Burden Tables

Copy of Non-EGU Burden-Supporting Calculations.xlsx

Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone National Ambient Air Quality Standard: Transport Obligations for non-Electric Generating Units

Burden Tables

OMB: 2060-0744

Document [xlsx]
Download: xlsx | pdf

Overview

ICR Summary
NoSourcesPerIndustry
RespondentBurdenSUMbySector
AgencyBurdenSUMbySector
RI-Y1
RI-Y2
RI-Y3
RA-Y1
RA-Y2
RA-Y3
RCOM
CI
CA
II-Y1
II-Y2
II-Y3
IA-Y1
IA-Y2
IA-Y3
ICOM
SI
SA
SS
BPPI-Y1
BPPI-Y2
BPPI-Y3
BPPA-Y1
BPPA-Y2
BPPA-Y3
BPPCOM


Sheet 1: ICR Summary

Note: the totals, as shown, update automatically










Annual Respondent Hours: 52,641
Industry Sector Number of Facilities Number of Sources
Annual Agency Hours: 6,237
Pipeline and Transportation of Natural Gas Idustry Sector: 138 307
Annual Respondent Labor Cost (Present Worth): $5,983,333
Cement and Concrete Product Manufacturing Industry Sector: 38 47
Annual Agency Labor Cost (Present Worth): $293,333
Iron and Steel Mills and Ferroalloy Manufacturing Industry Sector: 10 39
Annual Respondent Non-Labor Cost ($) $6,017,000
Glass and Glass Product Manufacturing Industry Sector: 34 44
Annual Agency Non-Labor Cost ($) $0
Basic Chemical Manufacturing Industry Sector: 6 17
Total Respondent Cost (Present Worth) $34,350,000
Petroleum and Coal Products Manufacturing Industry Sector: 6 10
Total Annual Respondent Cost (Present Worth) $11,450,000
Pulp, Paper, and Paperboard Mills Industry Sector: 19 25
No. of Industry Respondents: 489



No. of Agency Respondents (States): 21









Annual Hours/Industry Respondent: 108



Annual Cost/Industry Respondent:




Annual Hours/Agency Respondent: 297



Annual Cost/Agency Respondent:




Annual Industry Respondent Recordkeeping Hours: 10,775



Annual Industry Respondent Reporting Hours: 33,707









Total No. of Industry Responses 236,446



Annual No. of Industry Responses 78,815




Sheet 2: NoSourcesPerIndustry

Industry Emissions Source Group Number of Units
Cement and Concrete Product Manufacturing Boilers - < 10 Million BTU/hr; Industrial Processes - Kiln 1

Industrial Processes - Kiln 24

Industrial Processes - Preheater Kiln 3

Industrial Processes - Preheater/Precalciner Kiln 19
Glass and Glass Product Manufacturing Industrial Processes - Container Glass: Melting Furnace 27

Industrial Processes - Flat Glass: Melting Furnace 13

Industrial Processes - Furnace: General 1

Industrial Processes - Pressed and Blown Glass: Melting Furnace 3
Iron and Steel Mills and Ferroalloy Manufacturing Boilers - > 100 Million BTU/hr 3

Boilers - > 100 Million BTU/hr 6

Boilers - > 100 Million BTU/hr 2

Boilers - > 100 Million BTU/hr; Boilers - Blast Furnace Gas 1

Boilers - > 100 Million BTU/hr; Boilers - Coke Oven Gas 6

Boilers - > 100 Million BTU/hr; Boilers - Coke Oven Gas 1

Boilers - Blast Furnace Gas 1

Boilers - Blast Furnace Gas; Industrial Processes - Sintering: Windbox; Industrial Processes - Blast Furnace: Casting/Tapping: Local Evacuation; Industrial Processes - Process Gas: Process Heaters 1

Boilers - Coke Oven Gas 3

Boilers - Coke Oven Gas; Boilers - > 100 Million BTU/hr 1

Industrial Processes - Basic Oxygen Furnace (BOF): Open Hood Stack 2

Industrial Processes - Basic Oxygen Furnace (BOF): Open Hood Stack; Industrial Processes - General 1

Industrial Processes - Basic Oxygen Furnace (BOF): Top Blown Furnace: Primary 1

Industrial Processes - Blast Furnace: Casting/Tapping: Local Evacuation 1

Industrial Processes - General 5

Industrial Processes - General; Industrial Processes - Coke Oven or Blast Furnace 1

Industrial Processes - Other Not Classified 2

Industrial Processes - Sintering: Windbox 1
Pipeline Transportation of Natural Gas Internal Combustion Engines - 2-cycle Clean Burn 1

Internal Combustion Engines - 2-cycle Lean Burn 136

Internal Combustion Engines - 4-cycle Lean Burn 41

Internal Combustion Engines - 4-cycle Rich Burn 2

Internal Combustion Engines - Reciprocating 94

Internal Combustion Engines - Reciprocating 12

Internal Combustion Engines - Reciprocating 1

Internal Combustion Engines - Turbine 17

Internal Combustion Engines - Turbine 3
Basic Chemical Manufacturing Boilers - > 100 Million BTU/hr 6

Boilers - > 100 Million BTU/hr 2

Boilers - 10-100 Million BTU/hr 1

Boilers - 10-100 Million BTU/hr 1

Boilers - Cogeneration 1

Boilers - Distillate Oil - Grades 1 and 2: Boiler 1

Boilers - Petroleum Refinery Gas 2

Boilers - Petroleum Refinery Gas 2

Boilers - Subbituminous Coal: Traveling Grate (Overfeed) Stoker 1
Petroleum and Coal Products Manufacturing Boilers - > 100 Million BTU/hr 1

Boilers - > 100 Million BTU/hr; Boilers - Blast Furnace Gas 1

Boilers - Boiler, >= 100 Million BTU/hr 1

Boilers - Coke Oven Gas 1

Boilers - Petroleum Refinery Gas 3

Boilers - Petroleum Refinery Gas 3
Pulp, Paper, and Paperboard Mills Boilers - > 100 Million BTU/hr 5

Boilers - > 100 Million BTU/hr 3

Boilers - > 100 Million BTU/hr 1

Boilers - 10-100 Million BTU/hr 2

Boilers - Bituminous Coal: Cyclone Furnace 2

Boilers - Bituminous Coal: Pulverized Coal: Dry Bottom 1

Boilers - Bituminous Coal: Pulverized Coal: Dry Bottom; Boilers - > 100 Million BTU/hr 1

Boilers - Bituminous Coal: Spreader Stoker 3

Boilers - Cogeneration 2

Boilers - Fluid Catalytic Cracking Unit with CO Boiler: Natural Gas 2

Boilers - Subbituminous Coal: Boiler, Spreader Stoker 2

Boilers - Subbituminous Coal: Spreader Stoker 1

Sheet 3: RespondentBurdenSUMbySector

Summary of Annual Respondent Burden and Cost by Industry Sector – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone National Ambient Air Quality Standard: Transport Obligations for non-Electric Generating Units







Industry Sector &
Year
Technical Hours Managerial Hours Clerical Hours Total Labor Hours Labor Costs Present Worth Labor Costs Non-Labor (Annualized Capital/Startup Cost + Annual O&M Cost) Costs Total Costs Present Worth Total Costs






Pipeline Transportation of Natural Gas









Discount rate at 3.25% from Larry Sorrells in June 2020




Year 1 29,376 1,469 2,938 33,782 $4,055,933 $4,055,933 $0 $4,055,933 $4,055,933
Present value costs
2nd year rate 1.066056 3rd year rate 1.100703078125
Year 2 22,234 1,112 2,223 25,570 $3,069,947 $2,879,724 $204,428 $3,274,375 $3,071,485






Year 3 20,328 1,016 2,033 23,378 $2,806,776 $2,549,985 $0 $2,806,776 $2,549,985






Cement and Concrete Product Manufacturing















Year 1 5,740 287 574 6,601 $792,481 $792,481 $0 $792,481 $792,481






Year 2 5,693 285 569 6,547 $785,991 $737,289 $0 $785,991 $737,289






Year 3 5,693 285 569 6,547 $785,991 $714,081 $0 $785,991 $714,081






Iron and Steel Mills and Ferroalloy Manufacturing















Year 1 3,432 172 343 3,947 $473,861 $473,861 $0 $473,861 $473,861






Year 2 2,574 129 257 2,960 $355,396 $333,375 $0 $355,396 $333,375






Year 3 10,914 546 1,091 12,551 $1,506,879 $1,369,015 $7,625,826 $9,132,705 $8,297,156






Glass and Glass Product Manufacturing















Year 1 5,366 268 537 6,171 $740,859 $740,859 $0 $740,859 $740,859






Year 2 5,326 266 533 6,125 $735,336 $689,772 $0 $735,336 $689,772






Year 3 5,326 266 533 6,125 $735,336 $668,060 $43,648 $778,984 $707,715






Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Mills















Year 1 1,628 81 163 1,872 $224,780 $224,780 $0 $224,780 $224,780






Year 2 528 26 53 607 $72,902 $68,385 $0 $72,902 $68,385






Year 3 13167.6 658.38 1316.76 15142.74 $1,818,070 $1,651,735 $10,171,904 $11,989,974 $10,893,014






Total 137,324 6,866 13,732 157,923 $18,961,000 $17,950,000 $18,050,000 $37,010,000 $34,350,000






Average 45,775 2,289 4,577 52,641 $6,320,000 $5,983,000 $6,017,000 $12,337,000 $11,450,000























Total No. of Industry Responses 236446














Annual No. of Industry Responses 78815















Sheet 4: AgencyBurdenSUMbySector

Summary of Annual Agency Burden and Cost by Industry Sector - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone National Ambient Air Quality Standard: Transport Obligations for non-Electric Generating Units







Industry Sector &
Year
Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Present Worth Labor Costs Non-Labor Costs Total Costs Present Worth Total Costs






Pipeline Transportation of Natural Gas









Discount rate at 3.25% from Larry Sorrells in June 2020




Year 1 2,208 110 221 2,539 $126,900 $126,900 $0 $126,900 $126,900
Present value costs
2nd year rate 1.066056 3rd year rate 1.100703078125
Year 2 3,553 178 355 4,086 $204,100 $191,453 $0 $204,100 $191,453






Year 3 3,553 178 355 4,086 $204,100 $185,427 $0 $204,100 $185,427






Cement and Concrete Product Manufacturing















Year 1 891 45 89 1,024 $51,172 $51,172 $0 $51,172 $51,172






Year 2 891 45 89 1,024 $51,172 $48,001 $0 $51,172 $48,001






Year 3 891 45 89 1,024 $51,172 $46,491 $0 $51,172 $46,491






Iron and Steel Mills and Ferroalloy Manufacturing















Year 1 645 32 65 742 $37,084 $37,084 $0 $37,084 $37,084






Year 2 333 17 33 383 $19,158 $17,971 $0 $19,158 $17,971






Year 3 333 17 33 383 $19,158 $17,406 $0 $19,158 $17,406






Glass and Glass Product Manufacturing















Year 1 834 42 83 959 $47,906 $47,906 $0 $47,906 $47,906






Year 2 834 42 83 959 $47,906 $44,938 $0 $47,906 $44,938






Year 3 834 42 83 959 $47,906 $43,523 $0 $47,906 $43,523






Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Mills















Year 1 0 0 0 0 $0 $0 $0 $0 $0






Year 2 0 0 0 0 $0 $0 $0 $0 $0






Year 3 470 24 47 541 $27,018 $24,546 $0 $27,018 $24,546






Total 16,269 813 1,627 18,710 $934,750 $880,000 $0 $934,750 $880,000






Average 5,423 271 542 6,237 $62,320 $293,000 $0 $62,320 $293,000







Sheet 5: RI-Y1

Pipeline Transportation of Natural Gas














Year 1, Reciprocating Internal Combustion Engines (RICE)














Table 1: Year 1, Respondent Burden and Cost – Pipeline Transportation of Natural Gas, RICE























Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb





No. of Responses
1. APPLICATIONS NA







Labor Rates:



2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group


3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 24 1 24 2.58 61.89 3.09 6.19 $8,545
Technical $123.94

2.5788
4. REPORT REQUIREMENTS








Clerical $62.51

0
A. Familiarize with regulatory requirement 20 1 20 307 6140 307 614 $847,759.01




307
B. Required Activities









Number of RICE

0
New, Reconstructed, Modified Sources - Annual CPMS Performance Evaluation c








New 2.5788 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Annual CPMS Performance Evaluation 8 1 8 0 0 0 0 $0.00
Reconstructed/modified 33.2788

0
Repeat Annual CPMS Performance Evaluation 8 1 8 0 0 0 0 $0.00
Existing 307

0
Existing Sources - Annual CPMS Performance Evaluation and Performance Testing d








Assumed New RICE with SCR or NSCR 1.3272 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Annual CPMS Performance Evaluation 8 1 8 0 0 0 0 $0.00
Assumed New RICE with no SCR or NSCR 1.2516 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Repeat Annual CPMS Performance Evaluation 8 1 8 0 0 0 0 $0.00
Assumed Existing RICE with SCR or NSCR 158

0
Non EPA-Certified Engine Performance Testing 24 2 48 230.25 11,052 552.6 1105.2 $1,525,966.22
Assumed Existing RICE with no SCR or NSCR 149

460.5
Repeat Non EPA-Certified Engine Performance Testing 24 2 48 11.5125 553 27.63 55.26 $76,298.31
Assumed Existing EPA-Certified RICE 76.75 Assumed 25% of Existing Population per ECHO database.
23.025
New and Existing Sources - Monitoring e








Assumed Existing Non EPA-Certified RICE 230.25 Assumed 25% of Existing Population per ECHO database.
0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00




0
C. Create Information (Included in 4B)












0
D. Gather Existing Information (Included in 4E)












0
E. Write Report












0
New, Reconstructed, Modified Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Performance Test 2 1 2 0 0 0 0 $0.00




0
Semi-Annual Report Submitted to Administrator of Compliance Statement, SubSection 52.41(d) performance test 8 2 16 2.58 41.26 2.06 4.13 $5,697




5.1576
Existing Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Non EPA-Certified Engine Performance Test 2 2 2 241.76 483.53 24.18 48.35 $66,761.02




483.525
Report of Non EPA-Certified Engine Performance Test Results via CEDRI or analogous electronic reporting 2 2 2 241.76 483.53 24.18 48.35 $66,761.02




483.525
Semi-Annual Report submitted via CEDRI or analogous electronic reporting 8 2 16 307 4912 245.6 491.2 $678,207




614
Subtotal for Reporting Requirements



27,286

$3,275,995




0
5. RECORDKEEPING REQUIREMENTS












0
A. Familiarize with regulatory requirement












0
B. Plan Activities












0
C. Implement Activities












0
D. Record Data NA











0
E. Time to Transmit or Disclose Information












0
Existing Sources












0
Data Collection 0.1 12 1.2 307 368 18.42 36.84 $50,865.54




3684
Create and Store Engine Maintenance Plan 0.4 1 0.4 307 123 6.14 12.28 $16,955.18




307
Records of Hours of Operation 0.1 4 0.4 307 123 6.14 12.28 $16,955.18




1228
Records of Engine Maintenance Conducted 0.1 4 0.4 307 123 6.14 12.28 $16,955.18




1228
Engines Anticipated with SCR or NSCR












0
Daily monitoring of catalyst inlet temperature 0.005 365 1.825 0 0 0 0 $0.00




0
Monthly monitoring of pressure drop across catalyst 0.1 12 1.2 0 0 0 0 $0.00




0
Engines Anticipated with no SCR or NSCR












0
Prepare CPMS site-specific monitoring plan to address monitoring system design, data collection, and QA/QC. 16 1 16 0 0 0 0 $0.00




0
Records of Annual CPMS Performance Evaluation 1 1 1 0 0 0 0 $0.00




0
Collect and record the CPMS monitoring parameters. 0.5 1 0.5 0 0 0 0 $0.00




0
New Sources












0
Data Collection 0 0 0 2.5788 0 0 0 $0




0
Create and Store Maintenance Plan 0 0 0 2.5788 0 0 0 $0




0
F. Time to Train Personnel of 1st year Existing Sources 16 1 16 307 4,912 245.6 491.2 $678,207




307
G. Time for Audits NA











9133.3114 SUM
Subtotal for Recordkeeping Requirements



6,496

$779,938






Total Labor Burden and Cost (rounded) f



33,800 $4,060,000
159 hr/response



Total Capital and O&M Cost (rounded) f






$0






Grand TOTAL (rounded) f






$4,100,000






















a We have assumed that there are approximately 307 respondents operating RICE and that 10% of the existing facilities will have new construction/reconstruction.






b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.






c New RICE CPMS performance evaluation conducted annually. We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure.






d We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure.






e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 6: RI-Y2

Pipeline Transportation of Natural Gas














Year 2, Reciprocating Internal Combustion Engines (RICE)














Table 2: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs























Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb





Number of Responses
1. APPLICATIONS NA







Labor Rates:

0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group
0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 24 1 24 2.58 61.89 3.09 6.19 $8,545
Technical $123.94

2.5788
4. REPORT REQUIREMENTS








Clerical $62.51

0
A. Familiarize with regulatory requirement 20 1 20 0 0 0 0 $0.00




0
B. Required Activities









Number of RICE

0
New, Reconstructed, Modified Sources - Annual CPMS Performance Evaluation c








New 2.5788 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Annual CPMS Performance Evaluation 8 1 8 1.25 10 0.50 1.00 $1,382.48
Reconstructed/modified 33.2788

1.2516
Repeat Annual CPMS Performance Evaluation 8 1 8 0.06 1 0.03 0.05 $69.12
Existing 307

0.06258
Existing Sources - Annual CPMS Performance Evaluation d








Assumed New RICE with SCR or NSCR 1.3272 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Annual CPMS Performance Evaluation 8 1 8 149 1,192 59.6 119.2 $164,581.23
Assumed New RICE with no SCR or NSCR 1.2516 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
149
Repeat Annual CPMS Performance Evaluation 8 1 8 7.45 60 2.98 5.96 $8,229.06
Assumed Existing RICE with SCR or NSCR 158

7.45
Non EPA-Certified Engine Performance Testing 24 2 48 230.25 11,052 552.6 1105.2 $1,525,966.22
Assumed Existing RICE with no SCR or NSCR 149

460.5
Repeat Non EPA-Certified Engine Performance Testing 24 2 48 11.51 553 27.63 55.26 $76,298.31
Assumed Existing EPA-Certified RICE 76.75 Assumed 25% of Existing Population per ECHO database.
23.025
New and Existing Sources - Monitoring e








Assumed Existing Non EPA-Certified RICE 230.25 Assumed 25% of Existing Population per ECHO database.
0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00




0
C. Create Information (Included in 4B)












0
D. Gather Existing Information (Included in 4E)












0
E. Write Report












0
New, Reconstructed, Modified Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Performance Test 2 1 2 0 0 0 0 $0.00




0
Semi-Annual Report Submitted to Administrator of Compliance Statement, SubSection 52.41(d) performance test 8 2 16 2.58 41.26 2.06 4.13 $5,697




5.1576
Existing Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Non EPA-Certified Engine Performance Test 2 2 2 241.76 483.53 24.18 48.35 $66,761.02




483.525
Report of Non EPA-Certified Engine Performance Test Results via CEDRI or analogous electronic reporting 2 2 2 241.76 483.53 24.18 48.35 $66,761.02




483.525
Semi-Annual Report submitted via CEDRI or analogous electronic reporting 8 2 16 307 4912 245.6 491.2 $678,207




614
Subtotal for Reporting Requirements



21,676

$2,602,498




0
5. RECORDKEEPING REQUIREMENTS












0
A. Familiarize with regulatory requirement












0
B. Plan Activities












0
C. Implement Activities












0
D. Record Data NA











0
E. Time to Transmit or Disclose Information












0
Existing Sources












0
Data Collection 0.1 12 1.2 307 368 18.42 36.84 $50,865.54




3684
Create and Store Engine Maintenance Plan 0.4 1 0.4 307 123 6.14 12.28 $16,955.18




307
Records of Hours of Operation 0.1 4 0.4 307 123 6.14 12.28 $16,955.18




1228
Records of Engine Maintenance Conducted 0.1 4 0.4 307 123 6.14 12.28 $16,955.18




1228
Engines Anticipated with SCR or NSCR












0
Daily monitoring of catalyst inlet temperature 0.005 365 1.825 0 0 0 0 $0.00




0
Monthly monitoring of pressure drop across catalyst 0.1 12 1.2 0 0 0 0 $0.00




0
Engines Anticipated with no SCR or NSCR












0
Prepare CPMS site-specific monitoring plan to address monitoring system design, data collection, and QA/QC. 16 1 16 149 2,384 119.2 238.4 $329,162.46




149
Records of Annual CPMS Performance Evaluation 1 1 1 149 149 7.45 14.9 $20,572.65




149
Collect and record the CPMS monitoring parameters 0.5 1 0.5 149 75 3.725 7.45 $10,286.33




149
New Sources












0
Data Collection 0 0 0 2.58 0 0 0 $0




0
Create and Store Maintenance Plan 0 0 0 2.58 0 0 0 $0




0
F. Time to Train Personnel of New Sources 16 1 16 2.58 41 2.063 4.126 $5,697




2.5788
G. Time for Audits NA











9126.65438 SUM
Subtotal for Recordkeeping Requirements



3,893

$467,449






Total Labor Burden and Cost (rounded) f



25,600 $3,070,000
121 hr/response



Total Capital and O&M Cost (rounded) f






$0






Grand TOTAL (rounded) f






$3,100,000






















a We have assumed that there are approximately 307 respondents operating RICE and that 10% of the existing facilities will have new construction/reconstruction.






b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.






c New RICE CPMS performance evaluation conducted annually. We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure.






d We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure.






e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 7: RI-Y3

Pipeline Transportation of Natural Gas














Year 3, Reciprocating Internal Combustion Engines (RICE)














Table 3: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs























Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb





No. of Responses
1. APPLICATIONS NA







Labor Rates:

0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group
0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 24 1 24 2.58 61.89 3.09 6.19 $8,545
Technical $123.94

2.5788
4. REPORT REQUIREMENTS








Clerical $62.51

0
A. Familiarize with regulatory requirement 20 1 20 0 0 0 0 $0.00




0
B. Required Activities









Number of RICE

0
New, Reconstructed, Modified Sources - Annual CPMS Performance Evaluation c








New 2.5788 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Annual CPMS Performance Evaluation 8 1 8 1.25 10 0.50 1.00 $1,382.48
Reconstructed/modified 33.2788

1.2516
Repeat Annual CPMS Performance Evaluation 8 1 8 0.06 1 0.03 0.05 $69.12
Existing 307

0.06258
Existing Sources - Annual CPMS Performance Evaluation d








Assumed New RICE with SCR or NSCR 1.3272 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
0
Annual CPMS Performance Evaluation 8 1 8 149 1,192 59.6 119.2 $164,581.23
Assumed New RICE with no SCR or NSCR 1.2516 Note: New is assumed to be .84% of existing, per RICE MACT ICR data.
149
Repeat Annual CPMS Performance Evaluation 8 1 8 7.45 60 2.98 5.96 $8,229.06
Assumed Existing RICE with SCR or NSCR 158

7.45
Non EPA-Certified Engine Performance Testing 24 2 48 230.25 11,052 552.6 1105.2 $1,525,966.22
Assumed Existing RICE with no SCR or NSCR 149

460.5
Repeat Non EPA-Certified Engine Performance Testing 24 2 48 11.51 553 27.63 55.26 $76,298.31
Assumed Existing EPA-Certified RICE 76.75 Assumed 25% of Existing Population per ECHO database.
23.025
New and Existing Sources - Monitoring e








Assumed Existing Non EPA-Certified RICE 230.25 Assumed 25% of Existing Population per ECHO database.
0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00




0
C. Create Information (Included in 4B)












0
D. Gather Existing Information (Included in 4E)












0
E. Write Report












0
New, Reconstructed, Modified Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Performance Test 2 1 2 0 0 0 0 $0.00




0
Semi-Annual Report Submitted to Administrator of Compliance Statement, SubSection 52.41(d) performance test 8 2 16 2.58 41.26 2.06 4.13 $5,697




5.1576
Existing Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Non EPA-Certified Engine Performance Test 2 2 2 241.76 483.53 24.18 48.35 $66,761.02




483.525
Report of Non EPA-Certified Engine Performance Test Results via CEDRI or analogous electronic reporting 2 2 2 241.8 483.53 24.18 48.35 $66,761.02




483.525
Semi-Annual Report submitted via CEDRI or analogous electronic reporting 8 2 16 307 4912 245.6 491.2 $678,207




614
Subtotal for Reporting Requirements



21,676

$2,602,498




0
5. RECORDKEEPING REQUIREMENTS












0
A. Familiarize with regulatory requirement












0
B. Plan Activities












0
C. Implement Activities












0
D. Record Data NA











0
E. Time to Transmit or Disclose Information












0
Existing Sources












0
Data Collection 0.1 12 1.2 307 368 18.42 36.84 $50,865.54




3684
Create and Store Engine Maintenance Plan 0.4 1 0.4 307 123 6.14 12.28 $16,955.18




307
Records of Hours of Operation 0.1 4 0.4 307 123 6.14 12.28 $16,955.18




1228
Records of Engine Maintenance Conducted 0.1 4 0.4 307 123 6.14 12.28 $16,955.18




1228
Engines Anticipated with SCR or NSCR












0
Daily monitoring of catalyst inlet temperature 0.005 365 1.83 158 288 14.42 28.84 $39,812.92




57670
Monthly monitoring of pressure drop across catalyst 0.1 12 1.2 158 190 9.48 18.96 $26,178.36




1896
Engines Anticipated with no SCR or NSCR












0
Prepare CPMS site-specific monitoring plan to address monitoring system design, data collection, and QA/QC. 16 1 16 0 0 0 0 $0.00




0
Records of Annual CPMS Performance Evaluation 1 1 1 149 149 7.45 14.9 $20,572.65




149
Collect and record the CPMS monitoring parameters 0.5 1 0.5 149 75 3.725 7.45 $10,286.33




149
New Sources












0
Data Collection 0 0 0 2.58 0 0 0 $0




0
Create and Store Maintenance Plan 0 0 0 2.58 0 0 0 $0




0
F. Time to Train Personnel of New Sources 16 1 16 2.58 41 2.06 4.13 $5,697




2.5788
G. Time for Audits NA











68543.65438 SUM
Subtotal for Recordkeeping Requirements



1,701

$204,278






Total Labor Burden and Cost (rounded) f



23,400 $2,810,000
110 hr/response



Total Capital and O&M Cost (rounded) f






$0






Grand TOTAL (rounded) f






$2,800,000






















a We have assumed that there are approximately 307 respondents operating RICE and that 10% of the existing facilities will have new construction/reconstruction.






b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.






c New RICE CPMS performance evaluation conducted annually. We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure.






d We have assumed that 5 percent of respondents would repeat annual CPMS performance evaluation due to failure.






e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 8: RA-Y1

Pipeline Transportation of Natural Gas














Year 1, Reciprocating Internal Combustion Engines (RICE)














Table 4: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs















Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Responses
annual CPMS performance evaluations c 8 1 8 0 0.0 0.0 0.0 $0.00
Technical $51.23

0
Repeat annual CPMS performance evaluations d 8 1 8 0 0 0 0 $0
Clerical $27.73

0
Report Review












0
Notification of annual CPMS performance evaluations e 0.5 1.1 0.55 0 0.0 0.0 0.0 $0.00




0
Review of Semi-annual reports g 8 2 16 138 2208.0 110.40 220.80 $126,860.64




276
TOTAL (rounded) f
5.1

2,540 $126,900




276 Sum
















Assumptions:














a We have assumed that there are approximately 307 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Only facilities with no SCR or NSCR will conduct annual CPMS performance evaluations.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






g 138 facilities operate 307 existing RICE units.







Sheet 9: RA-Y2

Pipeline Transportation of Natural Gas














Year 2, Reciprocating Internal Combustion Engines (RICE)














Table 5: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs















Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Respones
annual CPMS performance evaluations c 8 1 8 150.2516 1202.0 60.1 120.2 $69,061.65
Technical $51.23

150.2516
Repeat annual CPMS performance evaluations d 8 1 8 7.51258 60 3 6 $3,453
Clerical $27.73

7.51258
Report Review












0
Notification of annual CPMS performance evaluations e 0.5 1.1 0.55 150.2516 82.6 4.1 8.3 $4,747.99




165.27676
Review of Semi-annual reports g 8 2 16 138 2208.0 110.40 220.80 $126,860.64




276
TOTAL (rounded) f



4,090

$204,100




599.04094 Sum
















Assumptions:














a We have assumed that there are approximately 307 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Only facilities with no SCR or NSCR will conduct annual CPMS performance evaluations.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






g 138 facilities operate 307 existing RICE units.







Sheet 10: RA-Y3

Pipeline Transportation of Natural Gas














Year 3, Reciprocating Internal Combustion Engines (RICE)














Table 6: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs















Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Responses
annual CPMS performance evaluations c 8 1 8 150.2516 1202.0 60.1 120.2 $69,061.65
Technical $51.23

150.2516
Repeat annual CPMS performance evaluations d 8 1 8 7.51258 60 3 6 $3,453
Clerical $27.73

7.51258
Report Review












0
Notification of annual CPMS performance evaluations e 0.5 1.1 0.55 150.2516 82.6 4.1 8.3 $4,747.99




165.27676
Review of Semi-annual reports g 8 2 16 138 2208.0 110.40 220.80 $126,860.64




276
TOTAL (rounded) f



4,090

$204,100




599.04094 Sum
















Assumptions:














a We have assumed that there are approximately 307 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Only facilities with no SCR or NSCR will conduct annual CPMS performance evaluations.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






g 138 facilities operate 307 existing RICE units.







Sheet 11: RCOM

Pipeline Transportation of Natural Gas
Source: RICE






Table 7: Capital/Startup vs. Operation and Maintenance (O&M) Costs









(A) (B) (C) (D) (E) (F) (G)
Year Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M, (E X F)
Year 1
$0 0 $0 $0
$0
Year 2 Install CPMS
0 $0 $0 149 $0
Year 2 (a) initiala


$724 149 $107,876
Year 2 (b) annualb


$648 149 $96,552
Year 3 CPMS




$0
Year 3 (a) initial $0



$0
Year 3 (b) annual $0



$0

TOTAL

$0

$200,000














Total Capital and O&M








a Initial Annual Capital purchase and O&M Cost of $568 (year 2010) was obtained from EC/R, Inc. Memo dated August 8, 2010 and adjusted to a 2023 cost of $724.






b Annual CPMS cost is assumed to be 70% of initial CPMS cost; Annual Capital purchase and O&M Cost of $507 (year 2010) adjusted to a 2023 cost of $724.







Sheet 12: CI

Cement and Concrete Manufacturing





Source: Kilns













Table 15: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs
Other EDITS: change PM to NOx


















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb




No. of Responses
1. APPLICATIONS NA







Labor Rates:
0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group 0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94
0
4. REPORT REQUIREMENTS








Clerical $62.51
0
A. Familiarize with regulatory requirement 1 1 1 47 47 2.35 4.7 $6,489.36



47
B. Required Activities









Number of kilns
0
New, Reconstructed, Modified Sources - Testing c








New 0
0
Initial NOx Performance Test (kiln) 24 2 48 4.7 226 11.28 22.56 $31,148.93
Reconstructed/modified 4.7
9.4
Repeat NOx Performance Test 24 2 48 0.235 11 0.564 1.128 $1,557.45
Existing 47
0.47
Existing Sources - Annual Testing d











0
Semi-annual NOx Performance Test (kiln) 24 2 48 47 2,256 112.8 225.6 $311,489.30



94
Repeat NOx Performance Test 24 2 48 2.35 113 5.64 11.28 $15,574.47



4.7
New, Reconstructed, Modified Sources











0
Notification of Initial Performance Test 2 1 2 4.7 9.4 0.47 0.94 $1,297.87



4.7
Report of Performance Test Results via CEDRI or analogous electronic reporting 2 2 4 4.7 18.8 0.94 1.88 $2,595.74



9.4
Semi-Annual Report submitted via CEDRI or analogous electronic reporting 8 2 16 0.235 3.76 0.188 0.376 $519.15



0.47
Existing Sources











0
Notification of Semi-annual Performance Test 2 2 4 47 188 9.4 18.8 $25,957.44



94
Report of Semi-Annual Performance Test Results via CEDRI or analogous electronic reporting 2 2 4 47 188 9.4 18.8 $25,957.44



94
Semi-Annual Report submitted via CEDRI or analogous electronic reporting 8 2 16 47 752 37.6 75.2 $103,829.77



94
Subtotal for Reporting Requirements



4,385

$422,587



0
5. RECORDKEEPING REQUIREMENTS











0
A. Familiarize with regulatory requirement











0
B. Plan Activities











0
C. Implement Activities











0
D. Record Data NA










0
E. Time to Transmit or Disclose Information











0
Existing Sources











0
Data Collection 0.1 2 33 47 1,551 77.55 155.1 $214,148.90



94
Records of Performance Tests 0.1 2 24 47 1,128 56.4 112.8 $155,744.65



94
New Sources











0
Data Collection 1.5 2 3 0 0 0 0 $0



0
Records of Performance Tests 0.1 2 0.2 0 0 0 0 $0



0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0



640.14 Sum
G. Time for Audits NA







35 hr/response


Subtotal for Recordkeeping Requirements



3,081

$369,894





Total Labor Burden and Cost (rounded) e



7,500 $790,000





Total Capital and O&M Cost (rounded) e






$0





Grand TOTAL (rounded) e






$800,000




















a We have assumed that there are approximately 47 respondents operating kilns and that 10% of the existing facilities will have new construction/reconstruction.





b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.





c New kilns test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.





d The rule requires existing kilns re-test semi-annually for NOx.





e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 13: CA

Cement and Concrete Manufacturing






Source: Kilns














Table 16: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs














Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Responses
Initial performance tests c 24 1 24 4.7 112.8 5.6 11.3 $6,480.92
Technical $51.23

4.7
Repeat performance test d 24 1 24 0 0 0 0 $0
Clerical $27.73

0
Report Review












0
Notification of performance test e 0.5 1.1 0.55 47 25.9 1.3 2.6 $1,485.21




51.7
Review performance test results 8 2 16 47 752.0 37.60 75.20 $43,206.16




94
TOTAL (rounded) f



1,020

$51,200




150.4 Sum
















Assumptions:














a We have assumed that there are approximately 47 respondents with kilns and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Modified or reconstructed facilities conduct initial testing, and existing facilities (kilns) conduct semi-annual testing.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 14: II-Y1

Iron and Steel Mills and Ferroalloy Manufacturing





Year 1, Sources: Boilers, Furnaces, Coke Ovens, Windbox













Table 8: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs




















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb




Number of Respones
1. APPLICATIONS NA







Labor Rates:
0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group 0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94
0
4. REPORT REQUIREMENTS








Clerical $62.51
0
A. Familiarize with regulatory requirement 20 1 20 39 780 39 78 $107,695.77



39
B. Required Activities









Number of Boilers
0
New, Reconstructed, Modified Sources - Testing c








New 0
0
Initial Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00
Reconstructed/modified 3.9
0
Repeat Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00
Existing 39
0
Existing Sources - Initial Testing d











0
Initial Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00



0
Repeat Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00



0
New and Existing Sources - Monitoring e











0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00



0
Quarterly Accuracy Assessment











0
C. Create Information (Included in 4B)











0
D. Gather Existing Information (Included in 4E)











0
E. Write Report











0
New, Reconstructed, Modified Sources











0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00



0
Notification of Initial Performance Evaluation of NOx CEMS 2 1 2 0 0 0 0 $0.00



0
Report of Performance Evaluation of NOx CEMS 2 1 2 0 0 0 0 $0.00



0
Quarterly Electronic Reports to Administrator 24 4 48 0 0 0 0 $0



0
Existing Sources











0
Work Plan For Emission Units Not Identified in (d)(a)(i)(2) or (3) [refer to pg. 17 of Reg Text.doc]f 10 1 2 20 40 2 4 $5,522.86



20
Work Plan For Basic Oxygen Process Furnaces 10 1 2 4 8 0.4 0.8 $1,104.57



4
For Taconite Kilns with Existing low-NOx burners, Submit Demonstration Report 5 1 2 9 18 0.9 1.8 $2,485.29



9
For Taconite Kilns with no Existing low-NOx burners, Submit Work Plan 10 1 2 6 12 0.6 1.2 $1,656.86
Note: Assumed that 40% of Taconite Kilns have no existing low-NOx burners.

6
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00



0
Notification of Initial Performance Evaluation of NOx CEMS 2 1 2 0 0 0 0 $0.00



0
Report of Initial Performance Evaluation of NOx CEMS Test Results 2 1 2 0 0 0 0 $0.00



0
CEDRI electronic submittal of NOx CEMS Report and Excess Emissions Report 2 4 8 0 0 0 0 $0.00



0
Subtotal for Reporting Requirements



987

$118,465



0
5. RECORDKEEPING REQUIREMENTS











0
A. Familiarize with regulatory requirement











0
B. Plan Activities











0
C. Implement Activities











0
D. Record Data NA










0
E. Time to Transmit or Disclose Information











0
Existing Sources











0
Data Collection 0.1 330 33 39 1,287 64.35 128.7 $177,698.02



12870
Recordkeeping of NOx emission rate, operating days data, CEMS data 0.1 330 33 39 1,287 64.35 128.7 $177,698.02



12870
New Sources











0
Data Collection 1.5 330 495 0 0 0 0 $0



0
CEMS Recordkeeping 0.1 330 33 0 0 0 0 $0



0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0



0
G. Time for Audits NA










25818 Sum
Subtotal for Recordkeeping Requirements



2,960

$355,396
18 hr/response
12948 Sum without CEMS
Total Labor Burden and Cost (rounded) g



3,900 $470,000





Total Capital and O&M Cost (rounded) g






$0





Grand TOTAL (rounded) g






$500,000




















a We have assumed that there are approximately 26 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction.





b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.





c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.





d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure.





e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.





f Estimated number of taconite production kilns located in Minnesota and Michigan.





g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 15: II-Y2

Iron and Steel Mills and Ferroalloy Manufacturing





Year 2, Sources: Boilers, Furnaces, Coke Ovens, Windbox













Table 9: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs




















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb




No. of Responses
1. APPLICATIONS NA







Labor Rates:
0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group 0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94
0
4. REPORT REQUIREMENTS








Clerical $62.51
0
A. Familiarize with regulatory requirement 20 1 20 0 0 0 0 $0.00



0
B. Required Activities









Number of Boilers
0
New, Reconstructed, Modified Sources - Testing c








New 0
0
Initial Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00
Reconstructed/modified 3.9
0
Repeat Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00
Existing 39
0
Existing Sources - Initial Testing d











0
Initial Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00



0
Repeat Performance Evaluation of NOx CEMS 24 2 48 0 0 0 0 $0.00



0
New and Existing Sources - Monitoring e











0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00



0
Quarterly Accuracy Assessment











0
C. Create Information (Included in 4B)











0
D. Gather Existing Information (Included in 4E)











0
E. Write Report











0
New, Reconstructed, Modified Sources











0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00



0
Notification of Initial Performance Evaluation of NOx CEMS 2 1 2 0 0 0 0 $0.00



0
Report of Performance Evaluation of NOx CEMS 2 1 2 0 0 0 0 $0.00



0
Quarterly Electronic Reports to Administrator 24 4 48 0 0 0 0 $0



0
Existing Sources











0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00



0
Notification of Initial Performance Evaluation of NOx CEMS 2 1 2 0 0 0 0 $0.00



0
Report of Initial Performance Evaluation of NOx CEMS Test Results 2 1 2 0 0 0 0 $0.00



0
CEDRI electronic submittal of NOx CEMS Report and Excess Emissions Report 2 4 8 0 0 0 0 $0.00



0
Subtotal for Reporting Requirements



0

$0



0
5. RECORDKEEPING REQUIREMENTS











0
A. Familiarize with regulatory requirement











0
B. Plan Activities











0
C. Implement Activities











0
D. Record Data NA










0
E. Time to Transmit or Disclose Information











0
Existing Sources











0
Data Collection 0.1 330 33 39 1,287 64.35 128.7 $177,698.02



12870
Recordkeeping of NOx emission rate, operating days data, CEMS data 0.1 330 33 39 1,287 64.35 128.7 $177,698.02



12870
New Sources











0
Data Collection 1.5 330 495 0 0 0 0 $0



0
CEMS Recordkeeping 0.1 330 33 0 0 0 0 $0



0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0



0
G. Time for Audits NA










0
Subtotal for Recordkeeping Requirements



2,960

$355,396
14 hr/response
0
Total Labor Burden and Cost (rounded) f



3,000 $360,000



0
Total Capital and O&M Cost (rounded) f






$0



0
Grand TOTAL (rounded) f






$400,000



25740 SUM















a We have assumed that there are approximately 26 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction.





b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.





c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.





d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure.





e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.





f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 16: II-Y3

Iron and Steel Mills and Ferroalloy Manufacturing





Year 3, Sources: Boilers, Furnaces, Coke Ovens, Windbox













Table 10: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs




















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb




No. of Responses
1. APPLICATIONS NA







Labor Rates:
0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group 0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94
0
4. REPORT REQUIREMENTS








Clerical $62.51
0
A. Familiarize with regulatory requirement 20 1 20 0 0 0 0 $0.00



0
B. Required Activities









Number of Boilers
0
New, Reconstructed, Modified Sources - Testing c








New 0
0
Initial Performance Evaluation of NOx CEMS 24 2 48 3.9 187 9.36 18.72 $25,846.98
Reconstructed/modified 3.9
7.8
Repeat Performance Evaluation of NOx CEMS 24 2 48 0.20 9 0.47 0.94 $1,292.35
Existing 39
0.39
Existing Sources - Initial Testing d








Total no. of Taconite kilns 15
0
Initial Performance Evaluation of NOx CEMS 24 2 48 39 1,872 93.6 187.2 $258,469.85
Taconite kilns with existing low-NOx burners (at effective date of rule) 9
78
Repeat Performance Evaluation of NOx CEMS 24 2 48 1.95 94 4.68 9.36 $12,923.49
Taconite kilns with no existing low-NOx burners (at effective date of rule) 6 Note: Assumed that 40% of Taconite Kilns have no existing low-NOx burners. 3.9
Initial Performance Testing of Taconite Kilns with no existing low-NOx burners (within 5 years of effective date of rule) 24 1 24 6 144 7.2 14.4 $19,882.30



6
Repeat Performance Testing of Taconite Kilns with no existing low-NOx burners (within 5 years of effective date of rule) 24 1 24 0.3 7 0.36 0.72 $994.11



0.3
New and Existing Sources - Monitoring e











0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 39 3,861 193.05 386.1 $533,094.06



12870
Quarterly Accuracy Assessment 8 4 32 39 1,248 62.40 124.8 $172,313.23



156
C. Create Information (Included in 4B)











0
D. Gather Existing Information (Included in 4E)











0
E. Write Report











0
New, Reconstructed, Modified Sources











0
Notification of Demonstration of CEMS 2 1 2 3.9 7.8 0.39 0.78 $1,076.96



3.9
Notification of Initial Performance Evaluation of NOx CEMS 2 1 2 3.9 7.8 0.39 0.78 $1,076.96



3.9
Report of Performance Evaluation of NOx CEMS 2 1 2 3.9 7.8 0.39 0.78 $1,076.96



3.9
Quarterly Electronic Reports to Administrator 24 4 48 4 192 9.6 19.2 $26,510



16
Existing Sources











0
Notification of Demonstration of CEMS 2 1 2 39 78 3.9 7.8 $10,769.58



39
Notification of Initial Performance Evaluation of NOx CEMS 2 1 2 39 78 3.9 7.8 $10,769.58



39
Report of Initial Performance Evaluation of NOx CEMS Test Results 2 1 2 39 78 3.9 7.8 $10,769.58



39
CEDRI electronic submittal of NOx CEMS Report and Excess Emissions Report 2 6 12 39 468 23.4 46.8 $64,617.46



234
Report of Taconite Kiln Performance Testing submitted via CEDRI or analogous electronic reporting (Kilns with no existing low-NOx burners at effective date of rule) 2 1 2 6.3 12.6 0.63 1.26 $1,739.70



6.3
Subtotal for Reporting Requirements



9,591

$1,151,483



0
5. RECORDKEEPING REQUIREMENTS











0
A. Familiarize with regulatory requirement











0
B. Plan Activities











0
C. Implement Activities











0
D. Record Data NA










0
E. Time to Transmit or Disclose Information











0
Existing Sources











0
Data Collection 0.1 330 33 39 1,287 64.35 128.7 $177,698.02



12870
Recordkeeping of NOx emission rate, operating days data, CEMS data 0.1 330 33 39 1,287 64.35 128.7 $177,698.02



12870
New Sources











0
Data Collection 1.5 330 495 0 0 0 0 $0



39247.39 SUM
CEMS Recordkeeping 0.1 330 33 0 0 0 0 $0
59 hr/response
39247.09 Sum without CEMS
F. Time to Train Personnel 80 1 80 0 0 0 0 $0





G. Time for Audits NA












Subtotal for Recordkeeping Requirements



2,960

$355,396





Total Labor Burden and Cost (rounded) f



12,600 $1,510,000





Total Capital and O&M Cost (rounded) f






$7,630,000





Grand TOTAL (rounded) f






$9,100,000




















a We have assumed that there are approximately 26 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction.





b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.





c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.





d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure.





e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.





f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 17: IA-Y1

Iron and Steel Mills and Ferroalloy Manufacturing





Year 1, Sources: Boilers, Furnaces, Coke Ovens, Windbox













Table 11: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs












Activity (A) (B) (C) (D) (E) (F) (G) (H)





EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b







(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Labor Rates:
No. of Responses
Initial Performance Evaluation of NOx CEMS c 24 1 24 0 0.0 0.0 0.0 $0.00
Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. 0
Repeat Performance Evaluation of NOx CEMS d 24 1 24 0 0 0 0 $0
Technical $51.23
0
Report Review








Clerical $27.73
0
Review of Work Plan For Emission Units Not Identified in (d)(a)(i)(2) or (3) [refer to pg. 17 of Reg Text.doc] 8 1 8 20 160.0 8.00 16.00 $9,192.80
[12/28/21- se soon to Gina on the # of taconite mills, then subtract that # from the 35 units currently shown]

20
Review of Work Plan for Basic Oxygen Process Furnaces 8 1 8 4 32.0 1.60 3.20 $1,838.56



4
Review Demonstration Report For Taconite Kilns with Existing low-NOx burners 8 1 8 8 64.0 3.20 6.40 $3,677.12
[se Monday to Gina- how many estimated sources?]

8
Review Work Plan For Taconite Kilns with no Existing low-NOx burners 8 1 8 7 56.0 2.80 5.60 $3,217.48
[se Monday to Gina- how many estimated sources?]

7
Notification of Performance Evaluation of NOx CEMS e 0.5 1.1 0.55 39 21.5 1.1 2.1 $1,232.41



42.9
Review test results/CEMS Performance Evaluation Results e 8 1 8 39 312.0 15.60 31.20 $17,925.96



39
Review quarterly electronic summary reports 8 4 32 0 0 0.0 0.0 $0.00



0
TOTAL (rounded) f



740

$37,100



120.9 Sum















Assumptions:













a We have assumed that there are approximately 26 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified.





b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.





c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities.





d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.





e Modified, reconstructed, and existing facilities conduct initial testing.





f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 18: IA-Y2

Iron and Steel Mills and Ferroalloy Manufacturing





Year 2, Sources: Boilers, Furnaces, Coke Ovens, Windbox













Table 12: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs












Activity (A) (B) (C) (D) (E) (F) (G) (H)





EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b







(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Labor Rates:
No. of Responses
Initial Performance Evaluation of NOx CEMS c 24 1 24 0 0.0 0.0 0.0 $0.00
Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. 0
Repeat Performance Evaluation of NOx CEMS d 24 1 24 0 0 0 0 $0
Technical $51.23
0
Report Review








Clerical $27.73
0
Notification of Performance Evaluation of NOx CEMS e 0.5 1.1 0.55 39 21.5 1.1 2.1 $1,232.41



42.9
Review test results/CEMS Performance Evaluation Results e 8 1 8 39 312.0 15.60 31.20 $17,925.96



39
Review quarterly electronic summary reports 8 4 32 0 0 0.0 0.0 $0.00



0
TOTAL (rounded) f



380

$19,200



81.9 Sum















Assumptions:













a We have assumed that there are approximately 26 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified.





b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.





c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities.





d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.





e Modified, reconstructed, and existing facilities conduct initial testing.





f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 19: IA-Y3

Iron and Steel Mills and Ferroalloy Manufacturing





Year 3, Sources: Boilers, Furnaces, Coke Ovens, Windbox













Table 13: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs












Activity (A) (B) (C) (D) (E) (F) (G) (H)





EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b







(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Labor Rates:
No. of Responses
Initial Performance Evaluation of NOx CEMS c 24 1 24 0 0.0 0.0 0.0 $0.00
Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule. 0
Repeat Performance Evaluation of NOx CEMS d 24 1 24 0 0 0 0 $0
Technical $51.23
0
Report Review








Clerical $27.73
0
Notification of Performance Evaluation of NOx CEMS e 0.5 1.1 0.55 39 21.5 1.1 2.1 $1,232.41



42.9
Review test results/CEMS Performance Evaluation Results e 8 1 8 39 312.0 15.60 31.20 $17,925.96



39
Review quarterly electronic summary reports 8 4 32 0 0 0.0 0.0 $0.00



0
TOTAL (rounded) f



380

$19,200



81.9 Sum















Assumptions:













a We have assumed that there are approximately 26 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified.





b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.





c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities.





d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.





e Modified, reconstructed, and existing facilities conduct initial testing.





f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 20: ICOM

Iron and Steel Mills and Ferroalloy Manufacturing
Source: Boilers






Table 14: Capital/Startup vs. Operation and Maintenance (O&M) Costs









(A) (B) (C) (D) (E) (F) (G)
Year Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M, (E X F)
Year 1 NOx Continuous Emission Monitors $0 0 $0 $0
$0
Year 1 Initial CEMS testing $0 0 $0


Year 2 NOx Continuous Emission Monitors $0 0 $0 $0

Year 2 Initial CEMS testing $0 0 $0


Year 3 NOx Continuous Emission Monitors $153,700 0 $0

$0
Year 3 (a) initiala $131,222

$127,002 39 $4,953,078
Year 3 (b) annualb


$68,532 39 $2,672,748

TOTAL

$0

$7,630,000














Total Capital and O&M $7,630,000








a Initial annual capital and O&M cost ($116,459) from Portland Cement ICR (2019) and adjusted to 2023 cost.






b Annual capital and O&M cost ($53,600) from Boiler 5D MACT ICR (2010 ) and adjusted to 2023 cost.







Sheet 21: SI

Glass and Glass Product Manufacturing






Source: Furnaces














Table 17: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs






















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb





No. of Responses
1. APPLICATIONS NA







Labor Rates:

0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group
0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94

0
4. REPORT REQUIREMENTS








Clerical $62.51

0
A. Familiarize with regulatory requirement 1 1 1 40 40 2 4 $5,522.86




40
B. Required Activities









Number of furnaces

0
New, Reconstructed, Modified Sources - Testing c








New 0

0
Initial NOx Performance Test (furnaces) 24 2 48 4.4 211 10.56 21.12 $29,160.70
Reconstructed/modified 4.4

8.8
Repeat NOx Performance Test 24 2 48 0.22 11 0.528 1.056 $1,458.04
Existing 44

0.44
Existing Sources - Annual Testing d












0
Semi-annual NOx Performance Test (furnaces) 24 2 48 44 2,112 105.6 211.2 $291,607.01




88
Repeat NOx Performance Test 24 2 48 2.2 106 5.28 10.56 $14,580.35




4.4
New, Reconstructed, Modified Sources












0
Notification of Initial Performance Test 2 1 2 4.4 8.8 0.44 0.88 $1,215.03




4.4
Report of Performance Tests submitted via CEDRI or analogous electronic reporting 2 2 4 4.4 17.6 0.88 1.76 $2,430.06




8.8
Existing Sources












0
Notification of Semi-annual Performance Test 2 2 4 44 176 8.8 17.6 $24,300.58




88
Report of Semi-annual Performance Test Results submitted via CEDRI or analogous electronic reporting 2 2 4 44 176 8.8 17.6 $24,300.58




88
Subtotal for Reporting Requirements



3,286

$394,575




0
5. RECORDKEEPING REQUIREMENTS












0
A. Familiarize with regulatory requirement












0
B. Plan Activities












0
C. Implement Activities












0
D. Record Data NA











0
E. Time to Transmit or Disclose Information












0
Existing Sources












0
Data Collection 0.1 2 33 44 1,452 72.6 145.2 $200,479.82




88
Records of Performance Tests 0.1 2 24 44 1,056 52.8 105.6 $145,803.50




88
New Sources












0
Data Collection 1.5 2 3 0 0 0 0 $0




0
Records of Performance Tests 0.1 2 0.2 0 0 0 0 $0




0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0




0
G. Time for Audits NA











0
Subtotal for Recordkeeping Requirements



2,884

$346,283




506.84 Sum
Total Labor Burden and Cost (rounded) e



6,200 $740,000
29 hr/response



Total Capital and O&M Cost (rounded) e






$43,600






Grand TOTAL (rounded) e






$800,000






















a We have assumed that there are approximately 44 respondents operating furnaces and that 10% of the existing facilities will have new construction/reconstruction.






b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.






c New furnaces test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.






d The rule requires existing furnaces re-test semi-annually for NOx. Existing furnaces are assumed to not have existing CEMS installed.






e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 22: SA

Glass and Glass Product Manufacturing






Source: Furnaces














Table 18: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs














Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b








(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Labor Rates:

No. of Responses
Initial performance tests c 24 1 24 4.4 105.6 5.3 10.6 $6,067.25
Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
4.4
Repeat performance test d 24 1 24 0 0 0 0 $0
Technical $51.23

0
Report Review








Clerical $27.73

0
Notification of performance test e 0.5 1.1 0.55 44 24.2 1.2 2.4 $1,390.41




48.4
Review performance test results 8 2 16 44 704.0 35.20 70.40 $40,448.32




88
TOTAL (rounded) f



960

$47,900




140.8 Sum
















Assumptions:














a We have assumed that there are approximately 44 respondents with furnaces and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the semi-annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Modified or reconstructed facilities conduct initial testing, and existing facilities (kilns) conduct semi-annual testing.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 23: SS

Glass and Glass Product Manufacturing
Source: Furnaces





Table 19: Capital/Startup vs. Operation and Maintenance (O&M) Costs







(A) (B) (C) (D) (E) (F) (G)
Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost a
(B X C)
Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M
(E X F)







Performance Tests
0 $0 $0 0 $0
Monitoring Equipment
0 $0 $0 0 $0
File Cabinets
0 $0 $0 0 $0
Inspection of Emission Control Systems b $0 0 $0 $992 44 $43,648
Total c

$0

$43,600
a No new sources are expected and all existing sources have fully implemented capital costs to comply with the current standards. Therefore, no additional capital/start-up costs are expected.





b We estimate 34 glass manufacturing facilities with 44 affected furnaces. . We assume that annual inspections of emission control systems will require 8 hours per inspection at the current labor rate for technical personnel ($123.94/hr) for each of the 22 affected furnaces with a control device ($123.94 x 8 = $992 (rounded)).
c Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 24: BPPI-Y1

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing






Year 1, Boilers














Table 20: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs






















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb





No. of Responses
1. APPLICATIONS NA







Labor Rates:

0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group
0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94

0
4. REPORT REQUIREMENTS








Clerical $62.51

0
A. Familiarize with regulatory requirement 20 1 20 55 1100 55 110 $151,878.65




55
B. Required Activities









Number of Boilers

0
New, Reconstructed, Modified Sources - Testing c








New 0

0
Initial NOx Performance Test (boiler) 24 2 48 0 0 0 0 $0.00
Reconstructed/modified 5.5

0
Repeat NOx Performance Test 24 2 48 0 0 0 0 $0.00
Existing 55

0
Existing Sources - Initial Testing d








Assumed Units with Existing CEMS 5.5

0
Initial NOx Performance Test (boiler) 24 2 48 0 0 0 0 $0.00
Assumed Units without Existing CEMS 49.5

0
Repeat NOx Performance Test 24 2 48 0 0 0 0 $0.00




0
New and Existing Sources - Monitoring e












0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00




0
C. Create Information (Included in 4B)












0
D. Gather Existing Information (Included in 4E)












0
E. Write Report












0
New, Reconstructed, Modified Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Performance Tests 2 1 2 0 0 0 0 $0.00




0
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 24 4 48 0 0 0 0 $0




0
Existing Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Initial Performance Test Results 2 1 2 0 0 0 0 $0.00




0
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 2 4 8 0 0 0 0 $0.00




0
Subtotal for Reporting Requirements



1,265

$151,879




0
5. RECORDKEEPING REQUIREMENTS












0
A. Familiarize with regulatory requirement












0
B. Plan Activities












0
C. Implement Activities












0
D. Record Data NA











0
E. Time to Transmit or Disclose Information












0
Existing Sources












0
Data Collection 0.4 12 4.8 55 264 13.2 26.4 $36,450.88




660
Records of Montly Fuel Use 0.4 12 4.8 55 264 13.2 26.4 $36,450.88




660
New Sources












0
Data Collection 1.5 330 495 0 0 0 0 $0




0
Records of Monthly Fuel Use 0.1 330 33 0 0 0 0 $0




0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0




0
G. Time for Audits NA











0
Subtotal for Recordkeeping Requirements



607

$72,902




1375 Sum
Total Labor Burden and Cost (rounded) f



1,900 $220,000
9 hr/response



Total Capital and O&M Cost (rounded) f






$0






Grand TOTAL (rounded) f






$200,000






















a We have assumed that there are approximately 55 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction.






b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.






c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.






d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure.






e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 25: BPPI-Y2

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing






Year 2, Boilers














Table 21: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs






















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb





No. of Responses
1. APPLICATIONS NA







Labor Rates:

0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group
0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94

0
4. REPORT REQUIREMENTS








Clerical $62.51

0
A. Familiarize with regulatory requirement 1 1 1 0 0 0 0 $0.00




0
B. Required Activities









Number of Boilers

0
New, Reconstructed, Modified Sources - Testing c








New 0

0
Initial NOx Performance Test (boiler) 24 2 48 0 0 0 0 $0.00
Reconstructed/modified 5.5

0
Repeat NOx Performance Test 24 2 48 0 0 0 0 $0.00
Existing 55

0
Existing Sources - Initial Testing d








Assumed Units with Existing CEMS 5.5

0
Initial NOx Performance Test (boiler) 24 2 48 0 0 0 0 $0.00
Assumed Units without Existing CEMS 49.5

0
Repeat NOx Performance Test 24 2 48 0 0 0 0 $0.00




0
New and Existing Sources - Monitoring e












0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 0 0 0 0 $0.00




0
C. Create Information (Included in 4B)












0
D. Gather Existing Information (Included in 4E)












0
E. Write Report












0
New, Reconstructed, Modified Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Performance Tests 2 1 2 0 0 0 0 $0.00




0
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 24 4 48 0 0 0 0 $0




0
Existing Sources












0
Notification of Demonstration of CEMS 2 1 2 0 0 0 0 $0.00




0
Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00




0
Report of Initial Performance Test Results 2 1 2 0 0 0 0 $0.00




0
Submit Quarterly Electronic Reports to Administrator of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 2 4 8 0 0 0 0 $0.00




0
Subtotal for Reporting Requirements



0

$0




0
5. RECORDKEEPING REQUIREMENTS












0
A. Familiarize with regulatory requirement












0
B. Plan Activities












0
C. Implement Activities












0
D. Record Data NA











0
E. Time to Transmit or Disclose Information












0
Existing Sources












0
Data Collection 0.4 12 4.8 55 264 13.2 26.4 $36,450.88




660
Records of Montly Fuel Use 0.4 12 4.8 55 264 13.2 26.4 $36,450.88




660
New Sources












0
Data Collection 1.5 330 495 0 0 0 0 $0




0
Records of Monthly Fuel Use 0.1 330 33 0 0 0 0 $0




0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0




0
G. Time for Audits NA











0
Subtotal for Recordkeeping Requirements



607

$72,902




1320 Sum
Total Labor Burden and Cost (rounded) f



600 $70,000
3 hr/response



Total Capital and O&M Cost (rounded) f






$0






Grand TOTAL (rounded) f






$100,000






















a We have assumed that there are approximately 55 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction.






b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.






c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.






d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure.






e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 26: BPPI-Y3

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing





Year 3, Boilers













Table 22: Annual Respondent Burden and Cost – Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs




















Burden Item (A)
Hours per Occurrence
(B)
Occurrences/ Respondent/ Year
(C)
Hours/ Respondent/ Year
(A x B)
(D)
Respondents/
Yeara
(E)
Technical Hours/Year
(C x D)
(F) Managerial Hours/Year
(E x 0.05)
(G)
Clerical Hours/Year
(E x 0.10)
(H)
Cost/ Yearb




No. of Responses
1. APPLICATIONS NA







Labor Rates:
0
2. SURVEY AND STUDIES NA







Management $157.61 These rates were updated 12/21/21 to match the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by occupational and industry group 0
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS 16 1 16 0 0 0 0 $0
Technical $123.94
0
4. REPORT REQUIREMENTS








Clerical $62.51
0
A. Familiarize with regulatory requirement 20 1 20 0 0 0 0 $0.00



0
B. Required Activities









Number of Boilers
0
New, Reconstructed, Modified Sources - Testing c








New 0
0
Initial NOx Performance Test (boiler) 24 2 48 5.5 264 13.2 26.4 $36,450.88
Reconstructed/modified 5.5
11
Repeat NOx Performance Test 24 2 48 0.275 13 0.66 1.32 $1,822.54
Existing 55
0.55
Existing Sources - Initial Testing d








Assumed Units with Existing CEMS 5.5
0
Initial NOx Performance Test (boiler) 24 2 48 55 2,640 132 264 $364,508.76
Assumed Units without Existing CEMS 49.5
110
Repeat NOx Performance Test 24 2 48 2.75 132 6.6 13.2 $18,225.44



5.5
New and Existing Sources - Monitoring e











0
Daily Calibration Drift Tests - NOx CEMS 0.3 330 99 55 5,445 272.25 544.5 $751,799.32



18150
C. Create Information (Included in 4B)











0
D. Gather Existing Information (Included in 4E)











0
E. Write Report











0
New, Reconstructed, Modified Sources











0
Notification of Demonstration of CEMS 2 1 2 5.5 11 0.55 1.1 $1,518.79



5.5
Notification of Initial Performance Test 2 1 2 5.5 11 0.55 1.1 $1,518.79



5.5
Report of Performance Tests submitted via CEDRI or analogous electronic reporting 2 1 2 4.95 9.9 0.495 0.99 $1,366.91



4.95
Submit Written Request to Administrator documenting Initial Performance Test and an Alternative Monitoring Plan (Alternative to CEMS).f 10 1 10 0.55 5.5 0.275 0.55 $759.39



0.55
Submit Quarterly Electronic Reports to of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 24 4 48 4 192 9.6 19.2 $26,510



16
Existing Sources











0
Notification of Demonstration of CEMS 2 1 2 55 110 5.5 11 $15,187.87



55
Notification of Initial Performance Test 2 1 2 55 110 5.5 11 $15,187.87



55
Report of Initial Performance Test Results submitted via CEDRI or analogous electronic reporting 2 1 2 49.5 99 4.95 9.9 $13,669.08



49.5
Submit Written Request to Administrator documenting Initial Performance Test and an Alternative Monitoring Plan (Alternative to CEMS).f 10 1 10 5.5 55 2.75 5.5 $7,593.93



5.5
Submit Quarterly Electronic Reports via CEDRI or analogous electronic reporting to EPA of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 2 4 8 55 440 22 44 $60,751.46



220
Subtotal for Reporting Requirements



10,968

$1,316,871



0
5. RECORDKEEPING REQUIREMENTS











0
A. Familiarize with regulatory requirement











0
B. Plan Activities











0
C. Implement Activities











0
D. Record Data NA










0
E. Time to Transmit or Disclose Information











0
Existing Sources











0
Data Collection 0.1 330 33 55 1,815 90.75 181.5 $250,599.77



18150
Records of Monthly Fuel Use, Average Hourly NOx emission rates, 30-day average NOx emission rates, Excess Emissions data, Missed monitoring day data, "F" factor, and CEMS monitoring data. 0.1 330 33 55 1,815 90.75 181.5 $250,599.77



18150
New Sources











0
Data Collection 1.5 330 495 0 0 0 0 $0



0
Records of Monthly Fuel Use, Average Hourly NOx emission rates, 30-day average NOx emission rates, Excess Emissions data, Missed monitoring day data, "F" factor, and CEMS monitoring data. 0.1 330 33 0 0 0 0 $0



0
F. Time to Train Personnel 80 1 80 0 0 0 0 $0



0
G. Time for Audits NA










0
Subtotal for Recordkeeping Requirements



4,175

$501,200



54994.55
Total Labor Burden and Cost (rounded) f



15,100 $1,820,000
71 hr/response
36844.55 Sum
Total Capital and O&M Cost (rounded) f






$10,170,000




Sum without CEMS
Grand TOTAL (rounded) f






$12,000,000




















a We have assumed that there are approximately 55 respondents operating boilers and that 10% of the existing facilities will have new construction/reconstruction.





b This ICR uses the following labor rates: $157.61 per hour for Executive, Administrative, and Managerial labor; $123.94 per hour for Technical labor, and $62.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.





c New boilers test for NOx. We have assumed that 5 percent of respondents would repeat initial performance test due to failure.





d The rule requires existing boilers to conduct an initial compliance test within 90 days from the installation of the pollution control equipment used to comply with the NOx emission limits. We have assumed that 5 percent of respondents would repeat annual performance test due to failure.





e Calibration drift checks on the air flow sensor on the NOx CEMS are performed daily.





f 10 percent of respondents are assumed to submit a written request to Administrator for an alternative monitoring procedure (instead of use of CEMS).





g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 27: BPPA-Y1

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing






Year 1, Boilers














Table 23: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs














Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Responses
Initial performance tests c 24 1 24 0 0.0 0.0 0.0 $0.00
Technical $51.23

0
Repeat performance test d 24 1 24 0 0 0 0 $0
Clerical $27.73

0
Report Review












0
Notification of performance test e 0.5 1.1 0.55 0 0.0 0.0 0.0 $0.00




0
Review test results/CEMS Results e 8 1 8 0 0.0 0.00 0.00 $0.00




0
Review quarterly electronic summary reports of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 8 4 32 0 0 0.0 0.0 $0.00




0
TOTAL (rounded) f



0

$0




0 Sum
















Assumptions:














a We have assumed that there are approximately 55 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Modified, reconstructed, and existing facilities conduct initial testing.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 28: BPPA-Y2

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing






Year 1, Boilers














Table 24: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs














Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Responses
Initial performance tests c 24 1 24 0 0.0 0.0 0.0 $0.00
Technical $51.23

0
Repeat performance test d 24 1 24 0 0 0 0 $0
Clerical $27.73

0
Report Review












0
Notification of performance test e 0.5 1.1 0.55 0 0.0 0.0 0.0 $0.00




0
Review test results/CEMS Results e 8 1 8 0 0.0 0.00 0.00 $0.00




0
Review quarterly electronic summary reports of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 8 4 32 0 0 0.0 0.0 $0.00




0
TOTAL (rounded) f



0

$0




0 Sum
















Assumptions:














a We have assumed that there are approximately 55 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Modified, reconstructed, and existing facilities conduct initial testing.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 29: BPPA-Y3

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; Pulp, Paper, and Paperboard Manufacturing






Year 3, Boilers














Table 25: Average Annual EPA Burden and Cost - Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Primary Ozone NAAQS: Transport Obligations for non-EGUs














Activity (A) (B) (C) (D) (E) (F) (G) (H)






EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b
Labor Rates:





(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)

Management $69.04 These rates were updated 12/21/21 to match the rates from the Office of Personnel Management (OPM), 2021 General Schedule.
No. of Responses
Initial performance tests c 24 1 24 0 0.0 0.0 0.0 $0.00
Technical $51.23

0
Repeat performance test d 24 1 24 0 0 0 0 $0
Clerical $27.73

0
Report Review












0
Notification of performance test e 0.5 1.1 0.55 55 30.3 1.5 3.0 $1,738.01




60.5
Review test results/CEMS Results e 8 1 8 55 440.0 22.00 44.00 $25,280.20




55
Review quarterly electronic summary reports of NOx Emission Rates data, Excess Emissions, Missing and Excluded Data, "F" factor, and other CEMS data. 8 4 32 0 0 0.0 0.0 $0.00




0
TOTAL (rounded) f



540

$27,000




115.5 Sum
















Assumptions:














a We have assumed that there are approximately 55 respondents with boilers and that 10% of the existing facilities will be re-constructed or modified.






b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $69.04 (GS-13, Step 5, $43.15 + 60%), Technical rate of $51.23 (GS-12, Step 1, $32.02 + 60%), and Clerical rate of $27.73 (GS-6, Step 3, $17.33 + 60%). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule” which excludes locality rates of pay.






c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities.






d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests.






e Modified, reconstructed, and existing facilities conduct initial testing.






f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







Sheet 30: BPPCOM

Basic Chemical Manufacturing; Petroleum and Coal Products Manufacturing; and Pulp, Paper, and Paperboard Manufacturing
Source: Boilers






Table 26: Capital/Startup vs. Operation and Maintenance (O&M) Costs









(A) (B) (C) (D) (E) (F) (G)
Year Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M, (E X F)
Year 1 NOx Continuous Emission Monitors $0 0 $0 $0
$0
Year 1 Initial CEMS testing $0 0 $0


Year 2 NOx Continuous Emission Monitors $0 0 $0 $0

Year 2 Initial CEMS testing $0 0 $0


Year 3 NOx Continuous Emission Monitorsa $153,700 0 $0
49.5 $0
Year 3 (a) initialb $131,222

$127,002 49.5 $6,286,599
Year 3 (b) annualc


$68,532 49.5 $3,392,334
Year 3 Initial O2 or CO2 Monitorsa





Year 3 (a) initial


$8,523 49.5 $421,889
Year 3 (b) annual


$1,436 49.5 $71,082

TOTAL

$0

$10,170,000














Total Capital and O&M $10,170,000
a10 percent of 55 Respondents are assumed to have existing NOx CEMS and existing O2 or CO2 monitors installed.






b Initial annual capital and O&M cost ($116,459) from Portland Cement ICR (2019) and adjusted to 2023 cost.






c Annual capital and O&M cost ($53,600) from Boiler 5D MACT ICR (2010 ) and adjusted to 2023 cost.






File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet