NESHAP for Polyvinyl Chloride and Copolymer Production (40 CFR part 63, subpart HHHHHHH) (Proposed Rule)

ICR 202011-2060-002

OMB: 2060-0666

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2020-11-20
Supporting Statement A
2020-11-20
IC Document Collections
IC ID
Document
Title
Status
197774
Modified
ICR Details
2060-0666 202011-2060-002
Received in OIRA 201903-2060-013
EPA/OAR 2432.05
NESHAP for Polyvinyl Chloride and Copolymer Production (40 CFR part 63, subpart HHHHHHH) (Proposed Rule)
Revision of a currently approved collection   No
Regular 12/09/2020
  Requested Previously Approved
36 Months From Approved 04/30/2022
42 45
335,830 338,000
6,926,000 7,060,000

The current National Emission Standards for Hazardous Air Pollutants (NESHAP) for Polyvinyl Chloride and Copolymers (PVC) Production (40 CFR Part 63, Subpart HHHHHHH) were proposed on May 20, 2011, and promulgated on April 17, 2012. These regulations apply to both existing and new major source PVC production facilities. Area source PVC production facilities are subject to 40 CFR Part 63, Subpart DDDDDD and are not covered in this ICR. New facilities include those that commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 63, Subpart HHHHHHH. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.

US Code: 42 USC 7414 Name of Law: Clean Air Act
  
None

2060-AR73 Proposed rulemaking 85 FR 71490 11/09/2020

No

1
IC Title Form No. Form Name
NESHAP for Polyvinyl Chloride and CoPolymer Production

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 42 45 0 -3 0 0
Annual Time Burden (Hours) 335,830 338,000 0 -2,170 0 0
Annual Cost Burden (Dollars) 6,926,000 7,060,000 0 -134,000 0 0
No
Yes
Miscellaneous Actions
There is an overall reduction in the burden hours in this ICR, compared to the previous ICR, due to the elimination of wastewater TOHAP testing requirements.

$245,000
No
    No
    No
No
No
No
No
Amber Iglesias 202 564-3175 iglesias.amber@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/09/2020


© 2024 OMB.report | Privacy Policy