FS-1500-17a Financial Plan A

Federal and Non-Federal Financial Assistance Instruments

FS 1500-17a Fin Plan Long Form.xlsx

OMB: 0596-0217

Document [xlsx]
Download: xlsx | pdf

Overview

Instructions
V.1 Fin. Plan-Long Form-No PI
FS Non-Cash Cont. (a)
Volunteer Labor (In-Kind) (b)
FS Cash to the Coop. (c)
Coop. Non-Cash Cont. (d)
Value of In-Kind Cont.
Cash to FS
3rd Party Cash
3rd Party Noncash
3rd Party In-Kind
V.2Fin. Plan-Long Frm-With PI
V.3 Fin. Plan Long Form- No PI
V.4 Fin. Plan-Long Frm-With PI


Sheet 1: Instructions

Instructions: Use this form in conjunction with Forest Service Handbook (FSH) 1509.11, Ch. 70, Financial Planning Requirements, for participating, challenge cost-share, joint venture, and cost-reimbursable agreements. This form may be used for other types of Forest Service Manual 1580 agreements, when useful. Choose one of the four (4) financial plan versions and complete. Each four versions require identical information and result in calculations and cost analysis that are the same. Primarily, these versions vary in the way that information is entered into the financial plan matrix. Version 1 (Financial Plan - Long Form - No Program Income) and Version 2 (Financial Plan - Long Form With Program Income) cost analysis data values are automatically entered into the financial plan matrix. Version 3 (Financial Plan - Long Form - No Program Income) and Version 4 (Financial Plan - Long Form With Program Income) require manual entry of the cost analysis data values into the financial plan matrix. Users do not have to use or print versions/sheets that are not applicable to their agreement.











The purpose of this form is to capture the total estimated value of the proposed agreement. Once the agreement is approved, in writing, by the parties, then this financial plan becomes the financial estimates for the agreement. This financial plan must display the parties' expected contributions to the agreement. These contributions should be broken down by party contribution type (e.g., non-cash, in-kind, cash to cooperator), see below for definitions, and cost elements (e.g., salaries, supplies, travel). Cost element values should be the result of documented cost analysis on this form. Each financial plan version provides samples of cost analysis calculations, see associated Excel comment balloons. Additional instructions are located on version 1/2 cost analysis tabs.










Definitions for the Matrix Column Headings:


















(a) Forest Service Non Cash Contribution: Forest Service noncash contributions may consist of employee salaries, overhead (indirect), travel provided, and/or equipment and supplies purchased and provided to the Cooperator for use in the project. These costs are an expense to the U.S. Forest Service, but do not include funding for reimbursement of Cooperator expenses.










(b) Forest Service Volunteer Labor (In-Kind) Contribution: This is the value of volunteer labor donated for completion of the project by the Forest Service for which the Forest Service has incurred no expense. Forest Service volunteer agreements (either sponsored or individual) should be used to document the donated services. The value of volunteer labor should be commensurate with local labor rates for similar work.










(c) Forest Service Cash to the Cooperator: This is the maximum amount of funding that will be reimbursed or advanced to the Cooperator. This is an expense to the Forest Service.










(d) Cooperator Noncash Contribution: These are expenses the Cooperator incurs that are contributed to the project in lieu of cash, but for which costs are incurred, such as employee salaries, overhead (indirect costs), travel, equipment, supplies, and so forth. These do not include in-kind contributions from third parties, such as donations from other entities or volunteer labor.










(e) Value of Cooperator In-Kind Contribution: Cooperator in-kind contributions provided toward completion of the project for which the Cooperator has incurred no expense. These contributions can be made from the Cooperator or through the Cooperator by other entities and include such items as volunteer labor, donated materials, equipment, supplies, etc. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement.










(f) Cooperator Cash to the Forest Service: These are Cooperator cash contributions actually transferred to the Forest Service for use in completing the project. This is an expense to the Cooperator and does not include in-kind contributions made to the Cooperator from other organizations. Display by Cost Element where these funds will be expended. Be sure to cite a collection authority in the Agreement if this column is used. Include cash the Cooperator is transferring to the Forest Service for the project, that has been received as a grant(s) from a non-Federal entity(ies).










(g) Cooperator, Third Party Cash Contribution, Federal: This includes cash contributions provided to the Cooperator from another Federal agency for use in the project, for which the Cooperator has incurred no expense. Display these contributions by Cost Element Expenditures.










(h) Cooperator, Thrid Party Noncash Contribution, Federal: Noncash contribution provided to the Cooperator from Federal agencie(s) for use in the project, for which the Cooperator has incurred no expense. Display these contributions by Cost Element Expenditures.










(i) Cooperator, Third Party In-Kind Contribution, Federal: In-kind contribution provided to the Cooperator from Federal organization(s) for use in the project, for which the Cooperator has incurred no expense. Value assessed for volunteer labor and donated materials, equipment and supplies should be valued based on FSH 1509.11, Ch. 70. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. Display these contributions by Cost Element Expenditures.










(j) Gross Total Project Value: The sum of all the values provided toward the project without Estimated Gross Program Income taken into consideration.










(k) Estimated Gross Program Income: The gross income estimated to be generated under the project between the effective date of award and completion of the project, such as conference or workshop fees received, rental fees earned from renting real property or equipment acquired with agreement funds, or the sale of commodities or items developed under the project.










(l) Estimated Net Total Project Value: The sum of all the values provided toward the project with Estimated Gross Program Income taken into consideration. This figure reflects the true estimated cost of the project.










Definitions for Cost Allowability


















(a) Allowable Cost: A cost, as recorded on the Agreements Financial Plan (Long, Medium, and Short) forms, associated with an agreement, which meets the criteria for authorized expenditures specific in a cost principle methodology. Generally, it meets the cost principle methodology, and is a cost the parties to an agreement intend to charge, and must be: Reasonable for the performance of the award; Necessary and reasonable for proper and efficient performance and administration of the agreement; Consistently treated as either a direct or indirect cost; Generally, determined in accordance with generally accepted accounting principles (GAAP);
Net of all applicable credits (that is, less any future rebates from the purchase of goods or services); Separate from a cost or from a cost-sharing/matching requirement of another Federal award or agreement, unless otherwise permitted by Federal law or regulation; Adequately documented; Authorized or not prohibited by Federal, State, or local laws and regulations; Compliant with limits or exclusions on types or amounts of costs, as set forth in relevant Federal laws, agreement terms and conditions, or other governing regulations (examples of such costs include: entertainment, alcohol, and taxes); and,Consistent with the agency’s and cooperator’s internal policies, regulations, and procedures that apply to both Federal awards or agreements and other cooperator activities.










(b) Allocable Cost: A cost, as recorded on the Agreements Financial Plan (Long, Medium, and Short) forms, associated with an agreement, which in accordance with the relative benefit received by either party for the award, is treated consistently with other costs incurred for the same purpose and in like circumstances, and if it: Is incurred specifically for the award; Benefits both the award and other ancillary work, and the cost may be distributed in reasonable proportion to the benefits received (an example of this type of cost is a piece of equipment that is used for multiple projects); or Necessary to the overall operation of the organization, although a direct relationship to any particular cost objective may not be shown.










(c) Reasonable Cost: A cost, as recorded on the Agreements Financial Plan (Long, Medium, and Short) forms, associated with an agreement, that, in its nature and amount, does not exceed an amount that a prudent person, under the circumstances prevailing at the time the decision was made, would incur. Other factors to consider are: Whether the cost is of a type generally recognized as ordinary and necessary for the entity’s operation or agreement performance; The restraints or requirements imposed by factors such as generally accepted, sound, business practices; arms-length bargaining; Federal and State laws and regulations; and the terms and conditions of the agreement; Market prices or industry standard costs for similar goods and services (that is, is the cooperator offering goods or services for an amount that exceeds what is readily available in the marketplace); Whether individuals concerned acted with prudence under the circumstances, considering their responsibilities to the entity; its members, employees, and clients; the public; and the government; and Significant deviations from established practices of the governmental entity that might unjustifiably increase costs charged to the agreement.










Burden Statement










According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0596-0217. The time required to complete this information collection is estimated to average 45 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA’s TARGET Center at 202-720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call toll free (866) 632-9992 (voice). TDD users can contact USDA through local relay or the Federal relay at (800) 877-8339 (TDD) or (866) 377-8642 (relay voice). USDA is an equal opportunity provider and employer.

Sheet 2: V.1 Fin. Plan-Long Form-No PI

Attachment










USFS Agreement No.
Mod No.




Cooperator Agreement No.




















This Financial Plan may not be used to collect funds AND disburse funds on the same agreement. Separate agreements must be used in this situation.



































Agreements Financial Plan (Long Form) without Program Income











1. Financial Plan Matrix: Note: All columns may not be used. Use depends on source and type of contribution(s).



FOREST SERVICE CONTRIBUTIONS COOPERATOR CONTRIBUTIONS

(a) Forest Service Noncash Contribution: Forest Service noncash contributions may consist of employee salaries, overhead (indirect), travel provided, and/or equipment and supplies purchased and provided to the Cooperator for use in the project. These costs are an expense to the Forest Service, but do not include funding for reimbursement of Cooperator expenses. (a) (b) Forest Service Volunteer Labor (In-Kind) Contribution: This is the value of volunteer labor donated for completion of the project by the Forest Service for which the Forest Service has incurred no expense. Forest Service volunteer agreements (either sponsored or individual) should be used to document the donated services. The value of volunteer labor should be commensurate with local labor rates for similar work. (b) (c) Forest Service Cash to the Cooperator: This is the maximum amount of funding that will be reimbursed or advanced to the Cooperator. This is an expense to the Forest Service. (c) (d) Cooperator Noncash Contribution: These are expenses the Cooperator incurs that are contributed to the project in lieu of cash, but for which costs are incurred, such as employee salaries, overhead (indirect costs), travel, equipment, supplies, and so forth. These do not include in-kind contributions from third parties, such as donations from other entities or volunteer labor. (d) ashleejackson: (e) Value of Cooperator In-Kind Contribution: Cooperator in-kind contributions provided toward completion of the project for which the Cooperator has incurred no expense. These contributions can be made from the Cooperator or through the Cooperator by other entities and include such items as volunteer labor, donated materials, equipment, supplies, etc. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. (e) ashleejackson: (f) Cooperator Cash to the Forest Service: These are Cooperator cash contributions actually transferred to the Forest Service for use in completing the project. This is an expense to the Cooperator and does not include in-kind contributions made to the Cooperator from other organizations. Display by Cost Element where these funds will be expended. Be sure to cite a collection authority in the Agreement if this column is used. Include cash the Cooperator is transferring to the Forest Service for the project, that has been received as a grant(s) from a non-Federal entity(ies). (f) (g) (h) (i) (h) Gross Total Project Value: The sum of all the values provided toward the project without Estimated Gross Program Income taken into consideration. (j)
TOTAL


Volunteer Cash
Value of
Third Party
COST ELEMENTS Noncash Labor to Noncash In-Kind Cash to FS Cash Noncash In-Kind
(Direct Costs)
(In-Kind) Cooperator
Contributions
ashleejackson: (g) Cooperator, Third Party Cash Contribution, Federal: This includes cash contributions provided to the Cooperator from another Federal agency for use in the project. Display these contributions by Cost Element Expenditures. Federal ashleejackson: (h) Cooperator, Third Party Noncash Contribution, Federal: Noncash contribution provided to the Cooperator from Federal agencie(s) for use in the project. Display these contributions by Cost Element Expenditures. Federal ashleejackson: Cooperator has incurred no expense. Value assessed for volunteer labor and donated materials, equipment and supplies should be valued based on FSH 1509.11, Ch. 70. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. Display these contributions by Cost Element Expenditures. Federal
Salaries/Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Equipment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Supplies/Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Printing $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
This cost element can be replaced with a cost element unique to your agreement, for example 'sub-contracts'. Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
This cost element can be replaced with a cost element unique to your agreement. Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Cooperator Indirect Costs

$0.00 $0.00




0.00
FS Overhead Assessment $0.00



$0.00


0.00
Gross Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00






















Matching Costs Determination







Total Forest Service Share =
(k)







(a+b+c)/(j) = (k)
#DIV/0!







Other Federal Contribution =
(l)







(g+h+i)/(j) = (l)
#DIV/0!







Total Federal Share =
(m)







(k+l) = (m)
#DIV/0!







Total Cooperator Share
(n)







(d+e+f)/(j) = (n)
#DIV/0!







Total
(o)







(m+n) = (o)
#DIV/0!









Sheet 3: FS Non-Cash Cont. (a)

WORKSHEET FOR
FS Non-Cash Contribution Cost Analysis, Column (a)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation
Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Salaries/Labor



$0.00












Travel



Standard Calculation




Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Travel



$0.00












Equipment



Standard Calculation
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation


















Total Equipment



$0.00












Supplies/Materials



Standard Calculation
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Supplies/Materials



$0.00












Printing



Standard Calculation
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation






Total Printing



$0.00












Other Expenses



Standard Calculation
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Other



$0.00






Subtotal Direct Costs $0.00












Forest Service Overhead Costs









Current Overhead Rate Subtotal Direct Costs

Total

$0.00

$0.00
Total FS Overhead Costs



$0.00












TOTAL COST $0.00

Sheet 4: Volunteer Labor (In-Kind) (b)

WORKSHEET FOR
Volunteer Labor (In-Kind) Cost Analysis, Column (b)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation




Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Salaries/Labor



$0.00












Travel



Standard Calculation




Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Travel



$0.00












Equipment



Standard Calculation
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation


















Total Equipment



$0.00












Supplies/Materials



Standard Calculation
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Supplies/Materials



$0.00












Printing



Standard Calculation
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation






Total Printing



$0.00












Other Expenses



Standard Calculation
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Other



$0.00






Subtotal Direct Costs $0.00
























TOTAL COST $0.00

Sheet 5: FS Cash to the Coop. (c)

WORKSHEET FOR
FS Cash to the Cooperator Cost Analysis, Column (c)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation
Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Salaries/Labor



$0.00












Travel



Standard Calculation
Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Travel



$0.00












Equipment



Standard Calculation
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Equipment



$0.00












Supplies/Materials



Standard Calculation
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Supplies/Materials



$0.00












Printing



Standard Calculation
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation





$0.00
Total Printing



$0.00












Other Expenses



Standard Calculation
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Other



$0.00






Subtotal Direct Costs $0.00












Cooperator Indirect Costs









Current Overhead Rate Subtotal Direct Costs

Total

$0.00

$0.00
Total Coop. Indirect Costs


$0.00












TOTAL COST $0.00

Sheet 6: Coop. Non-Cash Cont. (d)

WORKSHEET FOR
Cooperator Non-Cash Contribution Cost Analysis, Column (d)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation
Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Salaries/Labor



$0.00












Travel



Standard Calculation
Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Travel



$0.00












Equipment



Standard Calculation
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Equipment



$0.00












Supplies/Materials



Standard Calculation
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Supplies/Materials



$0.00












Printing



Standard Calculation
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation





$0.00
Total Printing



$0.00












Other Expenses



Standard Calculation
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Other



$0.00






Subtotal Direct Costs $0.00












Cooperator Indirect Costs









Current Overhead Rate Subtotal Direct Costs

Total

$0.00

$0.00
Total Coop. Indirect Costs


$0.00












TOTAL COST $0.00

Sheet 7: Value of In-Kind Cont.

WORKSHEET FOR
Value of In-Kind Contributions Cost Analysis, Column (e)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation




Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Salaries/Labor



$0.00












Travel



Standard Calculation




Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Travel



$0.00












Equipment



Standard Calculation
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation


















Total Equipment



$0.00












Supplies/Materials



Standard Calculation
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Supplies/Materials



$0.00












Printing



Standard Calculation
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation






Total Printing



$0.00












Other Expenses



Standard Calculation
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Other



$0.00






Subtotal Direct Costs $0.00
























TOTAL COST $0.00

Sheet 8: Cash to FS

WORKSHEET FOR
Cash to FS Cost Analysis, Column (f)
Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation




Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation
















Total Salaries/Labor



$0.00












Travel



Standard Calculation
Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Travel



$0.00












Equipment



Standard Calculation
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation


















Total Equipment



$0.00












Supplies/Materials



Standard Calculation
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Supplies/Materials



$0.00












Printing



Standard Calculation
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation






Total Printing



$0.00












Other Expenses



Standard Calculation
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation












Total Other



$0.00






Subtotal Direct Costs $0.00












Forest Service Overhead Costs









Current Overhead Rate Subtotal Direct Costs

Total

$0.00

$0.00
Total FS Overhead Costs



$0.00






TOTAL COST $0.00

Sheet 9: 3rd Party Cash

WORKSHEET FOR
Third Party Cash Cost Analysis, Column (g)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation,and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation - Federal




Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal
















Total Salaries/Labor - Federal



$0.00












Travel



Standard Calculation - Federal




Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal
















Total Travel - Federal



$0.00












Equipment



Standard Calculation - Federal
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal


















Total Equipment - Federal



$0.00












Supplies/Materials



Standard Calculation - Federal
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal












Total Supplies/Materials - Federal



$0.00












Printing



Standard Calculation - Federal
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation - Federal






Total Printing - Federal



$0.00












Other Expenses



Standard Calculation - Federal
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal












Total Other - Federal



$0.00












Subtotal Direct Costs $0.00
























TOTAL COST $0.00

Sheet 10: 3rd Party Noncash

WORKSHEET FOR
Third Party Noncash Cost Analysis, Column (h)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation - Federal




Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal
















Total Salaries/Labor - Federal



$0.00












Travel



Standard Calculation - Federal




Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal
















Total Travel - Federal



$0.00












Equipment



Standard Calculation - Federal
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal


















Total Equipment - Federal



$0.00












Supplies/Materials



Standard Calculation - Federal
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal












Total Supplies/Materials - Federal


$0.00












Printing



Standard Calculation - Federal
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation - Federal






Total Printing - Federal



$0.00












Other Expenses



Standard Calculation - Federal
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal












Total Other - Federal



$0.00












Subtotal Direct Costs $0.00
























TOTAL COST $0.00

Sheet 11: 3rd Party In-Kind

WORKSHEET FOR
Third Party In-Kind Cost Analysis, Column (i)






Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.






Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line item's cost, e.g. cost/day x # of days=total, where the total is calculated automatically. The Non-Standard Calculation sections provide a write-in area for line items that require a calculation formula that is other than the standardized formules, e.g. instead of salaries being calculated by cost/day x # of days, costs may be calculated simply by a contracted value that is not dependent on days worked, such as 1 employee x $1,200/contract= $1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.






Salaries/Labor



Standard Calculation - Federal




Job Description
Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal
















Total Salaries/Labor - Federal


$0.00












Travel



Standard Calculation - Federal




Travel Expense Employees Cost/Trip # of Trips
Total





$0.00





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal
















Total Travel - Federal



$0.00












Equipment



Standard Calculation - Federal
Piece of Equipment # of Units Cost/Day # of Days
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal


















Total Equipment - Federal


$0.00












Supplies/Materials



Standard Calculation - Federal
Supplies/Materials
# of Items Cost/Item
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal












Total Supplies/Materials - Federal


$0.00












Printing



Standard Calculation - Federal
Paper Material
# of Units Cost/Unit
Total





$0.00
Non-Standard Calculation - Federal






Total Printing - Federal



$0.00












Other Expenses



Standard Calculation - Federal
Item
# of Units Cost/Unit
Total





$0.00





$0.00





$0.00





$0.00
Non-Standard Calculation - Federal












Total Other - Federal



$0.00












Subtotal Direct Costs $0.00
























TOTAL COST $0.00

Sheet 12: V.2Fin. Plan-Long Frm-With PI

Attachment:










USFS Agreement No.:

Mod. No.



Cooperator Agreement No.:


















This Financial Plan may not be used to collect funds AND disburse funds on the same agreement.
Separate agreements must be used in this situation.

























Agreements Financial Plan (Long Form) with Program Income











1. Financial Plan Matrix: Note: All columns may not be used. Use depends on source and type of contribution(s).

FOREST SERVICE CONTRIBUTIONS COOPERATOR CONTRIBUTIONS

(a) Forest Service Noncash Contribution: Forest Service noncash contributions may consist of employee salaries, overhead (indirect), travel provided, and/or equipment and supplies purchased and provided to the Cooperator for use in the project. These costs are an expense to the Forest Service, but do not include funding for reimbursement of Cooperator expenses. (a) (b) Forest Service Volunteer Labor (In-Kind) Contribution: This is the value of volunteer labor donated for completion of the project by the Forest Service for which the Forest Service has incurred no expense. Forest Service volunteer agreements (either sponsored or individual) should be used to document the donated services. The value of volunteer labor should be commensurate with local labor rates for similar work. (b) (c) Forest Service Cash to the Cooperator: This is the maximum amount of funding that will be reimbursed or advanced to the Cooperator. This is an expense to the Forest Service. (c) (d) Cooperator Noncash Contribution: These are expenses the Cooperator incurs that are contributed to the project in lieu of cash, but for which costs are incurred, such as employee salaries, overhead (indirect costs), travel, equipment, supplies, and so forth. These do not include in-kind contributions from third parties, such as donations from other entities or volunteer labor. (d) ashleejackson: (e) Value of Cooperator In-Kind Contribution: Cooperator in-kind contributions provided toward completion of the project for which the Cooperator has incurred no expense. These contributions can be made from the Cooperator or through the Cooperator by other entities and include such items as volunteer labor, donated materials, equipment, supplies, etc. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. (e) ashleejackson: (f) Cooperator Cash to the Forest Service: These are Cooperator cash contributions actually transferred to the Forest Service for use in completing the project. This is an expense to the Cooperator and does not include in-kind contributions made to the Cooperator from other organizations. Display by Cost Element where these funds will be expended. Be sure to cite a collection authority in the Agreement if this column is used. Include cash the Cooperator is transferring to the Forest Service for the project, that has been received as a grant(s) from a non-Federal entity(ies). (f) (g) (h) (i) (j) Gross Total Project Value: The sum of all the values provided toward the project without Estimated Gross Program Income taken into consideration. (j)
GROSS TOTAL BY LINE


Volunteer Cash
Value of
Third Party
COST ELEMENTS Noncash Labor to Noncash In-Kind Cash to FS Cash Noncash In-Kind
(Direct Costs)
(In-Kind) Cooperator
Contributions
(g) Cooperator, Third Party Cash Contribution, Federal: This includes cash contributions provided to the Cooperator from another Federal agency for use in the project. Display these contributions by Cost Element Expenditures. Federal (h) Cooperator, Third Party Noncash Contribution, Federal: Noncash contribution provided to the Cooperator from Federal agencie(s) for use in the project. Display these contributions by Cost Element Expenditures. Federal (i) Cooperator, Third Party In-Kind Contribution, Federal: In-kind contribution provided to the Cooperator from Federal organization(s) for use in the project, for which the Cooperator has incurred no expense. Value assessed for volunteer labor and donated materials, equipment and supplies should be valued based on FSH 1509.11, Ch. 70. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. Display these contributions by Cost Element Expenditures. Federal
Salaries/Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Equipment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Supplies/Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Printing $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
This cost element can be replaced with a cost element unique to your agreement, for example 'sub-contracts'. Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
This cost element can be replaced with a cost element unique to your agreement. Other








0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Cooperator Indirect Costs

$0.00 $0.00




0.00
FS Overhead Assessment $0.00



$0.00


0.00
Gross Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00











Deductive Alternative is required. Assumes that all costs are allowable. PROGRAM INCOME (PI): CONTRIBUTIONS AND DEDUCTIVE ALTERNATIVE
(m) Estimated Gross Program Income (enter a number) (i) Estimated Gross Program Income: The gross income estimated to be generated under the project between the effective date of award and completion of the project, such as conference or workshop fees received, rental fees earned from renting real property or equipment acquired with agreement funds, or the sale of commodities or items developed under the project.
FOREST SERVICE EXPENSES FS Contribution subject to reduction by Program Income. It is the total of columns (a) and (c). Expenses Subject to PI $0.00 PI SUMMARY:
Estimated Cooperator cash reduction on expenses subject to PI
#DIV/0!

% of PI applied to Expenses #DIV/0! Estimated FS cash reduction on expenses subject to PI #DIV/0!
FS Net Project Expense Forest Service Net Total Project Expenses (which excludes Forest Service In-kind Contributions) after reducing Forest Service expenses by the Forest Service's proportionate share of Program Income.
#DIV/0! Estimated total amount FS will reimburse Cooperator from Cooperator invoice At the end of the project, if this amount is zero, the FS will pay the Cooperator nothing. If this amount is negative, the Cooperator will owe the FS the amount reflected here. #DIV/0!




Estimated number of invoices (enter a number, if known) Information for this block may not be known before the agreement is executed. In this case, leave blank. When entering a number, consider the billing cycle, e.g. quarterly or monthly. In these cases you would use 4 and 12 respectively.
COOPER-ATOR EXPENSES Cooperator Contribution subject to reduction by Program Income. It is the total of columns (d) and (f). Expenses Subject to PI $0.00 Recommended PI deduction rate (to be used on invoices to determine amount FS owes. Total dollar amount (in the aggregate) can not exceed amount in column c, gross total less PI received). Any funds that would otherwise be FS PI share are to be retained by and used by Coop in future project(s) with the FS. #DIV/0!

% of PI applied to Expense #DIV/0!
Coop. Net Project Expense Cooperator Net Total Project Expenses (which excludes Cooperator In-kind Contributions) after reducing Cooperator expenses by the Cooperator's proportionate share of Program Income.
#DIV/0!
(n) Estimated Net Total Value








(j) Net Total Project Value: The sum of all the values provided toward the project with Estimated Gross Program Income taken into consideration. This figure reflects the true estimated cost of the project. $-






















Matching Costs Determination
Total Forest Service Share =

(k)
(a+b+c)/(j) = (k)

#DIV/0!
Other Federal Contribution =

(l)
(g)+(h)+(i)/(j) = (l)

#DIV/0!






Total Federal Share =

(m)






(k+l) = (m)

#DIV/0!





Total Cooperator Share

(n)






[(d+e+f) / (j) = (o)

#DIV/0!
Total

(o)





(m+n) = (o)

#DIV/0!

Sheet 13: V.3 Fin. Plan Long Form- No PI

Attachment:










USFS Agreement No.:
Mod No.




Cooperator Agreement No.:


















This Financial Plan may not be used to collect funds AND disburse funds on the same agreement. Separate agreements must be used in this situation.





























Agreements Financial Plan (Long Form) without Program Income











1. Financial Plan Matrix: Note: All columns may not be used. Use depends on source and type of contribution(s).



FOREST SERVICE CONTRIBUTIONS COOPERATOR CONTRIBUTIONS

(a) Forest Service Noncash Contribution: Forest Service noncash contributions may consist of employee salaries, overhead (indirect), travel provided, and/or equipment and supplies purchased and provided to the Cooperator for use in the project. These costs are an expense to the Forest Service, but do not include funding for reimbursement of Cooperator expenses. (a) (b) Forest Service Volunteer Labor (In-Kind) Contribution: This is the value of volunteer labor donated for completion of the project by the Forest Service for which the Forest Service has incurred no expense. Forest Service volunteer agreements (either sponsored or individual) should be used to document the donated services. The value of volunteer labor should be commensurate with local labor rates for similar work. (b) (c) Forest Service Cash to the Cooperator: This is the maximum amount of funding that will be reimbursed or advanced to the Cooperator. This is an expense to the Forest Service. (c) (d) Cooperator Noncash Contribution: These are expenses the Cooperator incurs that are contributed to the project in lieu of cash, but for which costs are incurred, such as employee salaries, overhead (indirect costs), travel, equipment, supplies, and so forth. These do not include in-kind contributions from third parties, such as donations from other entities or volunteer labor. (d) ashleejackson: (e) Value of Cooperator In-Kind Contribution: Cooperator in-kind contributions provided toward completion of the project for which the Cooperator has incurred no expense. These contributions can be made from the Cooperator or through the Cooperator by other entities and include such items as volunteer labor, donated materials, equipment, supplies, etc. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. (e) ashleejackson: (f) Cooperator Cash to the Forest Service: These are Cooperator cash contributions actually transferred to the Forest Service for use in completing the project. This is an expense to the Cooperator and does not include in-kind contributions made to the Cooperator from other organizations. Display by Cost Element where these funds will be expended. Be sure to cite a collection authority in the Agreement if this column is used. Include cash the Cooperator is transferring to the Forest Service for the project, that has been received as a grant(s) from a non-Federal entity(ies). (f) (g) (h) (i) (j) Gross Total Project Value: The sum of all the values provided toward the project without Estimated Gross Program Income taken into consideration. (j)
TOTAL


Volunteer Cash
Value of
Third Party
COST ELEMENTS Noncash Labor to Noncash In-Kind Cash to FS Cash Noncash In-Kind
(Direct Costs)
(In-Kind) Cooperator
Contributions
(g) Cooperator, Third Party Cash Contribution, Federal: This includes cash contributions provided to the Cooperator from another Federal agency for use in the project. Display these contributions by Cost Element Expenditures. Federal (h) Cooperator, Third Party Noncash Contribution, Federal: Noncash contribution provided to the Cooperator from Federal agencie(s) for use in the project. Display these contributions by Cost Element Expenditures. Federal (i) Cooperator, Third Party In-Kind Contribution, Federal: In-kind contribution provided to the Cooperator from Federal organization(s) for use in the project, for which the Cooperator has incurred no expense. Value assessed for volunteer labor and donated materials, equipment and supplies should be valued based on FSH 1509.11, Ch. 70. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. Display these contributions by Cost Element Expenditures. Federal
Salaries/Labor








0.00
Travel








0.00
Equipment








0.00
Supplies








0.00
Materials








0.00
Printing








0.00
This cost element can be replaced with a cost element unique to your agreement, for example 'sub-contracts'. Other








0.00
This cost element can be replaced with a cost element unique to your agreement. Other








0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Cooperator Indirect Costs








0.00
FS Overhead Assessment








0.00
Gross Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00











Matching Costs Determination






Total Forest Service Share =

(k)






(a+b+c)/(j) = (k)

#DIV/0!






Other Federal Contribution =

(l)






(g)+(h)+(i)/(j) = (l)

#DIV/0!






Total Federal Share =

(m)






(k+l) = (m)

#DIV/0!






Total Cooperator Share

(n)






[(d+e+f)/(j) = (o)

#DIV/0!






Total

(o)






(m+n) = (o)

#DIV/0!





























































2. Cost Analysis:








Use the following section to show additional information that supports the lump sum figures provided above. The following Cost Analysis boxes, (a)-(k), should provide a cost analysis of the corresponding matrix columns, (a)-(g), above, e.g. matrix column (a) FS Noncash Contribution should be analyzed under block (a), below, and matrix column (b) FS In-Kind Contribution should be analyzed under block (b), below, etc. Furthermore, each cost analysis box, below, should have clear labels indicating which cost element, above, is being analyzed, e.g. Salary/Labor = hrs or days x rate; Travel = miles x rate, or months x FOR rate (that is, days x per diem rate); Equipment Use = hrs or days x rate; Supplies & Materials--list of items and estimated cost; Printing = estimated cost per item; Indirect Cost = Direct cost x current indirect rate.

















If necessary, add additional sheets for cost analysis. To compress any unwanted portion(s) of this section, highlight the section to be hidden, then select "Format", "Row", and "Hide" from the toolbar.






FS Non-Cash Contributions ONLY: EXAMPLE Column (a): Salary GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (a)
FS Noncash Contribution













FSDefaultUser: FS In-Kind Contributions ONLY: EXAMPLE Column (b): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (b)
FS Volunteer Labor
(In-Kind) Contribution













FSDefaultUser: FS Obligation to Pay Cooperator ONLY: EXAMPLE Column (c): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (c)
FS Cash to the Cooperator













FSDefaultUser: Cooperator Non-Cash Contributions ONLY: EXAMPLE Column (d): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (d)
Cooperator Noncash Contribution













Column (e)
Cooperator Value of In-Kind Contributions












ashleejackson: FSDefaultUser: Cooperator Cash Contributions ONLY: EXAMPLE Column (f): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (f)
Cooperator Cash to the FS











Column (g)
Cooperator, Third Party Cash Contribution,
Federal











Column (h)
Cooperator, Third Party Noncash Contribution,
Federal











Column (i)
Cooperator, Third Party
In-Kind Contribution,
Federal


Sheet 14: V.4 Fin. Plan-Long Frm-With PI

Attachment:










USFS Agreement No.:
Mod. No.




Cooperator Agreement No.:

















This Financial Plan may not be used to collect funds AND disburse funds on the same agreement. Separate agreements must be used in this situation.



Agreements Financial Plan (Long Form) with Program Income











1. Financial Plan Matrix: Note: All columns may not be used. Use depends on source and type of contribution(s).

FOREST SERVICE CONTRIBUTIONS COOPERATOR CONTRIBUTIONS

(a) Forest Service Noncash Contribution: Forest Service noncash contributions may consist of employee salaries, overhead (indirect), travel provided, and/or equipment and supplies purchased and provided to the Cooperator for use in the project. These costs are an expense to the Forest Service, but do not include funding for reimbursement of Cooperator expenses. (a) (b) Forest Service Volunteer Labor (In-Kind) Contribution: This is the value of volunteer labor donated for completion of the project by the Forest Service for which the Forest Service has incurred no expense. Forest Service volunteer agreements (either sponsored or individual) should be used to document the donated services. The value of volunteer labor should be commensurate with local labor rates for similar work. (b) (c) Forest Service Cash to the Cooperator: This is the maximum amount of funding that will be reimbursed or advanced to the Cooperator. This is an expense to the Forest Service. (c) (d) Cooperator Noncash Contribution: These are expenses the Cooperator incurs that are contributed to the project in lieu of cash, but for which costs are incurred, such as employee salaries, overhead (indirect costs), travel, equipment, supplies, and so forth. These do not include in-kind contributions from third parties, such as donations from other entities or volunteer labor. (d) ashleejackson: (e) Value of Cooperator In-Kind Contribution: Cooperator in-kind contributions provided toward completion of the project for which the Cooperator has incurred no expense. These contributions can be made from the Cooperator or through the Cooperator by other entities and include such items as volunteer labor, donated materials, equipment, supplies, etc. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. (e) ashleejackson: (f) Cooperator Cash to the Forest Service: These are Cooperator cash contributions actually transferred to the Forest Service for use in completing the project. This is an expense to the Cooperator and does not include in-kind contributions made to the Cooperator from other organizations. Display by Cost Element where these funds will be expended. Be sure to cite a collection authority in the Agreement if this column is used. Include cash the Cooperator is transferring to the Forest Service for the project, that has been received as a grant(s) from a non-Federal entity(ies). (f) (g) (i) (k) (l) Gross Total Project Value: The sum of all the values provided toward the project without Estimated Gross Program Income taken into consideration. (l)
GROSS TOTAL BY LINE


Volunteer Cash
Value of
Third Party
COST ELEMENTS Noncash Labor to Noncash In-Kind Cash to FS Cash Noncash In-Kind
(Direct Costs)
(In-Kind) Cooperator
Contributions
(g) Cooperator, Third Party Cash Contribution, Federal: This includes cash contributions provided to the Cooperator from another Federal agency for use in the project. Display these contributions by Cost Element Expenditures. Federal (i) Cooperator, Third Party Noncash Contribution, Federal: Noncash contribution provided to the Cooperator from Federal agencie(s) for use in the project. Display these contributions by Cost Element Expenditures. Federal (k) Cooperator, Third Party In-Kind Contribution, Federal: In-kind contribution provided to the Cooperator from Federal organization(s) for use in the project, for which the Cooperator has incurred no expense. Value assessed for volunteer labor and donated materials, equipment and supplies should be valued based on FSH 1509.11, Ch. 70. These values are not reimbursable and can only be used to satisfy the Cooperator's matching requirement. Display these contributions by Cost Element Expenditures. Federal
Salaries/Labor








0.00
Travel








0.00
Equipment








0.00
Supplies








0.00
Materials








0.00
Printing








0.00
This cost element can be replaced with a cost element unique to your agreement, for example 'sub-contracts'. Other








0.00
This cost element can be replaced with a cost element unique to your agreement. Other








0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00
Cooperator Indirect Costs








0.00
FS Overhead Assessment








0.00
Gross Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00











Deductive Alternative is required. Assumes that all costs are allowable. PROGRAM INCOME (PI): CONTRIBUTIONS AND DEDUCTIVE ALTERNATIVE
(m) Estimated Gross Program Income (enter a number) (i) Estimated Gross Program Income: The gross income estimated to be generated under the project between the effective date of award and completion of the project, such as conference or workshop fees received, rental fees earned from renting real property or equipment acquired with agreement funds, or the sale of commodities or items developed under the project.
FOREST SERVICE EXPENSES FS Contribution subject to reduction by Program Income. It is the total of columns (a) and (c). Expenses Subject to PI $0.00 PI SUMMARY:
Estimated Cooperator cash reduction on expenses subject to PI
#DIV/0!

% of PI applied to Expenses #DIV/0! Estimated FS cash reduction on expenses subject to PI #DIV/0!
FS Net Project Expense Forest Service Net Total Project Expenses (which excludes Forest Service In-kind Contributions) after reducing Forest Service expenses by the Forest Service's proportionate share of Program Income.
#DIV/0! Estimated total amount FS will reimburse Cooperator from Cooperator invoice At the end of the project, if this amount is zero, the FS will pay the Cooperator nothing. If this amount is negative, the Cooperator will owe the FS the amount reflected here. #DIV/0!




Estimated number of invoices (enter a number, if known) Information for this block may not be known before the agreement is executed. In this case, leave blank. When entering a number, consider the billing cycle, e.g. quarterly or monthly. In these cases you would use 4 and 12 respectively.
COOPER-ATOR EXPENSES Cooperator Contribution subject to reduction by Program Income. It is the total of columns (d) and (f). Expenses Subject to PI $0.00 Recommended PI deduction rate (to be used on invoices to determine amount FS owes. Total dollar amount (in the aggregate) can not exceed amount in column c, gross total less PI received). Any funds that would otherwise be FS PI share are to be retained by and used by Coop in future project(s) with the FS. #DIV/0!

% of PI applied to Expense #DIV/0!
Coop. Net Project Expense #DIV/0!
(n) Estimated Net Total Value








(j) Net Total Project Value: The sum of all the values provided toward the project with Estimated Gross Program Income taken into consideration. This figure reflects the true estimated cost of the project. $-
Matching Costs Determination






Total Forest Service Share =

(o)






(a+b+c)/(j) = (k)

#DIV/0!






Other Federal Contribution =

(p)






(g)+(h)+(i)/(j) = (l)

#DIV/0!






Total Federal Share =

(q)






(k+l) = (m)

#DIV/0!






Total Cooperator Share

(r)






[(d+e+f) / (j) = (o)

#DIV/0!






Total

(s)






(m+n) = (o)

#DIV/0!

















2. Cost Analysis:








Use the following section to show additional information that supports the lump sum figures provided above. The following Cost Analysis boxes, (a)-(l), should provide a cost analysis of the corresponding matrix columns, (a)-(k), above, e.g. matrix column (a) FS Noncash Contribution should be analyzed under block (a), below, and matrix column (b) FS In-Kind Contribution should be analyzed under block (b), below, etc. Furthermore, each cost analysis box, below, should have clear labels indicating which cost element, above, is being analyzed, e.g. Salary/Labor = hrs or days x rate; Travel = miles x rate, or months x FOR rate (that is, days x per diem rate); Equipment Use = hrs or days x rate; Supplies & Materials--list of items and estimated cost; Printing = estimated cost per item; Indirect Cost = Direct cost x current indirect rate.

If necessary, add additional sheets for cost analysis. To compress any unwanted portion(s) of this section, highlight the section to be hidden, then select "Format", "Row", and "Hide" from the toolbar.

FS Non-Cash Contributions ONLY: EXAMPLE Column (a): Salary GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (a)
FS Noncash Contribution














FSDefaultUser: FS In-Kind Contributions ONLY: EXAMPLE Column (b): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (b)
FS Volunteer Labor
(In-Kind) Contribution














FSDefaultUser: FS Obligation to Pay Cooperator ONLY: EXAMPLE Column (c): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (c)
FS Cash to the Cooperator














FSDefaultUser: Cooperator Non-Cash Contributions ONLY: EXAMPLE Column (d): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (d)
Cooperator Noncash Contribution














FSDefaultUser: Cooperator Cash Contributions ONLY: EXAMPLE Column (f): Salary: GS 11 Biologist @ 40 hrs x $25.02/hr = $1,000.80, GS 5 Crew Leader @ 80 hrs x $12.79/hr = $1,023.20, GS 3 Crew 3 x 80hrs x $10.19/hr = $2445.60; Travel: 12 round trips x 50 miles x $.375/mi. = $225; Indirect Cost: $4,694.60 x 19.2% = $901.36 Column (e)
Cooperator Value of In-Kind Contributions












Column (f)
Cooperator Cash to the FS











Column (g)
Cooperator, Third Party Cash Contribution,
Federal











Column (i)
Cooperator, Third Party Noncash Contribution,
Federal











Column (k)
Cooperator, Third Party
In-Kind Contribution,
Federal
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy