Download:
pdf |
pdfU.S. Department of the Interior
Office of Natural Resources Revenue
1 Payor Name:
Address:
City:
OMB Control Number 1012-0002
OMB Approval Expires 12/31/2018
Oil Transportation Allowance Report
Form ONRR-4110
For ONRR Use Only
State: Zip:
4 For Payor Use Only
2 Payor Code:
3 Report Type:
6
7
Lease Number
8
Agreement Number
5 Reporting Period (mm/dd/ccyy):
9
Product 10
Royalty Quantity
Code
to
11
Allowance Rate
Per Unit
12
Royalty Allowance
Amount
1
2
3
4
5
6
7
8
9
10
13 Page Total
14 Report Total (From Last Page)
If more lines are needed, attach additional pages to Form ONRR‐4110
I have read and examined in this report and, to the best of my knowledge, they are accurate and complete.
Name (First, Middle Initial, Last) (Typed or Printed):
Date:
Authorized Signature:
Date:
Name of Preparer:
Telephone Number:
This information should be considered (Please check one):
Proprietary
Nonprorietary
The Paperwork Reduction Act of 1995 (PRA) Statement: The PRA (44 U.S.C. 3501 et seq.) requires us to inform you that we collect this information to corroborate oil and gas production and disposition data with sales
and royalty data. Proprietary information is protected in accordance with the standards established by the Federal Oil and Gas Royalty Management Act of 1982 (30 U.S.C. 1733), the Freedom of Information Act
[5 U.S.C.552(b)(4)], and the Department regulations (43 CFR 2). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB
Control Number. Annual public reporting burden for this form is estimated at an average of 21 hours per report for electronic and manual reporting, including the time for reviewing instructions; gathering and
maintaining data; and completing and reviewing the form. Direct your comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Office of Natural
Resources Revenue, Mail Stop 64400B, Denver Federal Center, Lakewood, CO 80225.
Form ONRR-4110 (Rev. 9/2018)
Page 1 of 4
Oil Transportation Allowance Report
Form ONRR-4110
General Instructions
You will find an electronic copy of form ONRR-4110 on the Office of Natural Resources Revenue (ONRR)
website at https://www.onrr.gov/ReportPay/royalty-reporting.htm#forms, to print, complete and submit
to ONRR as follows:
Office of Natural Resources Revenue
Document Processing
Denver Federal Center, Building 85
6th Ave. and Kipling St.
P.O. Box 25165
Denver, Colorado 80225-0165
This form will be used to determine and report the costs of transporting oil under 30 CFR 1206.57.
Allowable transportation costs are non-arm’s-length based allowances--operating and maintenance
expenses, overhead, and either depreciation and a return on undepreciated capital investment or a cost
equal to the initial capital investment in the transportation system multiplied by Standard and Poor’s BBB
rating. Allowable costs divided by lease production is the transportation allowance rate.
In accordance with 30 CFR 1206.56, a payor may deduct from royalty payments the reasonable, actual
costs incurred by the lessee to transport oil to a point off the lease. When lease production contains more
than one product, you cannot deduct the cost of transporting non-royalty bearing production without
ONRR approval.
For transportation costs incurred under other than arm’s-length conditions or when transportation costs
are a combination of arm’s-length and non-arm’s-length costs, Schedules 1, 1A, 1B, and 1C, as
appropriate, will be used to determine the allowance and will be submitted to ONRR with Page 1 of form
ONRR-4110.
Requirements: A transportation allowance may be claimed retroactively for a period of not more than 3
months prior to the first day of the month that form ONRR-4110 is filed with the ONRR. Unless, we
approve a longer period upon a showing of good cause by the lessee. After the initial reporting period
lessees must submit form ONRR-4110 within 3 months after the end of the calendar year.
Definitions (for purposes of this report):
Sale: The disposition of oil under arm’s-length contract, non-arm’s-length contract, or no contract
situation.
Transportation facility: A physical system associated with the transportation of oil from the lease to a
point of disposition remote from the lease.
Transportation segment: Any mode of transportation from one point to another for which the payor can
associate unique, identifiable costs. A transportation segment may be part of the total transportation
facility or may constitute the entire facility. Examples of a transportation segment would be an origin-todestination pipeline owned by the lessee to transport the oil to a point on a third-party pipeline through
which the oil is transported under an arm’s-length contract to the sales point.
Forms:
Form ONRR-4110 Page 1, is used to report the allowance amounts claimed during the reporting period.
Responses for non-arm's-length transportation allowances on this form are required to obtain a benefit;
however, arm's-length transportation contracts must be filed with ONRR since arm's-length transportation
allowances are not required to be reported on this form.
Form ONRR-4110 (Rev. 9/2018)
Page 2 of 4
Oil Transportation Allowance Report
Form ONRR-4110
General Instructions
From ONRR-4110 Schedule 1, is used to accumulate segment costs and to compute the allowance rate
for a transportation facility.
Form ONRR-4110 Schedule 1A, summarizes operating, maintenance, and overhead costs for a nonarm’s-length or no contract transportation segment.
Form ONRR-4110 Supplemental Schedule 1A, lists, in detail, operating, maintenance, and overhead
costs that could not be shown on Schedule 1A because of its limited space.
Form ONRR-4110 Schedule 1B, summarizes depreciation and undepreciated capital investment costs
for a non-arm’s-length or no contract transportation segment.
Form ONRR-4110 (Rev. 9/2018)
Page 3 of 4
Oil Transportation Allowance Report
Form ONRR-4110
Line-by-line Instructions
1. Enter the payor name and address used to report royalties and transportation deductions on form
ONRR-2014.
2. Enter the same payor codes as used on form ONRR-2014.
3. Enter the report type indicator as follows:
“1” if this is an initial report for the transportation facility
“2” if this is a corrected report to correct previously reported data. A corrected report
requires a two-line entry. The first line reverses the original entry using a minus sign (-) in
columns 10, 11, and 12, as applicable, and the second line shows the correct entry.
4. Reserved for a payor’s comment.
5. Enter as the reporting period the period covered by the cost data for the transportation allowance
being reported in columns 10, 11 and 12. The reporting period will be: (a) for the initial reporting
period, beginning the month the lessee is first authorized to deduct a transportation allowance
and ending at the end of the calendar year or when the transportation terminates, whichever is
earlier, or (b) after the initial reporting period, beginning the first day of the calendar and ending
the last day of the calendar year or when the transportation terminates, whichever is earlier.
6. Line count; such as the number of leases being reported.
7. Enter the same Lease Number as used on form ONRR-2014.
8. Enter the same Agreement Number (if applicable) as reported on form ONRR-2014.
9. Enter the same product code as used on form ONRR-2014.
10. Enter the royalty quantity transported during the reporting period.
11. Enter the lesser of the transportation allowance rate from Schedule 1, line 16, or 50 percent of the
unit value of the oil unless ONRR has approved a rate in excess of 50 percent..
12. Enter the royalty allowance amount determined by multiplying column 10 by column 11.
13. Enter page totals on line 13.
14. If more than one form ONRR-4110 is submitted, add the amount on line 13 for each page and
enter the total only once on line 14 of the last page of the Oil Transportation Allowance Report.
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.
Form ONRR-4110 (Rev. 9/2018)
Page 4 of 4
U.S. Department of the Interior
Office of Natural Resources Revenue
1 Payor Name and Code
Adderss
City
State
3 Period (mm/dd/ccyy)
to
(a)
OMB Control Number 1012-0002
OMB Approval Expires 12/31/2018
Oil Transportation Facility Summary Sheet
Form ONRR-4110, Schedule 1
(b)
Mode of
Segment Name or Number
Transportation
From
To
A. TRANSPORTATION SEGMENT FROM LEASE
2 Lease Number
Agreement Number
Facility Name/ID Number
Zip
(c)
Operating Costs
CHOOSE EITHER METHOD A OR METHOD B
Method A
Method B
Initial Capital Investment in
Depreciation and Undepreciated Capital
Transportation System
Investment in Transportation System
(d)
(f)
(g)
(h)
(i)
(e)
Undepreciated Capital Return on
Return on
Rate of
Investment at
Investment Initial Capital Investment
Return Depreciation Beginning of Year
(d) x (f)
Investment
(d) x (h)
4
5
6
7
8
Totals:
Allowance rate for Method A = (lines 8c + 8e + 8g) / Volume of
Production transported from the lease.
Allowance rate for Method B = (lines 8c + 8i) / Volume of
Production transported from the lease.
=
÷
Part A Total Costs
Part A Total Volume
9
Cost Per Barrel
use either method A or B
B. TRANSPORTATION SEGMENT AFTER LEASE
10
11
12
13
14
Totals:
Allowance rate for Method A = (lines 14c + 14e + 14g) / Volume of
Production transported after the lease.
Allowance rate for Method B = (lines 14c + 14i) / Volume of
Production transported after the lease.
=
÷
Part B Total Costs
Part B Total Volume
Cost Per Barrel
use either method A or B
16
Total Unit Allowance Rate = the sum of lines 9h and 15h. The allowance
cannot exceed 50 percent of the value of the product without prior ONRR approval.
THIS INFORMATION SHOULD BE CONSIDERED (please check one)
Form ONRR-4110 Schedule 1 (Rev. 9/2018)
15
___ PROPRIETARY
Allowance Rate
___ NONPROPRIETARY
Page 1 of 3
Oil Transportation Allowance Report
Form ONRR-4110
Schedule 1 Instructions
Form ONRR-4110, will be used to determine the transportation allowance amount for each Lease
Number and Agreement Number (if applicable), combination. No allowance may be claimed if the facility
is entirely on the lease.
Part A is used to accumulate segment costs and to compute an allowance for transporting oil from the
lease to a separation facility remote from where the lease is situated. Part B is used to accumulate
segment costs and compute an allowance for transporting oil from either a lease, or from a separation
facility, to the nearest available market place or sales outlet remote from the lease. When oil is
transported to a separation facility, treated, and clean oil is transported from the facility to a remote sales
point, both Parts A and B must be used in computing the allowance.
1. Enter the same payor name, payor code, and address as used on Page 1 of form ONRR-4110.
2. Enter the same Lease Number(s) and Agreement Number(s) (if applicable), combination as used
on form ONRR-2014. Enter the transportation facility name or identification number (as
designated by the payor) unique to the transportation facility. (Note: For a transportation facility
consisting of only one segment, the segment name or number will be the same as the facility
name or number.)
3. Enter the reporting period. The period must be the same period shown in item 4 on form ONRR4110, Oil Transportation Allowance Report.
The following instructions are applicable to Part A (lines 4-7) and Part B (lines 10-13):
a. Describe each segment of the transportation facility; e.g., form Lease No. XX-YYYYY-Z
to St. John treatment facility.
b. Identify the mode of transportation under which costs are incurred; e.g., pipeline, truck,
rail, tanker, barge, etc.
c.
Using Schedule 1A determine the operations, maintenance, and overhead expenditures
and enter in column (d). A separate Schedule 1A must be completed for each individual
segment.
d. The rate of return shall be the industrial rate associated with Standard and Poor’s BBB
rating. Enter the monthly average rate as published in Standard and Poor’s Bond Guide
for the first month of the reporting period.
CHOOSE EITHER METHOD A (depreciation and undepreciated capital investment in the transportation
system) OR METHOD B (initial investment in the transportation system)
METHOD A:
e. Enter depreciation costs for the reporting period. Schedule 1B must be used to determine
depreciation costs.
f.
Enter the beginning-of-year undepreciated capital investment. Schedule 1B must be used
to determine beginning-of-year undepreciated capital investment. A separate Schedule
1B must be completed for each individual segment.
g. Calculate the return on undepreciated capital investment by multiplying column (d) by
column (f).
Form ONRR-4110 Schedule 1 (Rev. 9/2018)
Page 2 of 3
Oil Transportation Allowance Report
Form ONRR-4110
Schedule 1 Instructions
METHOD B:
h. Enter the initial investment in the capital investment.
i.
Calculate the return on the initial capital investment by multiplying column (d) by column
(h).
8. If using Method A; Total columns (c), (e), and (g) and enter the result on lines 8c, 8e, and 8g.
If using Method B; Total columns (c) and (i) and enter the result on lines 8c, and 8i.
9. For Part A:
If using Method A, sum lines 8c, 8e, and 8g and enter the result on line 9 – Total Costs.
If using Method B, sum lines 8c and 8i and enter the result on line 9 – Total Costs.
Enter total volume of production transported from the lease, as measured at the approved royalty
measurement point, to the facility on line 9 – Total Volume. Compute the allowance cost per
barrel, to six decimals, by dividing line 9 – Total cost by line 9 – Total Volume, and enter the
result on line 9h.
10. 10-13, see (a)–(i) above.
14. If using Method A; Total columns (c), (e), and (g) and enter the result on lines14c, 14e, and 14g.
If using Method B; Total columns (c) and (i) and enter the result on lines 14c, and 14i.
Enter total volume of production transported from the lease, as measured at the approved royalty
measurement point, to the facility on line 9 – Total Volume. Compute the allowance cost per
barrel, to six decimals, by dividing line 9 – Total cost by line 9 – Total Volume, and enter the
result on line 9h
15. For Part B:
If using Method A, sum lines 14c, 14e, and 14g and enter the result on line 15 – Total Costs.
If using Method B, sum lines 14c and 14i and enter the result on line 15 – Total Costs.
Enter the total volume transported from the lease or treatment facility on line 15 – Total Volume
(Note: Total volume is the volume transported through the transportation facility for the prior
reporting period.) Compute the allowance costs per barrel, to six decimals, by dividing line 15 –
Total Cost, by line 15 – Total Volume, and enter the result on line15h.
16. The total unit allowance rate is equal to the sum of line 9h plus line 16h. Enter this allowance rate
on line 16h. The allowance rate cannot exceed 50 percent of the value of the product without
prior ONRR approval.
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.
Form ONRR-4110 Schedule 1 (Rev. 9/2018)
Page 3 of 3
U.S. Department of the Interior
Office of Natural Resources Revenue
Transportation System/Segment Operations,
Maintenance, and Overhead Expenditures
Form ONRR-4110, Schedule 1A
Payor Name and Code:
Lease Number:
Agreement Number:
Facility Name/ID Number:
Segment ID Number:
Period (mm/dd/ccyy):
OMB Control Number 1012-0002
OMB Approval Expires 12/31/2018
to
A. Lessee's Operating Costs for System/Segment
Operations Supervision and Engineering
Operations Labor
Utilities
Materials
Ad Valorem Property Taxes
Rent
Supplies
Other (specify)_________________________
Other (specify)_________________________
Total Operating Costs - Subtotal
(Attach Supplemental Schedule 1A as necessary)
1
2
3
4
5
6
7
8
9
10
B. Lessee's Maintenance Costs for System/Segment
Maintenance Supervision
Maintenance Labor
Materials
Other (specify)_________________________
Other (specify)_________________________
Total Maintenance Costs - Subtotal
(Attach Supplemental Schedule 1A as necessary)
11
12
13
14
15
16
C. Lessee's Overhead Allocation (specify)
17
18
19
20
Total Overhead Allocation
(Attach Supplemental Schedule 1A as necessary)
D. Total Operating, Mantenance and Overhead Costs
(line 10 + line 16 + line 20)
21
E. Allocated to Segment
Lease Volume_______________ ÷ Total throughput_______________
22
F. Segment Allocated Operating, Maintenance, and Overhead Costs
(line 21 x line 22) Enter in column c, Schedule 1
THIS INFORMATION SHOULD BE CONSIDERED (Please check one)
Form ONRR-4110, Schedule 1A (Rev. 9/2018)
23
___PROPRIETARY
___NONPROPRIETARY
Page 1 of 3
Non-Arm’s-Length Transportation System/Segment Operations
Maintenance, and Overhead Expenditures
Form ONRR-4110, Schedule 1A Instructions
Schedule 1A is used to record reasonable actual operating, maintenance, and overhead costs for a
transportation segment for the prior reporting period. A separate Schedule 1A must be completed for
each segment in the transportation facility. The costs for all transportation facility segments are
accumulated on Schedule 1 to determine the total operating costs for the facility. A list of allowable and
non-allowable costs is provided herein and should be used as a guide in determining operating,
maintenance, and overhead costs.
Complete the payor information block as follows:
Enter the same payor name and code as used on form ONRR-4110, Oil Transportation Allowance
Report.
Enter the same Lease Number(s) and Agreement Number(s) (if applicable), as used on form ONRR2014.
Enter the transportation facility name or identification number (as designated by the payor) unique to the
transportation facility.
Enter the transportation segment name or identification number (as designated by the payor) unique to
the transportation segment. Note: For a transportation facility consisting of only one segment, the
segment name or identification number will be the same as the facility name or identification number.
Enter the reporting period. The period must be the same period shown in item 5 on form ONRR-4110, Oil
Transportation Allowance Report.
Instructions for Computing Operating, Maintenance, and Overhead Costs:
Identify and list on Part A and part B all operating and maintenance costs directly attributable to the
transportation facility/segment during the reporting period. If additional space is needed to identify or
explain other cost items, complete and attach a Supplemental Schedule 1A noting the nature and amount
of the cost.
Line 10 – Enter total operating costs (the sum of lines 1-9).
Line 16 – Enter total maintenance costs (the sum of lines 11-15)
Part C – Identify and list all overhead costs directly allocable and attributable to the operations and
maintenance of the transportation facility/segment. If additional space is needed, complete and attach a
Supplemental Schedule 1A noting the nature and amount of the expenditure.
Line 20 – Sum lines 17 through 19 to obtain the total overhead expenditure directly allocable to the
facility/segment.
Line 21 – Sum line 10, 16, and 20 to obtain the total operating costs.
Part E - Enter the lease volume transported through this segment and the total throughput of this
segment. Divide the lease volume by the total throughput and enter the result in six decimal places on
line 22.
Part F – Determine the allocated operating, maintenance, and overhead costs for the segment by
multiplying line 21 times line 22 and enter on line 23. Enter the result in column (c) of Part A or B,
Schedule 1, as appropriate.
Indicated by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.
Form ONRR-4110, Schedule 1A (Rev. 9/2018)
Page 2 of 3
Non-Arm’s-Length Transportation System/Segment Operations
Maintenance, and Overhead Expenditures
Form ONRR-4110, Schedule 1A Instructions
ALLOWABLE AND NONALLOWABLE OPERATING, MAINTENANCE AND CAPITAL COSTS
Allowable Capital Costs – Allowable capital costs are generally those costs for depreciable fixed assets
(including costs of delivery and installation of capital equipment) which are an integral part of the
transportation system. The following capital items are generally considered as allowable: garages and
warehouses, rail haulage equipment including rail spurs, trucks, barges, pipeline compressors and
pumps, and roads.
Non-allowable Capital Costs – Costs incidental to marketing (for example, on-lease compression,
gathering, separation, dehydration, storage, and treatment). Also, schools, hospitals, roads, sewer and
other capital improvements or equipment not an integral part of the transportation facility are not
allowable capital costs. The capital costs associated with the preparation of an environmental impact
statement is not allowable. However, capital costs for environmental equipment that are an integral part of
transportation facility are allowable.
Allowable Operating Costs – Allowable operating and maintenance costs are those non-depreciable
costs that are directly attributable to the operation and maintenance of a transportation facility/segment.
These expenditures include the following:
1. Salaries and wages paid to employees and supervisors while engaged in the operation and
maintenance of equipment and facilities.
2. Fuel and utility costs directly related to transporting lease products.
3. Chemicals (including rust preventives and thinning agents) and lubricants used for the purpose of
enhancing flow, protection, or cleaning.
4. Repairs, labor, materials, and supplies directly related to transportation equipment and facilities.
5. Port and toll fees, insurance, and ad valorem property taxes (Federal and State income taxes are
not allowable deductions.)
6. Arm’s-length rental, leasing, or contract service costs for equipment, facilities, on-site location or
maintenance of equipment and facilities.
7. Overhead costs (personnel, telephone service, payroll taxes, employee benefits, vehicle
expenses, supplies, etc.). The total of these costs shall be limited to those reasonable
expenditures directly attributable and allocable to the operating and maintenance of the
transportation equipment and facilities.
Non-allowable Operating Costs
1. Costs incidental to marketing; e.g., on-lease gathering and storage, compression, separation, and
dehydration; also, heaters, treaters, meters, water knockouts, ACT meters, meter sleds, and
pumps (surface, subsurface, and circulating), and operating costs associated with non-allowable
capital expenditures.
2. Actual or theoretical losses (based on volume or value) are not allowable transportation costs.
However, these costs are allowable if they are based on a FERC- or State-approved tariff.
3. Federal and State income taxes, production taxes, royalty payments, or fees such as State
severance taxes.
4. The value of fuel taken from the gas stream and used to run compressors and pumps. Costs for
services that the lessee is obligated to perform at no cost to the Federal Government or Indian
owner.
Form ONRR-4110, Schedule 1A (Rev. 9/2018)
Page 3 of 3
U.S. Department of the Interior
OMB Control Number 1012-0002
Office of Natural Resources Revenue
OMB Approval expires 12/31/2018
Non-Arm's-Length Transportation
System/Segment Operations, Maintenance, and
Overhead Expenditures Form ONRR-4110,
Supplemental Schedule 1A
Payor Identification Block
Payor Name and Code: _____________
Lease Number: ____________________
Agreement Number: ________________
Facility ID No: _____________________
Segment ID No: ___________________
Period:
to
(mm/dd/ccyy)
Type of Expenditure - Describe
$
Total
THIS INFORMATION SHOULD BE CONSIDERED (Please check one)
Form ONRR-4110 Supplemental Schedule 1A (Rev. 9/2015)
$
PROPRIETARY
NONPROPRIETARY
Page 1 of 2
Non-Arm’s-Length Transportation System/Segment Operations,
Maintenance, and Overhead Expenditures
Form ONRR-4110, Supplemental Schedule 1A
Instructions
Supplemental Schedule 1A is used to identify and document operating, maintenance, and overhead
expenditures listed under the “Other” expenditure categories on Schedule 1A.
Complete the payor identification block (see Schedule 1A instructions).
A separate Supplemental Schedule 1A must be prepared for other operating costs, other maintenance costs,
and other overhead costs associated with the transportation facility/segment.
Describe and specify each expenditure item and amount. Receipts and invoices should be retained in the
office of the payor subject to audit.
Sum the amounts of each expenditure and list on the total line.
Enter the total amount of the operations, maintenance, or overhead expenditures on Schedule 1A, lines 9,
15, or 19 accordingly.
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.
Form ONRR-4110, Supplemental Schedule 1A (Rev. 9/2015)
Page 2 of 2
U.S. Department of the Interior
Office of Natural Resources Revenue
OMB Control Number 1012-0002
OMB Approval Expires 12/31/2018
Agreement Number:
Facility ID Number:
Non-Arm's Length Transportation System/Segment
Depreciation and Capital Expenditure Summary
Form ONRR-4110, Schedule 1B
1
2
Expenditure
Item
Initial Capital
Investment and
Date Placed in
Service
$
Salvage Value
Segment ID Number:
Period (mm/dd/ccyy):
4
5
Depreciable Life /
Expected Units of
Life
Years of
Depreciation /
Units Taken
to Date
3
PAYOR IDENTIFICATION BLOCK
Payor Name and Code:
Lease Number:
$
6
Undepreciated
Capital Investment
at Beginning of
Year
$
Totals $
Allocated to Segment (from line 22, Schedule 1A) %
Segment Depreciation and Capital Expenditure
(Line 8 x Line 9) Enter in column g and e, Schedule 1 $
THIS INFORMATION SHOULD BE CONSIDERED (Please Check One)
Form ONRR-4110 Schedule 1B (Rev. 9/2018)
___PROPRIETY
to
7
8
Depreciation
Undepreciated
Capital
Investment at
End-of-Year
$
$
%
9
10
$
11
$
___NONPROPRIETY
Page 1 of 2
Non-Arm’s-Length Transportation System/Segment
Depreciation and Capital Expenditures Summary
Form ONRR-4110, Schedule 1B Instructions
Schedule 1B is used to summarize facility/segment depreciation and undepreciated capital investment for
computing return on investment. A separate Schedule 1B must be completed for each segment in the
transportation facility. The costs of all transportation facility segments are accumulated on Schedule 1 to
determine the total depreciation and undepreciated capital investment for the facility.
Complete the payor identification block (see Schedule 1A instructions).
For each facility/segment capital expenditure item, complete one line as follows:
1. Identify the capital expenditure item.
2. Enter the initial capital expenditure amount and the date the expenditure was placed in service.
3. Enter a reasonable salvage value.
4. Enter the depreciable life of the expenditure or the expected units of life.
5. Enter the number of years of depreciation or units of life taken to date.
6. Enter the undepreciated capital investment at beginning-of-year. In computing this value, salvage
must be deducted from the initial capital investment.
7. Enter the amount of depreciation to be taken for the year. In computing depreciation, the payor
may elect to use a straight-line depreciation method based on the life of the equipment or on the
life of the reserves or a unit of production method. Once an election is made, the payor may not
alternate methods without ONRR approval. Equipment shall not be depreciated below a
reasonable salvage value.
8. Enter the undepreciated capital investment at end-of-year. This is computed by subtracting
Depreciation (column 7) from the Undepreciated Capital Investment at Beginning of Year (column
6). This amount will be used as the next year’s beginning-of-year undepreciated capital
investment.
9. Total columns 6 and 7.
10. Enter the “Allocated to Segment” amount from line 22, Schedule 1A, on line 10, columns 6 and 7.
11. Multiply line 9 by line 10 for columns 6 and 7 and enter the result on line 11 and on Schedule 1,
columns e and f, Parts A and B as appropriate.
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.
Form ONRR-4110 Schedule 1B (Rev. 9/2018)
Page 2 of 2
File Type | application/pdf |
Author | Minerals Revenue Management |
File Modified | 2018-11-16 |
File Created | 2012-09-26 |