hours
per occurrence
Annual occurrences
per respondent
Person-hours
per respondent
per year (AxB)
Respondents
per year a
Technical hours per
year (CxD)
Management hours per year (Ex0.05) Clerical hours
per year
(Ex0.10)
Annual cost
($) b

ACPRPs using CTPS AWP 20 0

1. Applications N/A







Mill/Mfg/Fab 400 0 0
2. Surveys and studies N/A







Waste disposal 560 10 10
3. Reporting requirements








Total 9,743 38 10
A. Familiarization with rule requirements 1.00 1 1 38 38 1.9 3.8 $5,169.08

Updated # of each respondent to account for growth in prior 3 years (no new growth for converting, Mill/Mfg/Fab or waste disposal, per prior footnotes).


B. Required activities including monitoring or operations See 3D











9,771
C. Gather existing information See 3D, 4E












D. Write reports













i. Asbestos converting operations













Notification and application for construction 80 1 80 0 0 0 0 $0





Report on sample analyses performed during initial 90 days of operation 2 1 2 0 0 0 0 $0





Quarterly operations and monthly sample analysis report 2 4 8 2 16 1 2 $2,176.46





ii. Spraying operations c













Notification of commencement of operations using materials containing >1% asbestos N/A












Excepted waste shipment report d N/A












iii. Demolition/renovation













Notification by US Mail of intent to demolish or renovate 1 9 9 8,781 79,029 3,951.45 7,902.9 $10,750,196.33
9 annual occurrences applied to 100% of respondents, per discussion and clarifications with OAQPS.



Renotification due to change 0.25 2 0.5 8,781 4,390.5 219.53 439.05 $597,233.13





Excepted waste shipment report d 1 3 3 8,781 26,343 1,317.15 2,634.3 $3,583,398.78





Malfunction report if using CTPS AWP 2 2 4 20 80 4.00 8.0 $10,882.28
Reflects 2 companies having up to 2 malfunction reports annually.



iv. Milling, manufacturing, and fabricating













Control device maintenance plan e 1 1 1 40 40 2 4 $5,441.14





Semiannual visible emissions report 1 2 2 400 800 40 80 $108,822.80





Excepted waste shipment report d 0.1 1 0.1 400 40 2 4 $5,441.14





New source report 1 1 1 0 0 0 0 $0





v. Asbestos-containing waste disposal sites













New source report 1 1 1 10 10 0.5 1 $1,360.29





Waste generator reports 0.67 1 0.67 560 375.2 18.76 37.52 $51,037.89





Waste disposal discrepancy report f 1.5 1 1.5 560 840 42 84 $114,263.94





Improperly contained waste report g, h 1.17 2 2.34 560 1,310.4 65.52 131.04 $178,251.75





Notification of excavation of asbestos materials i 2 1 2 0 0 0 0 $0





Facility closure report 2 1 2 10 20 1 2 $2,720.57





Reporting Subtotal



130,332 $15,416,396





4. Recordkeeping requirements













A. Familiarization with rule requirements See 3A












B. Plan activities See 3B












C. Implement activities See 3B












D. Develop record system N/A












E. Time to enter and transmit information













i. Asbestos converting operations













Records of startup performance testing and initial 90 days of operations 0.1 1 0.1 0 0 0 0 $0.00





Waste shipment records 0.1 12 1.2 2 2.4 0.12 0.24 $326.47





ii. Spraying operations c













Waste shipment records N/A












Excepted waste shipment report d N/A












iii. Demolition/renovation













Waste shipment records j 0.1 24 2.4 8,781 21,074.40 1,053.72 2,107.44 $2,866,719.02





Cold weather temperature monitoring k 0.1 147 14.7 0 0 0 0 $0





Excepted waste shipment report d 0.1 3 0.3 8,781 2,634.3 131.7 263.43 $358,339.88





iv. Milling, manufacturing, and fabricating













Cold weather temperature monitoring k 0.1 147 14.7 0 0 0 0 $0





Daily visible emissions l 0.1 637.5 63.75 400 25,500 1,275 2,550 $3,468,726.75





Weekly inspection of air cleaning devices l 0.25 127.5 31.88 400 12,750 637.5 1,275 $1,734,363.38





Waste shipment records 0.1 51 5.1 400 2,040 102 204 $277,498.14





Excepted waste shipment report d 0.1 1 0.1 400 40 2 4 $5,441.14





v. Asbestos-containing waste disposal sites













Time to file and mail waste generator reports See 3D












Waste shipment records 1.5 12 18 560 10,080 504 1,008 $1,371,167.28





Waste management data retention until landfill closure 0.5 1 0.5 10 5 0.25 0.5 $680.14





Record of deed OR utility record notation (if using CTPS AWP) once inactive 0.5 1 0.5 20 10 0.50 1.0 $1,360.29





F. Time to train personnel













i. Asbestos converting operations N/A












ii. Spraying operations c N/A












iii. Demolition/renovation (refresher training) m 8 1 8 8,809 70,472 3,523.6 7,047.2 $9,586,200.45





iv. Milling, manufacturing, and fabricating n N/A












v. Asbestos-containing waste disposal sites o N/A












G. Time for audits N/A












Recordkeeping Subtotal



166,299 $19,670,823





TOTAL ANNUAL BURDEN AND COST (ROUNDED) p



297,000 $35,100,000





TOTAL ANNUAL CAPITAL AND O&M COST (SEE SECTION 6(b)(iii)) p






$0





GRAND TOTAL (LABOR, CAPITAL, AND O&M) p






$35,100,000




















Assumptions:













a EPA estimates an average of 9,743 existing sources will be subject to the rule over the next 3 years. On average during this period, 38 new sources per year will become subject, while 10 existing sources per year will close and will cease to be subject to the rule. The net total is 9,771 sources per year (9,743 + 38 - 10 = 9,771).

The following is a detailed breakdown of the four source categories:
1) 2 existing asbestos converting sources. No new sources are expected.
2) 8,781 existing asbestos demolition/renovation sources. EPA assumes an increase of 28 new sources per year.
3) An annual average of 20 companies will use CTPS to conduct ACPRPs. 4) 400 existing asbestos milling, manufacturing, and fabricating sources. No new sources are expected.
5) Approximately 560 sources will receive asbestos-containing wastes subject to the rule. No net growth will occur because an estimated 10 sites will close annually, while an estimated 10 sites will become subject to the rule by commencing acceptance of asbestos-containing wastes.






b This ICR uses the following labor rates: $122.20 (technical), $153.55 (managerial), and $61.51 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, March 2021, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.





c EPA does not expect any spray operation sources will become subject to the rule over the next three years.





d Report notifying EPA that waste shipment records signed by owners/operators of disposal sites were not received by waste generators within 45 days of the date of waste acceptance by initial transporters.





e The rule requires sources to submit a control device maintenance plan for any air cleaning devices that cannot be inspected on a weekly basis. EPA assumes 10% of sources will submit such maintenance plans.





f Sources are required to submit reports if discrepancies between designated waste shipment and actual received quantities are not resolved with waste generators.





g Active waste disposal sites are required to report the presence of improperly enclosed or uncovered waste, or any asbestos-containing waste material not sealed in leak-tight containers, and submit the waste shipment record.





h EPA assumes respondents will submit reports for improperly contained waste twice per year.





i EPA assumes asbestos-containing waste will not be excavated at any disposal site.





j EPA assumes approximately 4 million cubic yards of waste shipments will be recorded annually for all demolition/renovation contractors, and that each load will be about 20 cubic yards. This would result in approximately 200,000 loads annually (4 million cubic yards/20 cubic yards per load). We estimate approximately 24 loads per contractor per year.





k Based on Agency experience with the rule, operations generally cease from late fall into winter. We thus assume the burden for this activity will be negligible.





l EPA assumes sources will have an average of 2.5 control devices requiring monitoring, and that will operate for 255 days over 51 weeks, annually.





m EPA assumes all existing contractors (8,781) and new contractors entering the market for the first time (28) will spend resources annually on training due to employee turnover and new hires.





n EPA anticipates there will be no direct costs to respondents to train inspectors for Method 9 certification for daily visible emissions monitoring.





o EPA anticipates there will be no burden for waste disposal-related training.





p Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




















Source Type Existing New Closures










Converting 2 0 0










Demo/Reno 8,697 28 0










Mill/Mfg/Fab 400 0 0










Waste disposal 560 10 10










Total 9,659 38 10











Sheet 4: Agency Burden

Table 2: Average Annual EPA Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal)




























Labor Rates: $51.23 $69.04 $27.73




Burden item A B C D E F G H



EPA
person-hours
per occurrence
Annual occurrences
per respondent
EPA
person-hours
per respondent
per year (AxB)
Respondents
per year a
Technical hours
per year
(CxD)
Management
hours per year
(Ex0.05)
Clerical hours
per year
(Ex0.10)
Annual cost
($) b

ERG Notes:

1. Asbestos converting operations








Table 2 revised to address several inconsistencies identified in the previous ICR.

A. Notification and application for construction 80 1 80 0 0 0 0 $0
EPA Notes:

B. Report on sample analyses performed during initial 90 days of operation 1 1 1 0 0 0 0 $0
CTPS AWP malfunction reports added

C. Quarterly operations and monthly sample analysis report 0.5 4 2 2 4 0.2 0.4 $229.82



2. Spraying operations c











A. Notification of commencement of operations using materials containing >1% asbestos N/A










B. Excepted waste shipment report N/A










3. Demolition/renovation











A. Notification by US Mail of intent to demolish or renovate 0.25 6 1.50 8,781 13,171.50 658.58 1,317.15 $756,768.53



C. Renotification due to change 0.25 2 0.5 8,781 4,390.5 219.53 439.05 $252,256.18



D. Excepted waste shipment report 0.5 3 1.5 8,781 13,171.5 658.58 1,317.15 $756,768.53



E. CTPS AWP Malfunction report 0.25 2 0.5 20 10.0 0.50 1.00 $574.55



4. Milling, manufacturing, and fabricating











A. Control device maintenance plan 0.25 1 0.25 40 10 0.5 1 $574.55



B. Semiannual visible emissions report 0.1 2 0.2 400 80 4 8 $4,596.40



C. Excepted waste shipment report 0.5 1 0.5 400 200 10 20 $11,491.00



D. New source report 0.5 1 0.5 0 0 0 0 $0



5. Asbestos-containing waste disposal sites











A. New source report 0.5 1 0.5 10 5 0.25 0.5 $287.28



B. Waste generator reports 4 1 4 560 2,240 112 224 $128,699.20



C. Waste disposal discrepancy report 0.5 1 0.5 560 280 14 28 $16,087.40



D. Improperly contained waste report 0.5 2 1 560 560 28 56 $32,174.80



E. Notification of excavation of asbestos materials 2 1 2 0 0 0 0 $0



F. Facility closure report 1 1 1 10 10 0.5 1 $574.55



TOTAL ANNUAL BURDEN AND COST d 39,300

$1,960,000















8800
Assumptions:











a EPA estimates an average of 9,743 existing sources will be subject to the rule over the next 3 years. On average during this period, 38 new sources per year will become subject, while 10 existing sources per year will close and will cease to be subject to the rule. The net total is 9,771 sources per year (9,743 + 38 - 10 = 9,771).

The following is a detailed breakdown of the four source categories:
1) 2 existing asbestos converting sources. No new sources are expected.
2) 8,781 existing asbestos demolition/renovation sources. EPA assumes an increase of 28 new sources per year.
3) An annual average of 20 companies will use CTPS to conduct ACPRPs. 4) 400 existing asbestos milling, manufacturing, and fabricating sources. No new sources are expected.
5) Approximately 560 sources will receive asbestos-containing wastes subject to the rule. No net growth will occur because an estimated 10 sites will close annually, while an estimated 10 sites will become subject to the rule by commencing acceptance of asbestos-containing wastes.




b This ICR uses the following labor rates: $51.23 (technical), $69.04 (managerial), and $27.71 (clerical). These rates are from the Office of Personnel Management (OPM), 2020 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.



c EPA does not expect any spray operation sources will become subject to the rule over the next three years.



d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




Sheet 5: Capital & O&M

No Capital/Startup and O&M costs for this ICR.
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00