Note: the totals, as shown, update automatically | |||||
Annual Respondent Hours: | 52,641 | Industry Sector | Number of Facilities | Number of Sources | |
Annual Agency Hours: | 6,237 | Pipeline and Transportation of Natural Gas Idustry Sector: | 138 | 307 | |
Annual Respondent Labor Cost (Present Worth): | $5,983,333 | Cement and Concrete Product Manufacturing Industry Sector: | 38 | 47 | |
Annual Agency Labor Cost (Present Worth): | $293,333 | Iron and Steel Mills and Ferroalloy Manufacturing Industry Sector: | 10 | 39 | |
Annual Respondent Non-Labor Cost ($) | $6,017,000 | Glass and Glass Product Manufacturing Industry Sector: | 34 | 44 | |
Annual Agency Non-Labor Cost ($) | $0 | Basic Chemical Manufacturing Industry Sector: | 6 | 17 | |
Total Respondent Cost (Present Worth) | $34,350,000 | Petroleum and Coal Products Manufacturing Industry Sector: | 6 | 10 | |
Total Annual Respondent Cost (Present Worth) | $11,450,000 | Pulp, Paper, and Paperboard Mills Industry Sector: | 19 | 25 | |
No. of Industry Respondents: | 489 | ||||
No. of Agency Respondents (States): | 21 | ||||
Annual Hours/Industry Respondent: | 108 | ||||
Annual Cost/Industry Respondent: | |||||
Annual Hours/Agency Respondent: | 297 | ||||
Annual Cost/Agency Respondent: | |||||
Annual Industry Respondent Recordkeeping Hours: | 10,775 | ||||
Annual Industry Respondent Reporting Hours: | 33,707 | ||||
Total No. of Industry Responses | 236,446 | ||||
Annual No. of Industry Responses | 78,815 |
Industry | Emissions Source Group | Number of Units |
Cement and Concrete Product Manufacturing | Boilers - < 10 Million BTU/hr; Industrial Processes - Kiln | 1 |
Industrial Processes - Kiln | 24 | |
Industrial Processes - Preheater Kiln | 3 | |
Industrial Processes - Preheater/Precalciner Kiln | 19 | |
Glass and Glass Product Manufacturing | Industrial Processes - Container Glass: Melting Furnace | 27 |
Industrial Processes - Flat Glass: Melting Furnace | 13 | |
Industrial Processes - Furnace: General | 1 | |
Industrial Processes - Pressed and Blown Glass: Melting Furnace | 3 | |
Iron and Steel Mills and Ferroalloy Manufacturing | Boilers - > 100 Million BTU/hr | 3 |
Boilers - > 100 Million BTU/hr | 6 | |
Boilers - > 100 Million BTU/hr | 2 | |
Boilers - > 100 Million BTU/hr; Boilers - Blast Furnace Gas | 1 | |
Boilers - > 100 Million BTU/hr; Boilers - Coke Oven Gas | 6 | |
Boilers - > 100 Million BTU/hr; Boilers - Coke Oven Gas | 1 | |
Boilers - Blast Furnace Gas | 1 | |
Boilers - Blast Furnace Gas; Industrial Processes - Sintering: Windbox; Industrial Processes - Blast Furnace: Casting/Tapping: Local Evacuation; Industrial Processes - Process Gas: Process Heaters | 1 | |
Boilers - Coke Oven Gas | 3 | |
Boilers - Coke Oven Gas; Boilers - > 100 Million BTU/hr | 1 | |
Industrial Processes - Basic Oxygen Furnace (BOF): Open Hood Stack | 2 | |
Industrial Processes - Basic Oxygen Furnace (BOF): Open Hood Stack; Industrial Processes - General | 1 | |
Industrial Processes - Basic Oxygen Furnace (BOF): Top Blown Furnace: Primary | 1 | |
Industrial Processes - Blast Furnace: Casting/Tapping: Local Evacuation | 1 | |
Industrial Processes - General | 5 | |
Industrial Processes - General; Industrial Processes - Coke Oven or Blast Furnace | 1 | |
Industrial Processes - Other Not Classified | 2 | |
Industrial Processes - Sintering: Windbox | 1 | |
Pipeline Transportation of Natural Gas | Internal Combustion Engines - 2-cycle Clean Burn | 1 |
Internal Combustion Engines - 2-cycle Lean Burn | 136 | |
Internal Combustion Engines - 4-cycle Lean Burn | 41 | |
Internal Combustion Engines - 4-cycle Rich Burn | 2 | |
Internal Combustion Engines - Reciprocating | 94 | |
Internal Combustion Engines - Reciprocating | 12 | |
Internal Combustion Engines - Reciprocating | 1 | |
Internal Combustion Engines - Turbine | 17 | |
Internal Combustion Engines - Turbine | 3 | |
Basic Chemical Manufacturing | Boilers - > 100 Million BTU/hr | 6 |
Boilers - > 100 Million BTU/hr | 2 | |
Boilers - 10-100 Million BTU/hr | 1 | |
Boilers - 10-100 Million BTU/hr | 1 | |
Boilers - Cogeneration | 1 | |
Boilers - Distillate Oil - Grades 1 and 2: Boiler | 1 | |
Boilers - Petroleum Refinery Gas | 2 | |
Boilers - Petroleum Refinery Gas | 2 | |
Boilers - Subbituminous Coal: Traveling Grate (Overfeed) Stoker | 1 | |
Petroleum and Coal Products Manufacturing | Boilers - > 100 Million BTU/hr | 1 |
Boilers - > 100 Million BTU/hr; Boilers - Blast Furnace Gas | 1 | |
Boilers - Boiler, >= 100 Million BTU/hr | 1 | |
Boilers - Coke Oven Gas | 1 | |
Boilers - Petroleum Refinery Gas | 3 | |
Boilers - Petroleum Refinery Gas | 3 | |
Pulp, Paper, and Paperboard Mills | Boilers - > 100 Million BTU/hr | 5 |
Boilers - > 100 Million BTU/hr | 3 | |
Boilers - > 100 Million BTU/hr | 1 | |
Boilers - 10-100 Million BTU/hr | 2 | |
Boilers - Bituminous Coal: Cyclone Furnace | 2 | |
Boilers - Bituminous Coal: Pulverized Coal: Dry Bottom | 1 | |
Boilers - Bituminous Coal: Pulverized Coal: Dry Bottom; Boilers - > 100 Million BTU/hr | 1 | |
Boilers - Bituminous Coal: Spreader Stoker | 3 | |
Boilers - Cogeneration | 2 | |
Boilers - Fluid Catalytic Cracking Unit with CO Boiler: Natural Gas | 2 | |
Boilers - Subbituminous Coal: Boiler, Spreader Stoker | 2 | |
Boilers - Subbituminous Coal: Spreader Stoker | 1 |
Summary of Annual Respondent Burden and Cost by Industry Sector – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone National Ambient Air Quality Standard: Transport Obligations for non-Electric Generating Units | ||||||||||||||||
Industry Sector & Year |
Technical Hours | Managerial Hours | Clerical Hours | Total Labor Hours | Labor Costs | Present Worth Labor Costs | Non-Labor (Annualized Capital/Startup Cost + Annual O&M Cost) Costs | Total Costs | Present Worth Total Costs | |||||||
Pipeline Transportation of Natural Gas | Discount rate at 3.25% from Larry Sorrells in June 2020 | |||||||||||||||
Year 1 | 29,376 | 1,469 | 2,938 | 33,782 | $4,055,933 | $4,055,933 | $0 | $4,055,933 | $4,055,933 | Present value costs | 2nd year rate | 1.066056 | 3rd year rate | 1.100703078125 | ||
Year 2 | 22,234 | 1,112 | 2,223 | 25,570 | $3,069,947 | $2,879,724 | $204,428 | $3,274,375 | $3,071,485 | |||||||
Year 3 | 20,328 | 1,016 | 2,033 | 23,378 | $2,806,776 | $2,549,985 | $0 | $2,806,776 | $2,549,985 | |||||||
Cement and Concrete Product Manufacturing | ||||||||||||||||
Year 1 | 5,740 | 287 | 574 | 6,601 | $792,481 | $792,481 | $0 | $792,481 | $792,481 | |||||||
Year 2 | 5,693 | 285 | 569 | 6,547 | $785,991 | $737,289 | $0 | $785,991 | $737,289 | |||||||
Year 3 | 5,693 | 285 | 569 | 6,547 | $785,991 | $714,081 | $0 | $785,991 | $714,081 | |||||||
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||||
Year 1 | 3,432 | 172 | 343 | 3,947 | $473,861 | $473,861 | $0 | $473,861 | $473,861 | |||||||
Year 2 | 2,574 | 129 | 257 | 2,960 | $355,396 | $333,375 | $0 | $355,396 | $333,375 | |||||||
Year 3 | 10,914 | 546 | 1,091 | 12,551 | $1,506,879 | $1,369,015 | $7,625,826 | $9,132,705 | $8,297,156 | |||||||
Glass and Glass Product Manufacturing | ||||||||||||||||
Year 1 | 5,366 | 268 | 537 | 6,171 | $740,859 | $740,859 | $0 | $740,859 | $740,859 | |||||||
Year 2 | 5,326 | 266 | 533 | 6,125 | $735,336 | $689,772 | $0 | $735,336 | $689,772 | |||||||
Year 3 | 5,326 | 266 | 533 | 6,125 | $735,336 | $668,060 | $43,648 | $778,984 | $707,715 | |||||||
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Mills | ||||||||||||||||
Year 1 | 1,628 | 81 | 163 | 1,872 | $224,780 | $224,780 | $0 | $224,780 | $224,780 | |||||||
Year 2 | 528 | 26 | 53 | 607 | $72,902 | $68,385 | $0 | $72,902 | $68,385 | |||||||
Year 3 | 13167.6 | 658.38 | 1316.76 | 15142.74 | $1,818,070 | $1,651,735 | $10,171,904 | $11,989,974 | $10,893,014 | |||||||
Total | 137,324 | 6,866 | 13,732 | 157,923 | $18,961,000 | $17,950,000 | $18,050,000 | $37,010,000 | $34,350,000 | |||||||
Average | 45,775 | 2,289 | 4,577 | 52,641 | $6,320,000 | $5,983,000 | $6,017,000 | $12,337,000 | $11,450,000 | |||||||
Total No. of Industry Responses | 236446 | |||||||||||||||
Annual No. of Industry Responses | 78815 |
Summary of Annual Agency Burden and Cost by Industry Sector - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone National Ambient Air Quality Standard: Transport Obligations for non-Electric Generating Units | ||||||||||||||||
Industry Sector & Year |
Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Present Worth Labor Costs | Non-Labor Costs | Total Costs | Present Worth Total Costs | |||||||
Pipeline Transportation of Natural Gas | Discount rate at 3.25% from Larry Sorrells in June 2020 | |||||||||||||||
Year 1 | 2,208 | 110 | 221 | 2,539 | $126,900 | $126,900 | $0 | $126,900 | $126,900 | Present value costs | 2nd year rate | 1.066056 | 3rd year rate | 1.100703078125 | ||
Year 2 | 3,553 | 178 | 355 | 4,086 | $204,100 | $191,453 | $0 | $204,100 | $191,453 | |||||||
Year 3 | 3,553 | 178 | 355 | 4,086 | $204,100 | $185,427 | $0 | $204,100 | $185,427 | |||||||
Cement and Concrete Product Manufacturing | ||||||||||||||||
Year 1 | 891 | 45 | 89 | 1,024 | $51,172 | $51,172 | $0 | $51,172 | $51,172 | |||||||
Year 2 | 891 | 45 | 89 | 1,024 | $51,172 | $48,001 | $0 | $51,172 | $48,001 | |||||||
Year 3 | 891 | 45 | 89 | 1,024 | $51,172 | $46,491 | $0 | $51,172 | $46,491 | |||||||
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||||
Year 1 | 645 | 32 | 65 | 742 | $37,084 | $37,084 | $0 | $37,084 | $37,084 | |||||||
Year 2 | 333 | 17 | 33 | 383 | $19,158 | $17,971 | $0 | $19,158 | $17,971 | |||||||
Year 3 | 333 | 17 | 33 | 383 | $19,158 | $17,406 | $0 | $19,158 | $17,406 | |||||||
Glass and Glass Product Manufacturing | ||||||||||||||||
Year 1 | 834 | 42 | 83 | 959 | $47,906 | $47,906 | $0 | $47,906 | $47,906 | |||||||
Year 2 | 834 | 42 | 83 | 959 | $47,906 | $44,938 | $0 | $47,906 | $44,938 | |||||||
Year 3 | 834 | 42 | 83 | 959 | $47,906 | $43,523 | $0 | $47,906 | $43,523 | |||||||
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Mills | ||||||||||||||||
Year 1 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | |||||||
Year 2 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | |||||||
Year 3 | 470 | 24 | 47 | 541 | $27,018 | $24,546 | $0 | $27,018 | $24,546 | |||||||
Total | 16,269 | 813 | 1,627 | 18,710 | $934,750 | $880,000 | $0 | $934,750 | $880,000 | |||||||
Average | 5,423 | 271 | 542 | 6,237 | $62,320 | $293,000 | $0 | $62,320 | $293,000 |
Pipeline Transportation of Natural Gas | |||||||||||||||
Year 1, Reciprocating Internal Combustion Engines (RICE) | |||||||||||||||
Table 1: Year 1, Respondent Burden and Cost – Pipeline Transportation of Natural Gas, RICE | |||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | ||||||
1. APPLICATIONS | NA | Labor Rates: | |||||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | |||||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 24 | 1 | 24 | 2.58 | 61.89 | 3.09 | 6.19 | $8,545 | Technical | $123.94 | 2.5788 | ||||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | ||||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 307 | 6140 | 307 | 614 | $847,759.01 | 307 | ||||||
B. Required Activities | Number of RICE | 0 | |||||||||||||
New, Reconstructed, Modified Sources - Annual CPMS Performance Evaluation c | New | 2.5788 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||||||||||
Annual CPMS Performance Evaluation | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0.00 | Reconstructed/modified | 33.2788 | 0 | ||||
Repeat Annual CPMS Performance Evaluation | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0.00 | Existing | 307 | 0 | ||||
Existing Sources - Annual CPMS Performance Evaluation and Performance Testing d | Assumed New RICE with SCR or NSCR | 1.3272 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||||||||||
Annual CPMS Performance Evaluation | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0.00 | Assumed New RICE with no SCR or NSCR | 1.2516 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||
Repeat Annual CPMS Performance Evaluation | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0.00 | Assumed Existing RICE with SCR or NSCR | 158 | 0 | ||||
Non EPA-Certified Engine Performance Testing | 24 | 2 | 48 | 230.25 | 11,052 | 552.6 | 1105.2 | $1,525,966.22 | Assumed Existing RICE with no SCR or NSCR | 149 | 460.5 | ||||
Repeat Non EPA-Certified Engine Performance Testing | 24 | 2 | 48 | 11.5125 | 553 | 27.63 | 55.26 | $76,298.31 | Assumed Existing EPA-Certified RICE | 76.75 | Assumed 25% of Existing Population per ECHO database. | 23.025 | |||
New and Existing Sources - Monitoring e | Assumed Existing Non EPA-Certified RICE | 230.25 | Assumed 25% of Existing Population per ECHO database. | 0 | |||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
C. Create Information (Included in 4B) | 0 | ||||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | ||||||||||||||
E. Write Report | 0 | ||||||||||||||
New, Reconstructed, Modified Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Semi-Annual Report Submitted to Administrator of Compliance Statement, SubSection 52.41(d) performance test | 8 | 2 | 16 | 2.58 | 41.26 | 2.06 | 4.13 | $5,697 | 5.1576 | ||||||
Existing Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Non EPA-Certified Engine Performance Test | 2 | 2 | 2 | 241.76 | 483.53 | 24.18 | 48.35 | $66,761.02 | 483.525 | ||||||
Report of Non EPA-Certified Engine Performance Test Results via CEDRI or analogous electronic reporting | 2 | 2 | 2 | 241.76 | 483.53 | 24.18 | 48.35 | $66,761.02 | 483.525 | ||||||
Semi-Annual Report submitted via CEDRI or analogous electronic reporting | 8 | 2 | 16 | 307 | 4912 | 245.6 | 491.2 | $678,207 | 614 | ||||||
Subtotal for Reporting Requirements | 27,286 | $3,275,995 | 0 | ||||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | ||||||||||||||
A. Familiarize with regulatory requirement | 0 | ||||||||||||||
B. Plan Activities | 0 | ||||||||||||||
C. Implement Activities | 0 | ||||||||||||||
D. Record Data | NA | 0 | |||||||||||||
E. Time to Transmit or Disclose Information | 0 | ||||||||||||||
Existing Sources | 0 | ||||||||||||||
Data Collection | 0.1 | 12 | 1.2 | 307 | 368 | 18.42 | 36.84 | $50,865.54 | 3684 | ||||||
Create and Store Engine Maintenance Plan | 0.4 | 1 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 307 | ||||||
Records of Hours of Operation | 0.1 | 4 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 1228 | ||||||
Records of Engine Maintenance Conducted | 0.1 | 4 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 1228 | ||||||
Engines Anticipated with SCR or NSCR | 0 | ||||||||||||||
Daily monitoring of catalyst inlet temperature | 0.005 | 365 | 1.825 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Monthly monitoring of pressure drop across catalyst | 0.1 | 12 | 1.2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Engines Anticipated with no SCR or NSCR | 0 | ||||||||||||||
Prepare CPMS site-specific monitoring plan to address monitoring system design, data collection, and QA/QC. | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Records of Annual CPMS Performance Evaluation | 1 | 1 | 1 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Collect and record the CPMS monitoring parameters. | 0.5 | 1 | 0.5 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
New Sources | 0 | ||||||||||||||
Data Collection | 0 | 0 | 0 | 2.5788 | 0 | 0 | 0 | $0 | 0 | ||||||
Create and Store Maintenance Plan | 0 | 0 | 0 | 2.5788 | 0 | 0 | 0 | $0 | 0 | ||||||
F. Time to Train Personnel of 1st year Existing Sources | 16 | 1 | 16 | 307 | 4,912 | 245.6 | 491.2 | $678,207 | 307 | ||||||
G. Time for Audits | NA | 9133.3114 | SUM | ||||||||||||
Subtotal for Recordkeeping Requirements | 6,496 | $779,938 | |||||||||||||
Total Labor Burden and Cost (rounded) f | 33,800 | $4,060,000 | 159 | hr/response | |||||||||||
Total Capital and O&M Cost (rounded) f | $0 | ||||||||||||||
Grand TOTAL (rounded) f | $4,100,000 | ||||||||||||||
a We have assumed that there are approximately 307 respondents operating RICE and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||||||
c New RICE CPMS performance evaluation conducted annually. We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure. | |||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Pipeline Transportation of Natural Gas | |||||||||||||||
Year 2, Reciprocating Internal Combustion Engines (RICE) | |||||||||||||||
Table 2: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
Number of Responses | ||||||
1. APPLICATIONS | NA | Labor Rates: | 0 | ||||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | ||||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 24 | 1 | 24 | 2.58 | 61.89 | 3.09 | 6.19 | $8,545 | Technical | $123.94 | 2.5788 | ||||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | ||||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
B. Required Activities | Number of RICE | 0 | |||||||||||||
New, Reconstructed, Modified Sources - Annual CPMS Performance Evaluation c | New | 2.5788 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||||||||||
Annual CPMS Performance Evaluation | 8 | 1 | 8 | 1.25 | 10 | 0.50 | 1.00 | $1,382.48 | Reconstructed/modified | 33.2788 | 1.2516 | ||||
Repeat Annual CPMS Performance Evaluation | 8 | 1 | 8 | 0.06 | 1 | 0.03 | 0.05 | $69.12 | Existing | 307 | 0.06258 | ||||
Existing Sources - Annual CPMS Performance Evaluation d | Assumed New RICE with SCR or NSCR | 1.3272 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||||||||||
Annual CPMS Performance Evaluation | 8 | 1 | 8 | 149 | 1,192 | 59.6 | 119.2 | $164,581.23 | Assumed New RICE with no SCR or NSCR | 1.2516 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 149 | |||
Repeat Annual CPMS Performance Evaluation | 8 | 1 | 8 | 7.45 | 60 | 2.98 | 5.96 | $8,229.06 | Assumed Existing RICE with SCR or NSCR | 158 | 7.45 | ||||
Non EPA-Certified Engine Performance Testing | 24 | 2 | 48 | 230.25 | 11,052 | 552.6 | 1105.2 | $1,525,966.22 | Assumed Existing RICE with no SCR or NSCR | 149 | 460.5 | ||||
Repeat Non EPA-Certified Engine Performance Testing | 24 | 2 | 48 | 11.51 | 553 | 27.63 | 55.26 | $76,298.31 | Assumed Existing EPA-Certified RICE | 76.75 | Assumed 25% of Existing Population per ECHO database. | 23.025 | |||
New and Existing Sources - Monitoring e | Assumed Existing Non EPA-Certified RICE | 230.25 | Assumed 25% of Existing Population per ECHO database. | 0 | |||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
C. Create Information (Included in 4B) | 0 | ||||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | ||||||||||||||
E. Write Report | 0 | ||||||||||||||
New, Reconstructed, Modified Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Semi-Annual Report Submitted to Administrator of Compliance Statement, SubSection 52.41(d) performance test | 8 | 2 | 16 | 2.58 | 41.26 | 2.06 | 4.13 | $5,697 | 5.1576 | ||||||
Existing Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Non EPA-Certified Engine Performance Test | 2 | 2 | 2 | 241.76 | 483.53 | 24.18 | 48.35 | $66,761.02 | 483.525 | ||||||
Report of Non EPA-Certified Engine Performance Test Results via CEDRI or analogous electronic reporting | 2 | 2 | 2 | 241.76 | 483.53 | 24.18 | 48.35 | $66,761.02 | 483.525 | ||||||
Semi-Annual Report submitted via CEDRI or analogous electronic reporting | 8 | 2 | 16 | 307 | 4912 | 245.6 | 491.2 | $678,207 | 614 | ||||||
Subtotal for Reporting Requirements | 21,676 | $2,602,498 | 0 | ||||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | ||||||||||||||
A. Familiarize with regulatory requirement | 0 | ||||||||||||||
B. Plan Activities | 0 | ||||||||||||||
C. Implement Activities | 0 | ||||||||||||||
D. Record Data | NA | 0 | |||||||||||||
E. Time to Transmit or Disclose Information | 0 | ||||||||||||||
Existing Sources | 0 | ||||||||||||||
Data Collection | 0.1 | 12 | 1.2 | 307 | 368 | 18.42 | 36.84 | $50,865.54 | 3684 | ||||||
Create and Store Engine Maintenance Plan | 0.4 | 1 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 307 | ||||||
Records of Hours of Operation | 0.1 | 4 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 1228 | ||||||
Records of Engine Maintenance Conducted | 0.1 | 4 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 1228 | ||||||
Engines Anticipated with SCR or NSCR | 0 | ||||||||||||||
Daily monitoring of catalyst inlet temperature | 0.005 | 365 | 1.825 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Monthly monitoring of pressure drop across catalyst | 0.1 | 12 | 1.2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Engines Anticipated with no SCR or NSCR | 0 | ||||||||||||||
Prepare CPMS site-specific monitoring plan to address monitoring system design, data collection, and QA/QC. | 16 | 1 | 16 | 149 | 2,384 | 119.2 | 238.4 | $329,162.46 | 149 | ||||||
Records of Annual CPMS Performance Evaluation | 1 | 1 | 1 | 149 | 149 | 7.45 | 14.9 | $20,572.65 | 149 | ||||||
Collect and record the CPMS monitoring parameters | 0.5 | 1 | 0.5 | 149 | 75 | 3.725 | 7.45 | $10,286.33 | 149 | ||||||
New Sources | 0 | ||||||||||||||
Data Collection | 0 | 0 | 0 | 2.58 | 0 | 0 | 0 | $0 | 0 | ||||||
Create and Store Maintenance Plan | 0 | 0 | 0 | 2.58 | 0 | 0 | 0 | $0 | 0 | ||||||
F. Time to Train Personnel of New Sources | 16 | 1 | 16 | 2.58 | 41 | 2.063 | 4.126 | $5,697 | 2.5788 | ||||||
G. Time for Audits | NA | 9126.65438 | SUM | ||||||||||||
Subtotal for Recordkeeping Requirements | 3,893 | $467,449 | |||||||||||||
Total Labor Burden and Cost (rounded) f | 25,600 | $3,070,000 | 121 | hr/response | |||||||||||
Total Capital and O&M Cost (rounded) f | $0 | ||||||||||||||
Grand TOTAL (rounded) f | $3,100,000 | ||||||||||||||
a We have assumed that there are approximately 307 respondents operating RICE and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||||||
c New RICE CPMS performance evaluation conducted annually. We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure. | |||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Pipeline Transportation of Natural Gas | |||||||||||||||
Year 3, Reciprocating Internal Combustion Engines (RICE) | |||||||||||||||
Table 3: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | ||||||
1. APPLICATIONS | NA | Labor Rates: | 0 | ||||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | ||||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 24 | 1 | 24 | 2.58 | 61.89 | 3.09 | 6.19 | $8,545 | Technical | $123.94 | 2.5788 | ||||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | ||||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
B. Required Activities | Number of RICE | 0 | |||||||||||||
New, Reconstructed, Modified Sources - Annual CPMS Performance Evaluation c | New | 2.5788 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||||||||||
Annual CPMS Performance Evaluation | 8 | 1 | 8 | 1.25 | 10 | 0.50 | 1.00 | $1,382.48 | Reconstructed/modified | 33.2788 | 1.2516 | ||||
Repeat Annual CPMS Performance Evaluation | 8 | 1 | 8 | 0.06 | 1 | 0.03 | 0.05 | $69.12 | Existing | 307 | 0.06258 | ||||
Existing Sources - Annual CPMS Performance Evaluation d | Assumed New RICE with SCR or NSCR | 1.3272 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 0 | |||||||||||
Annual CPMS Performance Evaluation | 8 | 1 | 8 | 149 | 1,192 | 59.6 | 119.2 | $164,581.23 | Assumed New RICE with no SCR or NSCR | 1.2516 | Note: New is assumed to be .84% of existing, per RICE MACT ICR data. | 149 | |||
Repeat Annual CPMS Performance Evaluation | 8 | 1 | 8 | 7.45 | 60 | 2.98 | 5.96 | $8,229.06 | Assumed Existing RICE with SCR or NSCR | 158 | 7.45 | ||||
Non EPA-Certified Engine Performance Testing | 24 | 2 | 48 | 230.25 | 11,052 | 552.6 | 1105.2 | $1,525,966.22 | Assumed Existing RICE with no SCR or NSCR | 149 | 460.5 | ||||
Repeat Non EPA-Certified Engine Performance Testing | 24 | 2 | 48 | 11.51 | 553 | 27.63 | 55.26 | $76,298.31 | Assumed Existing EPA-Certified RICE | 76.75 | Assumed 25% of Existing Population per ECHO database. | 23.025 | |||
New and Existing Sources - Monitoring e | Assumed Existing Non EPA-Certified RICE | 230.25 | Assumed 25% of Existing Population per ECHO database. | 0 | |||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
C. Create Information (Included in 4B) | 0 | ||||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | ||||||||||||||
E. Write Report | 0 | ||||||||||||||
New, Reconstructed, Modified Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Semi-Annual Report Submitted to Administrator of Compliance Statement, SubSection 52.41(d) performance test | 8 | 2 | 16 | 2.58 | 41.26 | 2.06 | 4.13 | $5,697 | 5.1576 | ||||||
Existing Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Non EPA-Certified Engine Performance Test | 2 | 2 | 2 | 241.76 | 483.53 | 24.18 | 48.35 | $66,761.02 | 483.525 | ||||||
Report of Non EPA-Certified Engine Performance Test Results via CEDRI or analogous electronic reporting | 2 | 2 | 2 | 241.8 | 483.53 | 24.18 | 48.35 | $66,761.02 | 483.525 | ||||||
Semi-Annual Report submitted via CEDRI or analogous electronic reporting | 8 | 2 | 16 | 307 | 4912 | 245.6 | 491.2 | $678,207 | 614 | ||||||
Subtotal for Reporting Requirements | 21,676 | $2,602,498 | 0 | ||||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | ||||||||||||||
A. Familiarize with regulatory requirement | 0 | ||||||||||||||
B. Plan Activities | 0 | ||||||||||||||
C. Implement Activities | 0 | ||||||||||||||
D. Record Data | NA | 0 | |||||||||||||
E. Time to Transmit or Disclose Information | 0 | ||||||||||||||
Existing Sources | 0 | ||||||||||||||
Data Collection | 0.1 | 12 | 1.2 | 307 | 368 | 18.42 | 36.84 | $50,865.54 | 3684 | ||||||
Create and Store Engine Maintenance Plan | 0.4 | 1 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 307 | ||||||
Records of Hours of Operation | 0.1 | 4 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 1228 | ||||||
Records of Engine Maintenance Conducted | 0.1 | 4 | 0.4 | 307 | 123 | 6.14 | 12.28 | $16,955.18 | 1228 | ||||||
Engines Anticipated with SCR or NSCR | 0 | ||||||||||||||
Daily monitoring of catalyst inlet temperature | 0.005 | 365 | 1.83 | 158 | 288 | 14.42 | 28.84 | $39,812.92 | 57670 | ||||||
Monthly monitoring of pressure drop across catalyst | 0.1 | 12 | 1.2 | 158 | 190 | 9.48 | 18.96 | $26,178.36 | 1896 | ||||||
Engines Anticipated with no SCR or NSCR | 0 | ||||||||||||||
Prepare CPMS site-specific monitoring plan to address monitoring system design, data collection, and QA/QC. | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Records of Annual CPMS Performance Evaluation | 1 | 1 | 1 | 149 | 149 | 7.45 | 14.9 | $20,572.65 | 149 | ||||||
Collect and record the CPMS monitoring parameters | 0.5 | 1 | 0.5 | 149 | 75 | 3.725 | 7.45 | $10,286.33 | 149 | ||||||
New Sources | 0 | ||||||||||||||
Data Collection | 0 | 0 | 0 | 2.58 | 0 | 0 | 0 | $0 | 0 | ||||||
Create and Store Maintenance Plan | 0 | 0 | 0 | 2.58 | 0 | 0 | 0 | $0 | 0 | ||||||
F. Time to Train Personnel of New Sources | 16 | 1 | 16 | 2.58 | 41 | 2.06 | 4.13 | $5,697 | 2.5788 | ||||||
G. Time for Audits | NA | 68543.65438 | SUM | ||||||||||||
Subtotal for Recordkeeping Requirements | 1,701 | $204,278 | |||||||||||||
Total Labor Burden and Cost (rounded) f | 23,400 | $2,810,000 | 110 | hr/response | |||||||||||
Total Capital and O&M Cost (rounded) f | $0 | ||||||||||||||
Grand TOTAL (rounded) f | $2,800,000 | ||||||||||||||
a We have assumed that there are approximately 307 respondents operating RICE and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||||||
c New RICE CPMS performance evaluation conducted annually. We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure. | |||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Pipeline Transportation of Natural Gas | |||||||||||||||
Year 1, Reciprocating Internal Combustion Engines (RICE) | |||||||||||||||
Table 4: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Responses | ||||||||
annual CPMS performance evaluations c | 8 | 1 | 8 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Technical | $51.23 | 0 | ||||
Repeat annual CPMS performance evaluations d | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0 | Clerical | $27.73 | 0 | ||||
Report Review | 0 | ||||||||||||||
Notification of annual CPMS performance evaluations e | 0.5 | 1.1 | 0.55 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | 0 | ||||||
Review of Semi-annual reports g | 8 | 2 | 16 | 138 | 2208.0 | 110.40 | 220.80 | $126,860.64 | 276 | ||||||
TOTAL (rounded) f | 5.1 | 2,540 | $126,900 | 276 | Sum | ||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 307 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Only facilities with no SCR or NSCR will conduct annual CPMS performance evaluations. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | |||||||||||||||
g 138 facilities operate 307 existing RICE units. |
Pipeline Transportation of Natural Gas | |||||||||||||||
Year 2, Reciprocating Internal Combustion Engines (RICE) | |||||||||||||||
Table 5: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Respones | ||||||||
annual CPMS performance evaluations c | 8 | 1 | 8 | 150.2516 | 1202.0 | 60.1 | 120.2 | $69,061.65 | Technical | $51.23 | 150.2516 | ||||
Repeat annual CPMS performance evaluations d | 8 | 1 | 8 | 7.51258 | 60 | 3 | 6 | $3,453 | Clerical | $27.73 | 7.51258 | ||||
Report Review | 0 | ||||||||||||||
Notification of annual CPMS performance evaluations e | 0.5 | 1.1 | 0.55 | 150.2516 | 82.6 | 4.1 | 8.3 | $4,747.99 | 165.27676 | ||||||
Review of Semi-annual reports g | 8 | 2 | 16 | 138 | 2208.0 | 110.40 | 220.80 | $126,860.64 | 276 | ||||||
TOTAL (rounded) f | 4,090 | $204,100 | 599.04094 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 307 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Only facilities with no SCR or NSCR will conduct annual CPMS performance evaluations. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | |||||||||||||||
g 138 facilities operate 307 existing RICE units. |
Pipeline Transportation of Natural Gas | |||||||||||||||
Year 3, Reciprocating Internal Combustion Engines (RICE) | |||||||||||||||
Table 6: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Responses | ||||||||
annual CPMS performance evaluations c | 8 | 1 | 8 | 150.2516 | 1202.0 | 60.1 | 120.2 | $69,061.65 | Technical | $51.23 | 150.2516 | ||||
Repeat annual CPMS performance evaluations d | 8 | 1 | 8 | 7.51258 | 60 | 3 | 6 | $3,453 | Clerical | $27.73 | 7.51258 | ||||
Report Review | 0 | ||||||||||||||
Notification of annual CPMS performance evaluations e | 0.5 | 1.1 | 0.55 | 150.2516 | 82.6 | 4.1 | 8.3 | $4,747.99 | 165.27676 | ||||||
Review of Semi-annual reports g | 8 | 2 | 16 | 138 | 2208.0 | 110.40 | 220.80 | $126,860.64 | 276 | ||||||
TOTAL (rounded) f | 4,090 | $204,100 | 599.04094 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 307 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Only facilities with no SCR or NSCR will conduct annual CPMS performance evaluations. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | |||||||||||||||
g 138 facilities operate 307 existing RICE units. |
Pipeline Transportation of Natural Gas | ||||||||
Source: RICE | ||||||||
Table 7: Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Year | Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) | |
Year 1 | $0 | 0 | $0 | $0 | $0 | |||
Year 2 | Install CPMS | 0 | $0 | $0 | 149 | $0 | ||
Year 2 | (a) initiala | $724 | 149 | $107,876 | ||||
Year 2 | (b) annualb | $648 | 149 | $96,552 | ||||
Year 3 | CPMS | $0 | ||||||
Year 3 | (a) initial | $0 | $0 | |||||
Year 3 | (b) annual | $0 | $0 | |||||
TOTAL | $0 | $200,000 | ||||||
Total Capital and O&M | ||||||||
a Initial Annual Capital purchase and O&M Cost of $568 (year 2010) was obtained from EC/R, Inc. Memo dated August 8, 2010 and adjusted to a 2023 cost of $724. | ||||||||
b Annual CPMS cost is assumed to be 70% of initial CPMS cost; Annual Capital purchase and O&M Cost of $507 (year 2010) adjusted to a 2023 cost of $724. |
Cement and Concrete Manufacturing | ||||||||||||||
Source: Kilns | ||||||||||||||
Table 15: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | Other EDITS: change PM to NOx | |||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | |||||
1. APPLICATIONS | NA | Labor Rates: | 0 | |||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | |||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | |||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | |||||||||||
A. Familiarize with regulatory requirement | 1 | 1 | 1 | 47 | 47 | 2.35 | 4.7 | $6,489.36 | 47 | |||||
B. Required Activities | Number of kilns | 0 | ||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | |||||||||||
Initial NOx Performance Test (kiln) | 24 | 2 | 48 | 4.7 | 226 | 11.28 | 22.56 | $31,148.93 | Reconstructed/modified | 4.7 | 9.4 | |||
Repeat NOx Performance Test | 24 | 2 | 48 | 0.235 | 11 | 0.564 | 1.128 | $1,557.45 | Existing | 47 | 0.47 | |||
Existing Sources - Annual Testing d | 0 | |||||||||||||
Semi-annual NOx Performance Test (kiln) | 24 | 2 | 48 | 47 | 2,256 | 112.8 | 225.6 | $311,489.30 | 94 | |||||
Repeat NOx Performance Test | 24 | 2 | 48 | 2.35 | 113 | 5.64 | 11.28 | $15,574.47 | 4.7 | |||||
New, Reconstructed, Modified Sources | 0 | |||||||||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 4.7 | 9.4 | 0.47 | 0.94 | $1,297.87 | 4.7 | |||||
Report of Performance Test Results via CEDRI or analogous electronic reporting | 2 | 2 | 4 | 4.7 | 18.8 | 0.94 | 1.88 | $2,595.74 | 9.4 | |||||
Semi-Annual Report submitted via CEDRI or analogous electronic reporting | 8 | 2 | 16 | 0.235 | 3.76 | 0.188 | 0.376 | $519.15 | 0.47 | |||||
Existing Sources | 0 | |||||||||||||
Notification of Semi-annual Performance Test | 2 | 2 | 4 | 47 | 188 | 9.4 | 18.8 | $25,957.44 | 94 | |||||
Report of Semi-Annual Performance Test Results via CEDRI or analogous electronic reporting | 2 | 2 | 4 | 47 | 188 | 9.4 | 18.8 | $25,957.44 | 94 | |||||
Semi-Annual Report submitted via CEDRI or analogous electronic reporting | 8 | 2 | 16 | 47 | 752 | 37.6 | 75.2 | $103,829.77 | 94 | |||||
Subtotal for Reporting Requirements | 4,385 | $422,587 | 0 | |||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | |||||||||||||
A. Familiarize with regulatory requirement | 0 | |||||||||||||
B. Plan Activities | 0 | |||||||||||||
C. Implement Activities | 0 | |||||||||||||
D. Record Data | NA | 0 | ||||||||||||
E. Time to Transmit or Disclose Information | 0 | |||||||||||||
Existing Sources | 0 | |||||||||||||
Data Collection | 0.1 | 2 | 33 | 47 | 1,551 | 77.55 | 155.1 | $214,148.90 | 94 | |||||
Records of Performance Tests | 0.1 | 2 | 24 | 47 | 1,128 | 56.4 | 112.8 | $155,744.65 | 94 | |||||
New Sources | 0 | |||||||||||||
Data Collection | 1.5 | 2 | 3 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
Records of Performance Tests | 0.1 | 2 | 0.2 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 640.14 | Sum | ||||
G. Time for Audits | NA | 35 | hr/response | |||||||||||
Subtotal for Recordkeeping Requirements | 3,081 | $369,894 | ||||||||||||
Total Labor Burden and Cost (rounded) e | 7,500 | $790,000 | ||||||||||||
Total Capital and O&M Cost (rounded) e | $0 | |||||||||||||
Grand TOTAL (rounded) e | $800,000 | |||||||||||||
a We have assumed that there are approximately 47 respondents operating kilns and that 10% of the existing facilities will have new construction/reconstruction. | ||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | ||||||||||||||
c New kilns test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | ||||||||||||||
d The rule requires existing kilns re-test semi-annually for NOx. | ||||||||||||||
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Cement and Concrete Manufacturing | |||||||||||||||
Source: Kilns | |||||||||||||||
Table 16: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Responses | ||||||||
Initial performance tests c | 24 | 1 | 24 | 4.7 | 112.8 | 5.6 | 11.3 | $6,480.92 | Technical | $51.23 | 4.7 | ||||
Repeat performance test d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Clerical | $27.73 | 0 | ||||
Report Review | 0 | ||||||||||||||
Notification of performance test e | 0.5 | 1.1 | 0.55 | 47 | 25.9 | 1.3 | 2.6 | $1,485.21 | 51.7 | ||||||
Review performance test results | 8 | 2 | 16 | 47 | 752.0 | 37.60 | 75.20 | $43,206.16 | 94 | ||||||
TOTAL (rounded) f | 1,020 | $51,200 | 150.4 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 47 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Modified or reconstructed facilities conduct initial testing, and existing facilities (kilns) conduct semi-annual testing. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||
Year 1, Sources: Boilers, Furnaces, Coke Ovens, Windbox | ||||||||||||||
Table 8: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
Number of Respones | |||||
1. APPLICATIONS | NA | Labor Rates: | 0 | |||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | |||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | |||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | |||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 39 | 780 | 39 | 78 | $107,695.77 | 39 | |||||
B. Required Activities | Number of Boilers | 0 | ||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | |||||||||||
Initial Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Reconstructed/modified | 3.9 | 0 | |||
Repeat Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Existing | 39 | 0 | |||
Existing Sources - Initial Testing d | 0 | |||||||||||||
Initial Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Repeat Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
New and Existing Sources - Monitoring e | 0 | |||||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Quarterly Accuracy Assessment | 0 | |||||||||||||
C. Create Information (Included in 4B) | 0 | |||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | |||||||||||||
E. Write Report | 0 | |||||||||||||
New, Reconstructed, Modified Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Notification of Initial Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Report of Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Quarterly Electronic Reports to Administrator | 24 | 4 | 48 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
Existing Sources | 0 | |||||||||||||
Work Plan For Emission Units Not Identified in (d)(a)(i)(2) or (3) [refer to pg. 17 of Reg Text.doc]f | 10 | 1 | 2 | 20 | 40 | 2 | 4 | $5,522.86 | 20 | |||||
Work Plan For Basic Oxygen Process Furnaces | 10 | 1 | 2 | 4 | 8 | 0.4 | 0.8 | $1,104.57 | 4 | |||||
For Taconite Kilns with Existing low-NOx burners, Submit Demonstration Report | 5 | 1 | 2 | 9 | 18 | 0.9 | 1.8 | $2,485.29 | 9 | |||||
For Taconite Kilns with no Existing low-NOx burners, Submit Work Plan | 10 | 1 | 2 | 6 | 12 | 0.6 | 1.2 | $1,656.86 | Note: Assumed that 40% of Taconite Kilns have no existing low-NOx burners. | 6 | ||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Notification of Initial Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Report of Initial Performance Evaluation of NOx CEMS Test Results | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
CEDRI electronic submittal of NOx CEMS Report and Excess Emissions Report | 2 | 4 | 8 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Subtotal for Reporting Requirements | 987 | $118,465 | 0 | |||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | |||||||||||||
A. Familiarize with regulatory requirement | 0 | |||||||||||||
B. Plan Activities | 0 | |||||||||||||
C. Implement Activities | 0 | |||||||||||||
D. Record Data | NA | 0 | ||||||||||||
E. Time to Transmit or Disclose Information | 0 | |||||||||||||
Existing Sources | 0 | |||||||||||||
Data Collection | 0.1 | 330 | 33 | 39 | 1,287 | 64.35 | 128.7 | $177,698.02 | 12870 | |||||
Recordkeeping of NOx emission rate, operating days data, CEMS data | 0.1 | 330 | 33 | 39 | 1,287 | 64.35 | 128.7 | $177,698.02 | 12870 | |||||
New Sources | 0 | |||||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
CEMS Recordkeeping | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
G. Time for Audits | NA | 25818 | Sum | |||||||||||
Subtotal for Recordkeeping Requirements | 2,960 | $355,396 | 18 | hr/response | 12948 | Sum without CEMS | ||||||||
Total Labor Burden and Cost (rounded) g | 3,900 | $470,000 | ||||||||||||
Total Capital and O&M Cost (rounded) g | $0 | |||||||||||||
Grand TOTAL (rounded) g | $500,000 | |||||||||||||
a We have assumed that there are approximately 26 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction. | ||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | ||||||||||||||
c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | ||||||||||||||
d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | ||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | ||||||||||||||
f Estimated number of taconite production kilns located in Minnesota and Michigan. | ||||||||||||||
g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||
Year 2, Sources: Boilers, Furnaces, Coke Ovens, Windbox | ||||||||||||||
Table 9: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | |||||
1. APPLICATIONS | NA | Labor Rates: | 0 | |||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | |||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | |||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | |||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
B. Required Activities | Number of Boilers | 0 | ||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | |||||||||||
Initial Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Reconstructed/modified | 3.9 | 0 | |||
Repeat Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Existing | 39 | 0 | |||
Existing Sources - Initial Testing d | 0 | |||||||||||||
Initial Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Repeat Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
New and Existing Sources - Monitoring e | 0 | |||||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Quarterly Accuracy Assessment | 0 | |||||||||||||
C. Create Information (Included in 4B) | 0 | |||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | |||||||||||||
E. Write Report | 0 | |||||||||||||
New, Reconstructed, Modified Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Notification of Initial Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Report of Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Quarterly Electronic Reports to Administrator | 24 | 4 | 48 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
Existing Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Notification of Initial Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Report of Initial Performance Evaluation of NOx CEMS Test Results | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
CEDRI electronic submittal of NOx CEMS Report and Excess Emissions Report | 2 | 4 | 8 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
Subtotal for Reporting Requirements | 0 | $0 | 0 | |||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | |||||||||||||
A. Familiarize with regulatory requirement | 0 | |||||||||||||
B. Plan Activities | 0 | |||||||||||||
C. Implement Activities | 0 | |||||||||||||
D. Record Data | NA | 0 | ||||||||||||
E. Time to Transmit or Disclose Information | 0 | |||||||||||||
Existing Sources | 0 | |||||||||||||
Data Collection | 0.1 | 330 | 33 | 39 | 1,287 | 64.35 | 128.7 | $177,698.02 | 12870 | |||||
Recordkeeping of NOx emission rate, operating days data, CEMS data | 0.1 | 330 | 33 | 39 | 1,287 | 64.35 | 128.7 | $177,698.02 | 12870 | |||||
New Sources | 0 | |||||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
CEMS Recordkeeping | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
G. Time for Audits | NA | 0 | ||||||||||||
Subtotal for Recordkeeping Requirements | 2,960 | $355,396 | 14 | hr/response | 0 | |||||||||
Total Labor Burden and Cost (rounded) f | 3,000 | $360,000 | 0 | |||||||||||
Total Capital and O&M Cost (rounded) f | $0 | 0 | ||||||||||||
Grand TOTAL (rounded) f | $400,000 | 25740 | SUM | |||||||||||
a We have assumed that there are approximately 26 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction. | ||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | ||||||||||||||
c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | ||||||||||||||
d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | ||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | ||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||
Year 3, Sources: Boilers, Furnaces, Coke Ovens, Windbox | ||||||||||||||
Table 10: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | |||||
1. APPLICATIONS | NA | Labor Rates: | 0 | |||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | |||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | |||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | |||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
B. Required Activities | Number of Boilers | 0 | ||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | |||||||||||
Initial Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 3.9 | 187 | 9.36 | 18.72 | $25,846.98 | Reconstructed/modified | 3.9 | 7.8 | |||
Repeat Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 0.20 | 9 | 0.47 | 0.94 | $1,292.35 | Existing | 39 | 0.39 | |||
Existing Sources - Initial Testing d | Total no. of Taconite kilns | 15 | 0 | |||||||||||
Initial Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 39 | 1,872 | 93.6 | 187.2 | $258,469.85 | Taconite kilns with existing low-NOx burners (at effective date of rule) | 9 | 78 | |||
Repeat Performance Evaluation of NOx CEMS | 24 | 2 | 48 | 1.95 | 94 | 4.68 | 9.36 | $12,923.49 | Taconite kilns with no existing low-NOx burners (at effective date of rule) | 6 | Note: Assumed that 40% of Taconite Kilns have no existing low-NOx burners. | 3.9 | ||
Initial Performance Testing of Taconite Kilns with no existing low-NOx burners (within 5 years of effective date of rule) | 24 | 1 | 24 | 6 | 144 | 7.2 | 14.4 | $19,882.30 | 6 | |||||
Repeat Performance Testing of Taconite Kilns with no existing low-NOx burners (within 5 years of effective date of rule) | 24 | 1 | 24 | 0.3 | 7 | 0.36 | 0.72 | $994.11 | 0.3 | |||||
New and Existing Sources - Monitoring e | 0 | |||||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 39 | 3,861 | 193.05 | 386.1 | $533,094.06 | 12870 | |||||
Quarterly Accuracy Assessment | 8 | 4 | 32 | 39 | 1,248 | 62.40 | 124.8 | $172,313.23 | 156 | |||||
C. Create Information (Included in 4B) | 0 | |||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | |||||||||||||
E. Write Report | 0 | |||||||||||||
New, Reconstructed, Modified Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 3.9 | 7.8 | 0.39 | 0.78 | $1,076.96 | 3.9 | |||||
Notification of Initial Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 3.9 | 7.8 | 0.39 | 0.78 | $1,076.96 | 3.9 | |||||
Report of Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 3.9 | 7.8 | 0.39 | 0.78 | $1,076.96 | 3.9 | |||||
Quarterly Electronic Reports to Administrator | 24 | 4 | 48 | 4 | 192 | 9.6 | 19.2 | $26,510 | 16 | |||||
Existing Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 39 | 78 | 3.9 | 7.8 | $10,769.58 | 39 | |||||
Notification of Initial Performance Evaluation of NOx CEMS | 2 | 1 | 2 | 39 | 78 | 3.9 | 7.8 | $10,769.58 | 39 | |||||
Report of Initial Performance Evaluation of NOx CEMS Test Results | 2 | 1 | 2 | 39 | 78 | 3.9 | 7.8 | $10,769.58 | 39 | |||||
CEDRI electronic submittal of NOx CEMS Report and Excess Emissions Report | 2 | 6 | 12 | 39 | 468 | 23.4 | 46.8 | $64,617.46 | 234 | |||||
Report of Taconite Kiln Performance Testing submitted via CEDRI or analogous electronic reporting (Kilns with no existing low-NOx burners at effective date of rule) | 2 | 1 | 2 | 6.3 | 12.6 | 0.63 | 1.26 | $1,739.70 | 6.3 | |||||
Subtotal for Reporting Requirements | 9,591 | $1,151,483 | 0 | |||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | |||||||||||||
A. Familiarize with regulatory requirement | 0 | |||||||||||||
B. Plan Activities | 0 | |||||||||||||
C. Implement Activities | 0 | |||||||||||||
D. Record Data | NA | 0 | ||||||||||||
E. Time to Transmit or Disclose Information | 0 | |||||||||||||
Existing Sources | 0 | |||||||||||||
Data Collection | 0.1 | 330 | 33 | 39 | 1,287 | 64.35 | 128.7 | $177,698.02 | 12870 | |||||
Recordkeeping of NOx emission rate, operating days data, CEMS data | 0.1 | 330 | 33 | 39 | 1,287 | 64.35 | 128.7 | $177,698.02 | 12870 | |||||
New Sources | 0 | |||||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | 39247.39 | SUM | ||||
CEMS Recordkeeping | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | 59 | hr/response | 39247.09 | Sum without CEMS | ||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | ||||||
G. Time for Audits | NA | |||||||||||||
Subtotal for Recordkeeping Requirements | 2,960 | $355,396 | ||||||||||||
Total Labor Burden and Cost (rounded) f | 12,600 | $1,510,000 | ||||||||||||
Total Capital and O&M Cost (rounded) f | $7,630,000 | |||||||||||||
Grand TOTAL (rounded) f | $9,100,000 | |||||||||||||
a We have assumed that there are approximately 26 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction. | ||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | ||||||||||||||
c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | ||||||||||||||
d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | ||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | ||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||
Year 1, Sources: Boilers, Furnaces, Coke Ovens, Windbox | ||||||||||||||
Table 11: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | ||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Labor Rates: | No. of Responses | |||||||||
Initial Performance Evaluation of NOx CEMS c | 24 | 1 | 24 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | 0 | ||
Repeat Performance Evaluation of NOx CEMS d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Technical | $51.23 | 0 | |||
Report Review | Clerical | $27.73 | 0 | |||||||||||
Review of Work Plan For Emission Units Not Identified in (d)(a)(i)(2) or (3) [refer to pg. 17 of Reg Text.doc] | 8 | 1 | 8 | 20 | 160.0 | 8.00 | 16.00 | $9,192.80 | [12/28/21- se soon to Gina on the # of taconite mills, then subtract that # from the 35 units currently shown] | 20 | ||||
Review of Work Plan for Basic Oxygen Process Furnaces | 8 | 1 | 8 | 4 | 32.0 | 1.60 | 3.20 | $1,838.56 | 4 | |||||
Review Demonstration Report For Taconite Kilns with Existing low-NOx burners | 8 | 1 | 8 | 8 | 64.0 | 3.20 | 6.40 | $3,677.12 | [se Monday to Gina- how many estimated sources?] | 8 | ||||
Review Work Plan For Taconite Kilns with no Existing low-NOx burners | 8 | 1 | 8 | 7 | 56.0 | 2.80 | 5.60 | $3,217.48 | [se Monday to Gina- how many estimated sources?] | 7 | ||||
Notification of Performance Evaluation of NOx CEMS e | 0.5 | 1.1 | 0.55 | 39 | 21.5 | 1.1 | 2.1 | $1,232.41 | 42.9 | |||||
Review test results/CEMS Performance Evaluation Results e | 8 | 1 | 8 | 39 | 312.0 | 15.60 | 31.20 | $17,925.96 | 39 | |||||
Review quarterly electronic summary reports | 8 | 4 | 32 | 0 | 0 | 0.0 | 0.0 | $0.00 | 0 | |||||
TOTAL (rounded) f | 740 | $37,100 | 120.9 | Sum | ||||||||||
Assumptions: | ||||||||||||||
a We have assumed that there are approximately 26 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified. | ||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | ||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | ||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | ||||||||||||||
e Modified, reconstructed, and existing facilities conduct initial testing. | ||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||
Year 2, Sources: Boilers, Furnaces, Coke Ovens, Windbox | ||||||||||||||
Table 12: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | ||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Labor Rates: | No. of Responses | |||||||||
Initial Performance Evaluation of NOx CEMS c | 24 | 1 | 24 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | 0 | ||
Repeat Performance Evaluation of NOx CEMS d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Technical | $51.23 | 0 | |||
Report Review | Clerical | $27.73 | 0 | |||||||||||
Notification of Performance Evaluation of NOx CEMS e | 0.5 | 1.1 | 0.55 | 39 | 21.5 | 1.1 | 2.1 | $1,232.41 | 42.9 | |||||
Review test results/CEMS Performance Evaluation Results e | 8 | 1 | 8 | 39 | 312.0 | 15.60 | 31.20 | $17,925.96 | 39 | |||||
Review quarterly electronic summary reports | 8 | 4 | 32 | 0 | 0 | 0.0 | 0.0 | $0.00 | 0 | |||||
TOTAL (rounded) f | 380 | $19,200 | 81.9 | Sum | ||||||||||
Assumptions: | ||||||||||||||
a We have assumed that there are approximately 26 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified. | ||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | ||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | ||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | ||||||||||||||
e Modified, reconstructed, and existing facilities conduct initial testing. | ||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||||||||
Year 3, Sources: Boilers, Furnaces, Coke Ovens, Windbox | ||||||||||||||
Table 13: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | ||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Labor Rates: | No. of Responses | |||||||||
Initial Performance Evaluation of NOx CEMS c | 24 | 1 | 24 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | 0 | ||
Repeat Performance Evaluation of NOx CEMS d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Technical | $51.23 | 0 | |||
Report Review | Clerical | $27.73 | 0 | |||||||||||
Notification of Performance Evaluation of NOx CEMS e | 0.5 | 1.1 | 0.55 | 39 | 21.5 | 1.1 | 2.1 | $1,232.41 | 42.9 | |||||
Review test results/CEMS Performance Evaluation Results e | 8 | 1 | 8 | 39 | 312.0 | 15.60 | 31.20 | $17,925.96 | 39 | |||||
Review quarterly electronic summary reports | 8 | 4 | 32 | 0 | 0 | 0.0 | 0.0 | $0.00 | 0 | |||||
TOTAL (rounded) f | 380 | $19,200 | 81.9 | Sum | ||||||||||
Assumptions: | ||||||||||||||
a We have assumed that there are approximately 26 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified. | ||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | ||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | ||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | ||||||||||||||
e Modified, reconstructed, and existing facilities conduct initial testing. | ||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Iron and Steel Mills and Ferroalloy Manufacturing | ||||||||
Source: Boilers | ||||||||
Table 14: Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Year | Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) | |
Year 1 | NOx Continuous Emission Monitors | $0 | 0 | $0 | $0 | $0 | ||
Year 1 | Initial CEMS testing | $0 | 0 | $0 | ||||
Year 2 | NOx Continuous Emission Monitors | $0 | 0 | $0 | $0 | |||
Year 2 | Initial CEMS testing | $0 | 0 | $0 | ||||
Year 3 | NOx Continuous Emission Monitors | $153,700 | 0 | $0 | $0 | |||
Year 3 | (a) initiala | $131,222 | $127,002 | 39 | $4,953,078 | |||
Year 3 | (b) annualb | $68,532 | 39 | $2,672,748 | ||||
TOTAL | $0 | $7,630,000 | ||||||
Total Capital and O&M | $7,630,000 | |||||||
a Initial annual capital and O&M cost ($116,459) from Portland Cement ICR (2019) and adjusted to 2023 cost. | ||||||||
b Annual capital and O&M cost ($53,600) from Boiler 5D MACT ICR (2010 ) and adjusted to 2023 cost. |
Glass and Glass Product Manufacturing | |||||||||||||||
Source: Furnaces | |||||||||||||||
Table 17: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | ||||||
1. APPLICATIONS | NA | Labor Rates: | 0 | ||||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | ||||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | ||||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | ||||||||||||
A. Familiarize with regulatory requirement | 1 | 1 | 1 | 40 | 40 | 2 | 4 | $5,522.86 | 40 | ||||||
B. Required Activities | Number of furnaces | 0 | |||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | ||||||||||||
Initial NOx Performance Test (furnaces) | 24 | 2 | 48 | 4.4 | 211 | 10.56 | 21.12 | $29,160.70 | Reconstructed/modified | 4.4 | 8.8 | ||||
Repeat NOx Performance Test | 24 | 2 | 48 | 0.22 | 11 | 0.528 | 1.056 | $1,458.04 | Existing | 44 | 0.44 | ||||
Existing Sources - Annual Testing d | 0 | ||||||||||||||
Semi-annual NOx Performance Test (furnaces) | 24 | 2 | 48 | 44 | 2,112 | 105.6 | 211.2 | $291,607.01 | 88 | ||||||
Repeat NOx Performance Test | 24 | 2 | 48 | 2.2 | 106 | 5.28 | 10.56 | $14,580.35 | 4.4 | ||||||
New, Reconstructed, Modified Sources | 0 | ||||||||||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 4.4 | 8.8 | 0.44 | 0.88 | $1,215.03 | 4.4 | ||||||
Report of Performance Tests submitted via CEDRI or analogous electronic reporting | 2 | 2 | 4 | 4.4 | 17.6 | 0.88 | 1.76 | $2,430.06 | 8.8 | ||||||
Existing Sources | 0 | ||||||||||||||
Notification of Semi-annual Performance Test | 2 | 2 | 4 | 44 | 176 | 8.8 | 17.6 | $24,300.58 | 88 | ||||||
Report of Semi-annual Performance Test Results submitted via CEDRI or analogous electronic reporting | 2 | 2 | 4 | 44 | 176 | 8.8 | 17.6 | $24,300.58 | 88 | ||||||
Subtotal for Reporting Requirements | 3,286 | $394,575 | 0 | ||||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | ||||||||||||||
A. Familiarize with regulatory requirement | 0 | ||||||||||||||
B. Plan Activities | 0 | ||||||||||||||
C. Implement Activities | 0 | ||||||||||||||
D. Record Data | NA | 0 | |||||||||||||
E. Time to Transmit or Disclose Information | 0 | ||||||||||||||
Existing Sources | 0 | ||||||||||||||
Data Collection | 0.1 | 2 | 33 | 44 | 1,452 | 72.6 | 145.2 | $200,479.82 | 88 | ||||||
Records of Performance Tests | 0.1 | 2 | 24 | 44 | 1,056 | 52.8 | 105.6 | $145,803.50 | 88 | ||||||
New Sources | 0 | ||||||||||||||
Data Collection | 1.5 | 2 | 3 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
Records of Performance Tests | 0.1 | 2 | 0.2 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
G. Time for Audits | NA | 0 | |||||||||||||
Subtotal for Recordkeeping Requirements | 2,884 | $346,283 | 506.84 | Sum | |||||||||||
Total Labor Burden and Cost (rounded) e | 6,200 | $740,000 | 29 | hr/response | |||||||||||
Total Capital and O&M Cost (rounded) e | $43,600 | ||||||||||||||
Grand TOTAL (rounded) e | $800,000 | ||||||||||||||
a We have assumed that there are approximately 44 respondents operating furnaces and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||||||
c New furnaces test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | |||||||||||||||
d The rule requires existing furnaces re-test semi-annually for NOx. Existing furnaces are assumed to not have existing CEMS installed. | |||||||||||||||
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Glass and Glass Product Manufacturing | |||||||||||||||
Source: Furnaces | |||||||||||||||
Table 18: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | ||||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Labor Rates: | No. of Responses | ||||||||||
Initial performance tests c | 24 | 1 | 24 | 4.4 | 105.6 | 5.3 | 10.6 | $6,067.25 | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | 4.4 | |||
Repeat performance test d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Technical | $51.23 | 0 | ||||
Report Review | Clerical | $27.73 | 0 | ||||||||||||
Notification of performance test e | 0.5 | 1.1 | 0.55 | 44 | 24.2 | 1.2 | 2.4 | $1,390.41 | 48.4 | ||||||
Review performance test results | 8 | 2 | 16 | 44 | 704.0 | 35.20 | 70.40 | $40,448.32 | 88 | ||||||
TOTAL (rounded) f | 960 | $47,900 | 140.8 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 44 respondents with furnaces and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Modified or reconstructed facilities conduct initial testing, and existing facilities (kilns) conduct semi-annual testing. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Glass and Glass Product Manufacturing | ||||||||
Source: Furnaces | ||||||||
Table 19: Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost a (B X C) |
Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M (E X F) |
||
Performance Tests | 0 | $0 | $0 | 0 | $0 | |||
Monitoring Equipment | 0 | $0 | $0 | 0 | $0 | |||
File Cabinets | 0 | $0 | $0 | 0 | $0 | |||
Inspection of Emission Control Systems b | $0 | 0 | $0 | $992 | 44 | $43,648 | ||
Total c | $0 | $43,600 | ||||||
a No new sources are expected and all existing sources have fully implemented capital costs to comply with the current standards. Therefore, no additional capital/start-up costs are expected. | ||||||||
b We estimate 34 glass manufacturing facilities with 44 affected furnaces. . We assume that annual inspections of emission control systems will require 8 hours per inspection at the current labor rate for technical personnel ($123.94/hr) for each of the 22 affected furnaces with a control device ($123.94 x 8 = $992 (rounded)). | ||||||||
c Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing | |||||||||||||||
Year 1, Boilers | |||||||||||||||
Table 20: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | ||||||
1. APPLICATIONS | NA | Labor Rates: | 0 | ||||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | ||||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | ||||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | ||||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 55 | 1100 | 55 | 110 | $151,878.65 | 55 | ||||||
B. Required Activities | Number of Boilers | 0 | |||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | ||||||||||||
Initial NOx Performance Test (boiler) | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Reconstructed/modified | 5.5 | 0 | ||||
Repeat NOx Performance Test | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Existing | 55 | 0 | ||||
Existing Sources - Initial Testing d | Assumed Units with Existing CEMS | 5.5 | 0 | ||||||||||||
Initial NOx Performance Test (boiler) | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Assumed Units without Existing CEMS | 49.5 | 0 | ||||
Repeat NOx Performance Test | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
New and Existing Sources - Monitoring e | 0 | ||||||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
C. Create Information (Included in 4B) | 0 | ||||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | ||||||||||||||
E. Write Report | 0 | ||||||||||||||
New, Reconstructed, Modified Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Performance Tests | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 24 | 4 | 48 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
Existing Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Initial Performance Test Results | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 2 | 4 | 8 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Subtotal for Reporting Requirements | 1,265 | $151,879 | 0 | ||||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | ||||||||||||||
A. Familiarize with regulatory requirement | 0 | ||||||||||||||
B. Plan Activities | 0 | ||||||||||||||
C. Implement Activities | 0 | ||||||||||||||
D. Record Data | NA | 0 | |||||||||||||
E. Time to Transmit or Disclose Information | 0 | ||||||||||||||
Existing Sources | 0 | ||||||||||||||
Data Collection | 0.4 | 12 | 4.8 | 55 | 264 | 13.2 | 26.4 | $36,450.88 | 660 | ||||||
Records of Montly Fuel Use | 0.4 | 12 | 4.8 | 55 | 264 | 13.2 | 26.4 | $36,450.88 | 660 | ||||||
New Sources | 0 | ||||||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
Records of Monthly Fuel Use | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
G. Time for Audits | NA | 0 | |||||||||||||
Subtotal for Recordkeeping Requirements | 607 | $72,902 | 1375 | Sum | |||||||||||
Total Labor Burden and Cost (rounded) f | 1,900 | $220,000 | 9 | hr/response | |||||||||||
Total Capital and O&M Cost (rounded) f | $0 | ||||||||||||||
Grand TOTAL (rounded) f | $200,000 | ||||||||||||||
a We have assumed that there are approximately 55 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||||||
c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | |||||||||||||||
d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | |||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing | |||||||||||||||
Year 2, Boilers | |||||||||||||||
Table 21: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | ||||||
1. APPLICATIONS | NA | Labor Rates: | 0 | ||||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | ||||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | ||||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | ||||||||||||
A. Familiarize with regulatory requirement | 1 | 1 | 1 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
B. Required Activities | Number of Boilers | 0 | |||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | ||||||||||||
Initial NOx Performance Test (boiler) | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Reconstructed/modified | 5.5 | 0 | ||||
Repeat NOx Performance Test | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Existing | 55 | 0 | ||||
Existing Sources - Initial Testing d | Assumed Units with Existing CEMS | 5.5 | 0 | ||||||||||||
Initial NOx Performance Test (boiler) | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | Assumed Units without Existing CEMS | 49.5 | 0 | ||||
Repeat NOx Performance Test | 24 | 2 | 48 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
New and Existing Sources - Monitoring e | 0 | ||||||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
C. Create Information (Included in 4B) | 0 | ||||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | ||||||||||||||
E. Write Report | 0 | ||||||||||||||
New, Reconstructed, Modified Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Performance Tests | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 24 | 4 | 48 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
Existing Sources | 0 | ||||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Notification of Initial Performance Test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Report of Initial Performance Test Results | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 2 | 4 | 8 | 0 | 0 | 0 | 0 | $0.00 | 0 | ||||||
Subtotal for Reporting Requirements | 0 | $0 | 0 | ||||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | ||||||||||||||
A. Familiarize with regulatory requirement | 0 | ||||||||||||||
B. Plan Activities | 0 | ||||||||||||||
C. Implement Activities | 0 | ||||||||||||||
D. Record Data | NA | 0 | |||||||||||||
E. Time to Transmit or Disclose Information | 0 | ||||||||||||||
Existing Sources | 0 | ||||||||||||||
Data Collection | 0.4 | 12 | 4.8 | 55 | 264 | 13.2 | 26.4 | $36,450.88 | 660 | ||||||
Records of Montly Fuel Use | 0.4 | 12 | 4.8 | 55 | 264 | 13.2 | 26.4 | $36,450.88 | 660 | ||||||
New Sources | 0 | ||||||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
Records of Monthly Fuel Use | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 0 | ||||||
G. Time for Audits | NA | 0 | |||||||||||||
Subtotal for Recordkeeping Requirements | 607 | $72,902 | 1320 | Sum | |||||||||||
Total Labor Burden and Cost (rounded) f | 600 | $70,000 | 3 | hr/response | |||||||||||
Total Capital and O&M Cost (rounded) f | $0 | ||||||||||||||
Grand TOTAL (rounded) f | $100,000 | ||||||||||||||
a We have assumed that there are approximately 55 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||||||
c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | |||||||||||||||
d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | |||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing | ||||||||||||||
Year 3, Boilers | ||||||||||||||
Table 22: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | ||||||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
No. of Responses | |||||
1. APPLICATIONS | NA | Labor Rates: | 0 | |||||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group | 0 | |||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | 0 | |||
4. REPORT REQUIREMENTS | Clerical | $62.51 | 0 | |||||||||||
A. Familiarize with regulatory requirement | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0.00 | 0 | |||||
B. Required Activities | Number of Boilers | 0 | ||||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | 0 | |||||||||||
Initial NOx Performance Test (boiler) | 24 | 2 | 48 | 5.5 | 264 | 13.2 | 26.4 | $36,450.88 | Reconstructed/modified | 5.5 | 11 | |||
Repeat NOx Performance Test | 24 | 2 | 48 | 0.275 | 13 | 0.66 | 1.32 | $1,822.54 | Existing | 55 | 0.55 | |||
Existing Sources - Initial Testing d | Assumed Units with Existing CEMS | 5.5 | 0 | |||||||||||
Initial NOx Performance Test (boiler) | 24 | 2 | 48 | 55 | 2,640 | 132 | 264 | $364,508.76 | Assumed Units without Existing CEMS | 49.5 | 110 | |||
Repeat NOx Performance Test | 24 | 2 | 48 | 2.75 | 132 | 6.6 | 13.2 | $18,225.44 | 5.5 | |||||
New and Existing Sources - Monitoring e | 0 | |||||||||||||
Daily Calibration Drift Tests - NOx CEMS | 0.3 | 330 | 99 | 55 | 5,445 | 272.25 | 544.5 | $751,799.32 | 18150 | |||||
C. Create Information (Included in 4B) | 0 | |||||||||||||
D. Gather Existing Information (Included in 4E) | 0 | |||||||||||||
E. Write Report | 0 | |||||||||||||
New, Reconstructed, Modified Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 5.5 | 11 | 0.55 | 1.1 | $1,518.79 | 5.5 | |||||
Notification of Initial Performance Test | 2 | 1 | 2 | 5.5 | 11 | 0.55 | 1.1 | $1,518.79 | 5.5 | |||||
Report of Performance Tests submitted via CEDRI or analogous electronic reporting | 2 | 1 | 2 | 4.95 | 9.9 | 0.495 | 0.99 | $1,366.91 | 4.95 | |||||
Submit Written Request to Administrator documenting Initial Performance Test and an Alternative Monitoring Plan (Alternative to CEMS).f | 10 | 1 | 10 | 0.55 | 5.5 | 0.275 | 0.55 | $759.39 | 0.55 | |||||
Submit Quarterly Electronic Reports to of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 24 | 4 | 48 | 4 | 192 | 9.6 | 19.2 | $26,510 | 16 | |||||
Existing Sources | 0 | |||||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 55 | 110 | 5.5 | 11 | $15,187.87 | 55 | |||||
Notification of Initial Performance Test | 2 | 1 | 2 | 55 | 110 | 5.5 | 11 | $15,187.87 | 55 | |||||
Report of Initial Performance Test Results submitted via CEDRI or analogous electronic reporting | 2 | 1 | 2 | 49.5 | 99 | 4.95 | 9.9 | $13,669.08 | 49.5 | |||||
Submit Written Request to Administrator documenting Initial Performance Test and an Alternative Monitoring Plan (Alternative to CEMS).f | 10 | 1 | 10 | 5.5 | 55 | 2.75 | 5.5 | $7,593.93 | 5.5 | |||||
Submit Quarterly Electronic Reports via CEDRI or analogous electronic reporting to EPA of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 2 | 4 | 8 | 55 | 440 | 22 | 44 | $60,751.46 | 220 | |||||
Subtotal for Reporting Requirements | 10,968 | $1,316,871 | 0 | |||||||||||
5. RECORDKEEPING REQUIREMENTS | 0 | |||||||||||||
A. Familiarize with regulatory requirement | 0 | |||||||||||||
B. Plan Activities | 0 | |||||||||||||
C. Implement Activities | 0 | |||||||||||||
D. Record Data | NA | 0 | ||||||||||||
E. Time to Transmit or Disclose Information | 0 | |||||||||||||
Existing Sources | 0 | |||||||||||||
Data Collection | 0.1 | 330 | 33 | 55 | 1,815 | 90.75 | 181.5 | $250,599.77 | 18150 | |||||
Records of Monthly Fuel Use, Average Hourly NOx emission rates, 30-day average NOx emission rates, Excess Emissions data, Missed monitoring day data, "F" factor, and CEMS monitoring data. | 0.1 | 330 | 33 | 55 | 1,815 | 90.75 | 181.5 | $250,599.77 | 18150 | |||||
New Sources | 0 | |||||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
Records of Monthly Fuel Use, Average Hourly NOx emission rates, 30-day average NOx emission rates, Excess Emissions data, Missed monitoring day data, "F" factor, and CEMS monitoring data. | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | 0 | |||||
G. Time for Audits | NA | 0 | ||||||||||||
Subtotal for Recordkeeping Requirements | 4,175 | $501,200 | 54994.55 | |||||||||||
Total Labor Burden and Cost (rounded) f | 15,100 | $1,820,000 | 71 | hr/response | 36844.55 | Sum | ||||||||
Total Capital and O&M Cost (rounded) f | $10,170,000 | Sum without CEMS | ||||||||||||
Grand TOTAL (rounded) f | $12,000,000 | |||||||||||||
a We have assumed that there are approximately 55 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction. | ||||||||||||||
b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | ||||||||||||||
c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | ||||||||||||||
d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | ||||||||||||||
e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily. | ||||||||||||||
f 10 percent of respondents are assumed to submit a written request to Administrator for an alternative monitoring procedure (instead of use of CEMS). | ||||||||||||||
g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing | |||||||||||||||
Year 1, Boilers | |||||||||||||||
Table 23: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Responses | ||||||||
Initial performance tests c | 24 | 1 | 24 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Technical | $51.23 | 0 | ||||
Repeat performance test d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Clerical | $27.73 | 0 | ||||
Report Review | 0 | ||||||||||||||
Notification of performance test e | 0.5 | 1.1 | 0.55 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | 0 | ||||||
Review test results/CEMS Results e | 8 | 1 | 8 | 0 | 0.0 | 0.00 | 0.00 | $0.00 | 0 | ||||||
Review quarterly electronic summary reports of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 8 | 4 | 32 | 0 | 0 | 0.0 | 0.0 | $0.00 | 0 | ||||||
TOTAL (rounded) f | 0 | $0 | 0 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 55 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Modified, reconstructed, and existing facilities conduct initial testing. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing | |||||||||||||||
Year 1, Boilers | |||||||||||||||
Table 24: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Responses | ||||||||
Initial performance tests c | 24 | 1 | 24 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Technical | $51.23 | 0 | ||||
Repeat performance test d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Clerical | $27.73 | 0 | ||||
Report Review | 0 | ||||||||||||||
Notification of performance test e | 0.5 | 1.1 | 0.55 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | 0 | ||||||
Review test results/CEMS Results e | 8 | 1 | 8 | 0 | 0.0 | 0.00 | 0.00 | $0.00 | 0 | ||||||
Review quarterly electronic summary reports of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 8 | 4 | 32 | 0 | 0 | 0.0 | 0.0 | $0.00 | 0 | ||||||
TOTAL (rounded) f | 0 | $0 | 0 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 55 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Modified, reconstructed, and existing facilities conduct initial testing. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing | |||||||||||||||
Year 3, Boilers | |||||||||||||||
Table 25: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs | |||||||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | Labor Rates: | |||||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Management | $69.04 | These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. | No. of Responses | ||||||||
Initial performance tests c | 24 | 1 | 24 | 0 | 0.0 | 0.0 | 0.0 | $0.00 | Technical | $51.23 | 0 | ||||
Repeat performance test d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Clerical | $27.73 | 0 | ||||
Report Review | 0 | ||||||||||||||
Notification of performance test e | 0.5 | 1.1 | 0.55 | 55 | 30.3 | 1.5 | 3.0 | $1,738.01 | 60.5 | ||||||
Review test results/CEMS Results e | 8 | 1 | 8 | 55 | 440.0 | 22.00 | 44.00 | $25,280.20 | 55 | ||||||
Review quarterly electronic summary reports of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. | 8 | 4 | 32 | 0 | 0 | 0.0 | 0.0 | $0.00 | 0 | ||||||
TOTAL (rounded) f | 540 | $27,000 | 115.5 | Sum | |||||||||||
Assumptions: | |||||||||||||||
a We have assumed that there are approximately 55 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified. | |||||||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay. | |||||||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | |||||||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||||||
e Modified, reconstructed, and existing facilities conduct initial testing. | |||||||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; and Pulp, Paper, and Paperboard Manufacturing | ||||||||
Source: Boilers | ||||||||
Table 26: Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Year | Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) | |
Year 1 | NOx Continuous Emission Monitors | $0 | 0 | $0 | $0 | $0 | ||
Year 1 | Initial CEMS testing | $0 | 0 | $0 | ||||
Year 2 | NOx Continuous Emission Monitors | $0 | 0 | $0 | $0 | |||
Year 2 | Initial CEMS testing | $0 | 0 | $0 | ||||
Year 3 | NOx Continuous Emission Monitorsa | $153,700 | 0 | $0 | 49.5 | $0 | ||
Year 3 | (a) initialb | $131,222 | $127,002 | 49.5 | $6,286,599 | |||
Year 3 | (b) annualc | $68,532 | 49.5 | $3,392,334 | ||||
Year 3 | Initial O2 or CO2 Monitorsa | |||||||
Year 3 | (a) initial | $8,523 | 49.5 | $421,889 | ||||
Year 3 | (b) annual | $1,436 | 49.5 | $71,082 | ||||
TOTAL | $0 | $10,170,000 | ||||||
Total Capital and O&M | $10,170,000 | |||||||
a10 percent of 55 Respondents are assumed to have existing NOx CEMS and existing O2 or CO2 monitors installed. | ||||||||
b Initial annual capital and O&M cost ($116,459) from Portland Cement ICR (2019) and adjusted to 2023 cost. | ||||||||
c Annual capital and O&M cost ($53,600) from Boiler 5D MACT ICR (2010 ) and adjusted to 2023 cost. |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |