Burden Calculation Tables

0982t13.xlsx

NSPS for Metallic Mineral Processing Plants (40 CFR part 60, subpart LL) (Renewal)

Burden Calculation Tables

OMB: 2060-0016

Document [xlsx]
Download: xlsx | pdf

Overview

# Respondents
# Responses
Table1_Respondent_Burden
Table2_Agency Burden


Sheet 1: # Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents





(E=A+B+C-D)
1 1 29 0 1 29
2 1 29 0 1 29
3 1 29 0 1 29
Average 1 29 0 1 29
1 New respondents include sources with constructed, reconstructed, and modified affected facilities.





Sheet 2: # Responses

Total Annual Responses
(A)
Information Collection Activity
(B)
Number of Respondents
(C)
Number of Responses
(D)
Number of Existing Respondents That Keep Records But Do Not Submit Reports
(E)
Total Annual Responses
E=(BxC)+D
Notification of construction/reconstruction 1 1 0 1
Notification of actual startup 1 1 0 1
Notification of initial performance test 1 1 0 1
Notification of CMS demonstration 1 1 0 1
Report of performance test (includes CMS demonstration report) 1 1 0 1
Semiannual scrubber report 29 2 0 58



Total 63

Sheet 3: Table1_Respondent_Burden

Table 1: Annual Respondent Burden and Cost – NSPS for Metallic Mineral Processing Plants (40 CFR Part 60, Subpart LL) (Renewal)






















Burden item








TECH $122.66
Burden item (A)
Person-hours
per occurrence
(B)
Annual occurrences
per respondent
(C)
Person-hours
per respondent
per year (AxB)
(D)
Respondents
per year a
(E)
Technical hours per
year (CxD)
(F)
Management hours per year (Ex0.05)
(G)
Clerical hours
per year
(Ex0.10)
(H)
Annual cost
($) b

MGMT $149.84
1. Applications N/A







CLER $60.88
2. Surveys and studies N/A









3. Reporting requirements










A. Familiarization with regulatory requirements 2 1 2 29 58 2.90 5.80 7,901.92


B. Required activities










Initial performance test 330 1 330 1 330 16.5 33 44,959.20


Repeat performance test c 330 1 330 0.2 66 3.3 6.6 8,991.84


C. Create information See 3B









D. Gather existing information See 3B









E. Write report










Notification of construction/reconstruction 2 1 2 1 2 0.1 0.2 272.48


Notification of actual startup 2 1 2 1 2 0.1 0.2 272.48


Notification of initial performance test 2 1 2 1 2 0.1 0.2 272.48


Report of performance test See 3B









Notification of CMS demonstration 2 1 2 1 2 0.1 0.2 272.48


Report of CMS demonstration See 3B









Semiannual scrubber report 8 2 16 29 464 23 46 63,215.36


Subtotal for Reporting Requirements



1,065 126,158


4. Recordkeeping requirements










A. Familiarization with regulatory requirements See 3A









B. Plan activities See 3A









C. Implement activities See 3A









D. Develop record system N/A









E. Time to enter information










Records of operating parameters 0.25 250 62.5 29 1,813 90.6 181 246,935


Records of startup, shutdown, malfunction 2 1 2 29 58 2.9 6 7,901.92


F. Train personnel 4 1 4 29 116 5.8 12 15,803.84


G. Audits N/A









Subtotal for Recordkeeping Requirements



2,284 270,641


TOTAL LABOR BURDEN AND COST (rounded)d



3,350 $397,000

53 hrs/resp
TOTAL CAPITAL AND O&M COST (rounded)d






$18,900


GRAND TOTAL (rounded)d






$416,000


Assumptions:










a On average, EPA estimates 29 existing sources will be subject to the NSPS. No new sources will become subject to the standard over the three-year period of this ICR. EPA also estimates one existing facility will undergo either a reconstruction or a physical or operational change such that it will be required to submit initial notifications and conduct initial performance testing.


b This ICR uses the following labor rates: $122.66 (technical), $149.84 (managerial), and $60.88 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


c EPA assumes 20 percent of respondents will have to repeat the performance test due to failure.


d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 4: Table2_Agency Burden

Table 2: Average Annual EPA Burden and Cost – NSPS for Metallic Mineral Processing Plants (40 CFR Part 60, Subpart LL) (Renewal)
































TECH $51.23
Burden item (A)
EPA
person-hours
per occurrence
(B)
Annual occurrences
per respondent
(C)
EPA
person-hours
per respondent
per year (AxB)
(D)
Respondents
per year a
(E)
Technical hours
per year
(CxD)
(F)
Management
hours per year
(Ex0.05)
(G)
Clerical hours
per year
(Ex0.10)
(H)
Annual cost
($) b

MGMT $69.04
Performance test review








CLER $27.73
Initial performance test 24 1 24 1 24 1.2 2.4 1,378.92


Repeat performance test c 24 1 24 0.2 4.8 0.24 0.48 275.78


Report review










Notification of construction/reconstruction 2 1 2 1 2 0.1 0.2 114.91


Notification of actual startup 0.5 1 0.5 1 0.5 0.03 0.05 28.73


Notification of initial performance test 0.5 1 0.5 1 0.5 0.03 0.05 28.73


Report of performance test (includes CMS demonstration report) 8 1 8 1 8 0.4 0.8 459.64


Notification of CMS demonstration 0.5 1 0.5 1 0.5 0.03 0.05 28.73


Semiannual scrubber report 4 2 8 29 232 12 23 13,329.56


TOTAL LABOR BURDEN AND COST (ROUNDED)d



313 $15,600


a On average, EPA estimates 20 existing sources will be subject to the NSPS. No new sources will become subject to the standard over the three-year period of this ICR. EPA also estimates one existing facility will undergo either a reconstruction or a physical or operational change such that it will be required to submit initial notifications and conduct initial performance testing.


b This ICR uses the following labor rates: $51.23 (technical), $69.04 (managerial), and $27.73 (clerical). These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c EPA assumes 20 percent of respondents will have to repeat the performance test due to failure.


d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.