FS-2400-0078 Annual Operating Schedule

Timber Sale Contract Operations and Administration

FS-2400-0078 v04-2013

Contract Operations and Administration

OMB: 0596-0225

Document [pdf]
Download: pdf | pdf
Annual Operating Schedule
Ref. FSM 2450

FS-2400-0078 (REV. 04-2013)
OMB 0596-0225 (EXP. XX/20XX)

(For optional use with Timber Sale Contract Forms FS-2400-6, 6T, 3, 3T and Integrated Resource Contract forms
FS-2400-13 and 13T)
National Forest

Ranger Dist

This Annual Operating Schedule is submitted in accordance with provision B(T)6.31 or G(T).3.1 the period
FROM Month

Day

Year

TO Month

Sale Name

Day

Year

Purchaser

Contract No.

Termination Date

/ /

Road Completion Date

/ /

Normal Operating Season
1st Period

to
to

2nd Period
Volume Remaining

Inclusive
Inclusive
Volume to Remove This Year

Specified Road Construction/Reconstruction
(see detailed schedule in annual supplement to General Plan (B(T)6.312)
Planned Periods for Specified Road Construction and Reconstruction
/ /

Staking Needed by
(date)

N/A IF NOT APPLICABLE

Material Delivery Needed by
(date)

/ /
N/A IF NOT APPLICABLE

Road Maintenance B(T)5.3, F(T).3
Pre-haul Maintenance

Begin Date

/ /

Completion Date

During Haul Maintenance
Post Haul Maintenance

/ /

Commensurate With Use
Begin Date

/ /

Completion Date

/ /

Road Maintenance B(T)5.3, F(T).3
Logging
Logging Method 1
Cutting Unit

Move In Date
/ /

Equipment Type
Completion Date
/ /

/ /

/ /

/ /

/ /

/ /

/ /

Remarks

Estimated Production Rate
Equipment Type

Logging Method 2
Cutting Unit

Move In Date

Completion Date

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

Remarks

Estimated Production Rate
File Code: 2450

Page 1 of 3

FS-2400-0078 (REV. 04-2013)
OMB 0596-0225 (EXP. XX/20XX)

(For optional use with Timber Sale Contract Forms FS-2400-6, 6T, 3, 3T and Integrated Resource Contract forms
FS-2400-13 and 13T)
For use with FS-2400-13(T) Integrated Resources Timber Contracts Only
Operating Schedule Starting

Month

Day

Year

Stewardship Projects G(T).3.1

Mandatory (M) and Optional (O) Stewardship Project Schedule
PROJECT

M
or
O

START
DATE

COMPLETION
DATE

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

ANTICIPATED
STEWARDSHIP
CREDITS

REMARKS

Additional Remarks

Representatives B(T)6.1, G(T). 1
Field Supervisor

Phone ( )

-

Field Supervisor

Phone ( )

-

Field Supervisor

Phone ( )

-

Field Supervisor

Phone ( )

-

Individuals Designated to Receive and/or Issue Product Removal Permits (if applicable) B6.84, G.8.4
Name

Phone ( )

-

Name

Phone ( )

-

Name

Phone ( )

-

Scaling Location
Attach Designated Scaling Site Agreement (if applicable)
Haul Route B6.841, G.8.4.1: (Attach Map)
File Code: 2450

Page 2 of 3

FS-2400-0078 (REV. 04-2013)
OMB 0596-0225 (EXP. XX/20XX)

Additional Plans Attached (as applicable)
Traffic Control
Fire Plan
Spill Prevention
Road Maintenance
Skidding and Yarding
Other

/ /

Submitted by
Signature
(Purchaser/Purchaser's
Representative)

Print Name

Date

/ /

Acknowledge Receipt
Signature
(Forest Service)

Print Name

Date

FS-2400-0078: Public burden for this collection is estimated to be between 1 and 2 hours per response, including time
for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing
and reviewing the collection of information. Under the Paperwork Reduction Act of 1995, an agency shall not conduct or
sponsor, and no persons are required to respond to, a collection of information unless it displays a valid OMB control
number. The valid OMB control number for this collection of information is 0596-0225.

File Code: 2450

Page 3 of 3


File Typeapplication/pdf
File TitleFS-2400-0078 .pff
Authorwdcota
File Modified2014-05-15
File Created2014-05-15

© 2024 OMB.report | Privacy Policy